Construction of Roads Under MMGSY of Amreli District Package No.AMR/BUJ(EW to BT)/2022-


23/P.06 Taluka-Babara District-AmreliGirsomnath

SCHEDULE "B"
Memorandum showing items of works to be carried out
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
1 1.65 Hect Clearing and grubbing of road land 32361.25 Rupees One 53396.06
incl.uprooting rank vegetation, Thirty Two Hect.
grass, bushes, shurbs, saplings and Thousand
trees girth upto 300mm removal of Three
stumps of trees cut earlier and Hundred
disposal of unserviceable materials Sixty One
© By mechanical means in area of And Paise
Light jungle. Twenty Five
Only
2 35844.00 Cum Earthwork for embankment 160.24 Rupees One One 5743642.56
including breaking clods, dressing Hundred Cum
with all lead and lift (Excluding Sixty And
watering and consolidation) (A) Paise Twenty
From borrow area with all lead and Four Only
lift.Executed with
machineries.(Selected soil to be
used for earthwork shall be from
BORROW AREA only having
CBR not less than 6.00)
3 3276.00 Cum Earthwork in cutting in all sorts of 85.16 Rupees One 278984.16
soil and soft Murrum including Eighty Five Cum
conveying and spreading the suff And Paise
embankment as and where directed Sixteen Only
within 200 meters from the end of
the cutting with all required lead
and lift.
Page 2

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
4 3081.00 Cum WBM Grading 1 757.04 Rupees One 2332440.24
Providing, laying, spreading and Seven Cum
compacting stone aggregates of 90 Hundred
to 45mm sizes to water bound Fifty Seven
macadam specification including And Paise
spreading in uniform thickness, Four Only
hand packing, rolling with smooth
wheel roller 80-100 kN in stages to
proper grade and camber, applying
and brooming, stone
screening/binding materials to fill-
up the interstices of coarse
aggregate, watering and
compacting to the required density
grading 1 as per Technical
Specification Clause 405.By
Manual Means
5 3345.00 Cum WBM Grading 2 735.82 Rupees One 2461317.90
Providing, laying, spreading and Seven Cum
compacting stone aggregates of 63 Hundred
to 45mm sizes to water bound Thirty Five
macadam specification including And Paise
spreading in uniform thickness, Eighty Two
hand packing, rolling with smooth Only
wheel roller 80-100 kN in stages to
proper grade and camber, applying
and brooming, stone
screening/binding materials to fill-
up the interstices of coarse
aggregate, watering and
compacting to the required density
grading 2 as per Technical
Specification Clause 405.By
Manual Means
Page 3

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
6 3574.00 Cum Granular Sub-base with well 603.36 Rupees Six One 2156408.64
Graded Black trap cruhsed agg. Hundred Cum
Material (Table.400.1) by Mix in Three And
place Method. Construction of Paise Thirty
Granular Sub-base by Providing Six Only
well greded material, spreading in
uniform layers with motor graded
on prepared surfce, mixing by mix
in place method with rotavator at
OMC, and compacting with
vibratory roller to achieve the
desired density, complete as per
Technical Specification Clause-
401. For Grading Materials-1
7 38087.60 Cum Rolling and Watering of earthwork 18.67 Rupees One 711095.49
in layers with vibratory roller Eighteen And Cum
including filling in depression Paise Sixty
which occur during the process as Seven Only
directed.
8 1552.00 MT Providing and laying bitumenous 1981.49 Rupees One One 3075272.48
grout 37.50mm thick using Thousand MT
Emulsion RS-1 for tack coat at the Nine
rate of 4.00kg/10sqm on W.B.M. Hundred
surface and using B.T. chips for Eighty One
required gradation with the asphalt And Paise
of grade VG-30 at the rate of Forty Nine
1.99% i.e 19.90kg/MT by weight Only
of mix including heating and
mixing in drum mix plant ,
transporting the mix and spreading
the same by paver finisher and
consolidation as per MOST
specification including cost of all
materials fuel, labours, tools and
plants etc. using contractor's own
drum mix plant etc. complete.
Page 4

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
9 1707.00 MT Providing, laying and rolling 2651.59 Rupees Two One 4526264.13
37.50mm thick compacted Thousand Six MT
bitumenous Macadam (B.M.) in Hundred
one layer with B.T. aggregates as Fifty One
specified and using Emulsion RS-1 And Paise
for tack coat at the rate of Fifty Nine
2.50kg/10sqm (As per IRC-16) and Only
using Bitumen Grade VG-30 for
mixing with agg. at the rate of
3.40% i.e 34.00kg/MT of total mix
including mixing in Drum mix
plant and spreading the same by
paver finisher and consolidation
with vibratory roller including
necessary including cost of hire
charges, firewood, oil, lubricants,
labour charges, etc. by using
constractor's own Drum mix plant,
machineries and equipment, tools
etc. complete in accordanace with
the requirement of sepcification.
10 952.00 MT Providing and laying and rolling of 3405.96 Rupees Three One 3242473.92
Compacted mix seal surface with Thousand MT
B.T. and aggregate as spedified Four
using Bitumen Grade VG-30 for Hundred Five
mixing with aggregate at the rate And Paise
of 5.10% i.e 51.00Kg/MT of total Ninety Six
mix including heating and Only
mixing in drum mix plant and
spreading the same by paver
finisher and consolidation with
vibratory roller including necessary
firewood, oil, lubricants, labour
charges using contractor's own
drum mix plant, machineries and
equipment, tools etc including
flushing of sand 0.30cum/10sqm
etc. complete in accordance with
the requirement of spefication.
Page 5

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
11 1681.00 Cum Excavation for foundation upto 161.19 Rupees One One 270960.39
1.5m depth including sorting out Hundred Cum
and stacking of useful materials Sixty One
and disposing of the excavated And Paise
stuff upto all lead. Dense or hard Nineteen
soil. Only
12 1274.00 Cum Excavation for foundation upto 274.66 Rupees Two One 349916.84
1.5m depth including sorting out Hundred Cum
and stacking of useful materials Seventy Four
and disposing of the excavated And Paise
stuff upto all lead. Hard Murrum Sixty Six
Only
13 2972.00 Cum Providing and casting in situ 2823.75 Rupees Two One 8392185.00
ordinary cement concrete M-150 Thousand Cum
mix and providing necessary pin Eight
headers including shuttering, Hundred
scafilding, laying vibrating, curing Twenty Three
and finishing complete Without V- And Paise
Grooves For all Hieght. Seventy Five
Only

14 800.00 Cum Providing and filling in foundation 2216.44 Rupees Two One 1773152.00
with ordinary cement concrete M- Thousand Cum
10/M-100 mix and providing Two Hundred
necessary vertical pin headers incl. Sixteen And
Formwork, vibrating, ramming and Paise Forty
curing complete. Four Only

15 655.80 Cum Providing and casting in situ 3905.82 Rupees Three One 2561436.75
Contolled cement concrete- M- Thousand Cum
200 for average 150 mm thick Nine
wearing coat laid as directed Hundred Five
incuding. tamping, vibrating, And Paise
finishing, curring and filling in Eighty Two
joints with bitumen complete. Only

16 409.00 Nos Providing and laying @weep hole 35.63 Rupees One 14572.67
in Abutment and returns by using Thirty Five No
A.C pipe of 100mm. Incl. fixing in And Paise
proper grade and jointing the Sixty Three
complete as per detailed Only
specification.
Page 6

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
17 22.360 MT Providing and laying in Position 71636.85 Rupees One 1601799.96
FE -500 TMT bar reinforcement Seventy One MT
including cutting, bending, Thousand Six
hooking and tying complete as per Hundred
detailed drawings for the following Thirty Six
(A) Piers (B) Abutments (C) And Paise
Returns (D) Walls etc. Eighty Five
Only
18 11.280 MT Providing and placing in position 71084.33 Rupees One 801831.24
FE-500 TMT bar reinforcement Seventy One MT
including cutting, bending, Thousand
hooking, and tying complete as per Eighty Four
detailed drawaing (A) Solid Slab/ And Paise
App. Slab / Wearing coat. Thirty Three
Only
19 1513.00 Cum Filling available excavated earth 88.85 Rupees One 134430.05
(excluding rock ) in trenches plinth Eighty Eight Cum
sides of foundation etc. in layers And Paise
not exceeding 20cm in depth Eighty Five
consolidating each deposited layer Only
by ramming and watering.
20 150.00 Rmt Supplying and fixing reinforced 2158.27 Rupees Two One 323740.50
concrete heavy duty non presure Thousand Rmt.
pipes with collars for culverts One Hundred
including setting and joinng for Fifty Eight
pipes in C.M. 1:2 watering and And Paise
laying (to level or slope) of I.S. Twenty
Class NP-3 of following internal Seven Only
diameter with all lead and lift. (i)
600mm Dia.
21 120.00 Rmt Supplying and fixing reinforced 5516.27 Rupees Five One 661952.40
concrete heavy duty non presure Thousand Rmt.
pipes with collars for culverts Five Hundred
including setting and joinng for Sixteen And
pipes in C.M. 1:2 watering and Paise Twenty
laying (to level or slope) of I.S. Seven Only
Class NP-3 of following internal
diameter with all lead and lift. (i)
900mm Dia.
Page 7

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
22 60.00 Cum Supplying and fixing reinforced 6267.86 Rupees Six One 376071.60
concrete heavy duty non presure Thousand Rmt.
pipes with collars for culverts Two Hundred
including setting and joinng for Sixty Seven
pipes in C.M. 1:2 watering and And Paise
laying (to level or slope) of I.S. Eighty Six
Class NP-3 of following internal Only
diameter with all lead and lift. (i)
1200mm Dia.
23 25.00 Cum Dismantling the existing structure 590.69 Rupees Five One 14767.25
including removing and stacking Hundred Cum
the dismantled materials as and Ninety And
where directed. RCC Work. Paise Sixty
Nine Only
24 22.00 Nos Providing and fixing Precast 321.63 Rupees Three One 7075.86
cement concrete Hectometer as per Hundred No
IRC type design incl. painting, Twenty One
lettering etc. fixing in C.C. 1:5:10. And Paise
Sixty Three
Only

25 240.00 Nos Providing and fixing Precast 218.46 Rupees Two One 52430.40
cement concrete Guard stone as Hundred No
per I.R.C. type design including Eighteen And
white washing etc. complete. Paise Forty
Fixing in C.C. Six Only
26 9.00 Nos Providing and fixing ordinary 594.94 Rupees Five One 5354.46
Kilometer stone of pre-cast C.C. Hundred No
1:2:4 including necessary Ninety Four
reinforcement as per I.R.C. type And Paise
design in C..C. 1:4:8 including Ninety Four
painting lettering etc. complete.For Only
ODR/VR
Page 8

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
27 17.00 Nos Cheveron board 8076.93 Rupees Eight One 137307.81
Providing and Fixing sign boards Thousand No
made out of 2mm aluminum sheet Seventy Six
: size 40*60 cms. rectangle as per And Paise
design of IRC-67-1977. Pretreated Ninety Three
with phospheting process and acid Only
etching : coated with one coat of
epoxy primer and two coats of best
quality epoxy paint: reflectorised
with retro reflective sheeting as per
latest M.O.S.T specification: 3.1
M. long (2 nos) stand post and
frame fabricated from suitable size
iron angle of 50*50*5mm painted
with best quality epoxy coatings in
black and white bends the details
of symbole or inscription /
numerals for each board shall be as
per the instruction of engineer in
charge the fixing at site shall be in
1:2:4 CC block of size 45*45*60
cms for each leg: including
excvation curing etc. comp.under
the supervision of engineer-in-
charge.(B) Engineer grade

28 274.00 Nos Providing and fixing Precast 118.77 Rupees One One 32542.98
cement concrete Indicator stone of Hundred No
approve stone as per I.R.C. type Eighteen And
design including white washing Paise Seventy
etc. complete Fixing in earth. Seven Only

29 2.00 Nos Supplying and fixing Junction 5472.18 Rupees Five One 10944.36
Boards of M.S. plates and angles Thousand No
as per I.R.C. design incl;. Fixing Four
in C.C. 1:4:8 with necessary Hundred
excavation painting, figuring, Seventy Two
lettering on boards etc. complete. And Paise
Eighteen
Only
Page 9

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
30 4.00 Nos Providing and fixing Village name 3943.44 Rupees Three One 15773.76
Boards as per standard I.R.C. type Thousand No
design of steel plate incl. painting, Nine
lettering etc. complete. fixing in Hundred
C.C. 1:4:8 block with necessary Forty Three
excavation etc. complete And Paise
Forty Four
Only

31 16.00 Nos Providing and fixing Road sign of 3511.09 Rupees Three One 56177.44
M.S. plate and angle iron incl. Thousand No
painting, lettering etc. complete. Five Hundred
fixing in C.C. 1:4:8 block with Eleven And
necessary excavation etc. complete Paise Nine
as per IRC type design (i) Only
Reflective Type.
32 4.00 Nos Providing and Fixing FLOOD 3222.91 Rupees Three One 12891.64
GAUGE POST confirming to IRC 67- Thousand No
2001 using engineering grade retro Two Hundred
reflective sheeting including lettering Twenty Two
and border as directed. For New
And Paise
structure.
Ninety One
Only
Page 10

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
33 8.00 Nos Regulatory/Mandatory signs 3645.59 Rupees Three One 29164.72
:Providing and fixing sing boards Thousand Six No
made out of 2mm aluminium sheet; Hundred
size 60cms. diameter circle as per Forty Five
the design of IRC-67-1977 pre treated
And Paise
with phospheting process & acid
Fifty Nine
eteching; coated with one coat of
epoxy primer and two coats of best
Only
quality epoxy paint; reflectorised with
retro refiective sheeting as per latest
M.O.S.T. Specifications; 3.1m long
stand post and frame fabricated from
suitable size iron angle of 35 x 35 x
3mm 75x75x6mm as required;
painted with best quality epoxy
coatings in black and white bends. the
details of symbol for each board shall
be as per the instruction of engineer in
charge. The fixing at site shall be in
1:2:4 CC block of size 45 x 45 x
60cms. for each leg. including
excavation curing etc. complete under
the supervision of engineer in
charge.(A) Engineer
Grade..............................
Page 11

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
34 2.00 Nos Citizen' s information Board- 8411.28 Rupees Eight One 16822.56
Providing and fixing of typical Thousand No
MMGSY information board as per Four
instruction. Two MS sheets of 3 mm Hundred
thick, of 900 mm x 750mm size fixed
Eleven And
at top & bottom duly rivetted with
Paise Twenty
MS angles of 25 x 25 x 5 mm thick
M.S angle shall be welded by two
Eight Only
vertical M.S angle of 5 mm thick to
75 mm x 75 mm of 12 SWG square
tubes posts duly embedded in cement
concrete M-15 grade blocks of
600mm x 600mm x 750mm, below
ground level. The letters & figure of
any shade reflectorised with High
Intensity Prismatic Grade Retro
Reflective Sheeting of Type-4 as per
ASTM D-4956 and latest MORD
specifications; All sections of framed
posts and steel tube will be painted
with primer and two coats of epoxy
paints as per drawing Clause 1701
and Annexure 1700.1 (10.16). (A)
Class-B High intensity Grade Retro
Reflective sheeting

35 8.00 Nos Cautionary Warning Sign : Providing and 4040.88 Rupees Four One 32327.04
fixing sign boards made out of 2mm Thousand No
Aluminium sheet size 90x90x90 cms.
Equilateral treangle as per the design of
Forty And
IRC-67-1977 pre treated with phospheting Paise Eighty
process and acid etching coated with one Eight Only
coat of apoxy primer and two coats of best
quality epoxy paint reflectorised with retro
reflective sheeting as per latest MOST
specification 3.1 Mt. long stand post and
frame fabricated from suitable size iron
angle of 35x35x3mm, 75x75x6mm. as
required painted with best quality epoxy
coating in black and white bends the
details of symbole for each board shall be
as per the instruction of Engineer in
charge the fixing at site shall be in 1:2:4
CC block of size 45x45x60cms. for each
leg including excavation curring etc.
complete under the supervision of
engineer in charge (A) Engineering Grade.
Page 12

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
36 8.00 Nos Village name/ Bump Ahed sign :- 5257.20 Rupees Five One 42057.60
Providing and fixing sing boards made out Thousand No
of 2mm aluminium sheet; size 90 x 60cms.
rectangle as as per the design of IRC-67-
Two Hundred
1977 pre treated with phospheting Fifty Seven
process & acid etching; coated with one And Paise
coat of epoxy primer and two coats of best Twenty Only
quality epoxy paint; reflectorised with
retro refiective sheeting as per latest
M.O.S.T. Specifications; Letters and
numerals should be as per IRC-30-1968,
3.1m long (2 nos) stand post and frame
fabricated from suitable size iron angle of
50 x 50 x 5mm painted with best quality
epoxy coatings in black and white bends.
the details of symbol or inscription /
numerals for each board shall be as per the
instruction of engineer in charge. The
fixing at site shall be in 1:2:4 CC block of
size 45 x 45 x 60cms. for each leg.
including excavation curing etc. complete
under the supervision of engineer in
charge.(A) Engineer Grade

37 2083.00 Sqm Road marking with hot applied paints with 299.36 Rupees Two One 623566.88
reflectorising glass beads on bitumin Hundred Sqm
surface providing and laying a hot applied
thermoplastic compound 2.5 mm thick
Ninety Nine
including reflectorising glass beads @ 250 And Paise
grm per sq mtr area, thickness of 2.5 mm Thirty Six
is excluding of surface applied glass beads Only
as per IRC : 35-2015. the finished surface
to be level, uniform and free from streaks
and holes, zebra patta/ bump patta-lane /
centerline/ edge line/ cut patta. the white
color marking should provide liminance
coefficient on cement road shall be min
130 mcd/m2/lux and asphalt road shall be
min 100 mcd/m2/lux during the survice
life during the date the marking should
meet the performance criteria for night
time reflectivity, wet reflectivity and skid
resistance as mentioned in the section-15
of IRC 35-2015.warranty for
retroreflectivity shall be two years.
Page 13

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
38 16.00 Nos Hazard Marker sign : 2555.35 Rupees Two One 40885.60
Providing and Fixing sign boards made Thousand No
out of 2mm aluminum sheet : size 90*30
cms. rectangle as per design / Drawing
Five Hundred
attached (IRC). Pretreated with Fifty Five
phospheting process and acid etching : And Paise
coated with one coat of epoxy primer and Thirty Five
two coats of best quality epoxy paint: Only
reflectorised with retro reflective sheeting
as per latest M.O.S.T specification: 3.1 M.
long (2 nos) stand post and frame
fabricated from suitable size iron angle of
35*35*3mm and 50*50*5mm : painted
with best quality epoxy coatings in black
and white bends the details of symbole or
inscription / numerals for each board shall
be as per the instruction of engineer in
charge the fixing at site shall be in 1:2:4
CC block of size 45*45*60 cms for each
leg: including excvation curing etc.
comp.under the supervision of engineer-in-
charge.
(B) Engineer grade
39 136.00 Nos Cat eye / road stud/RPM: Supplying 375.72 Rupees Three One 51097.92
Raised Pavment Markers made of Hundred No
polycarbonate and ABS moulded body
and reflective panels with micro prismatic
Seventy Five
lens (No Glass bead lens) capable of And Paise
providing total internal reflection of the Seventy Two
light entering the lens face and shall Only
support a load of 13635 kgs. tested in
accordance to ASTM D 4280 type H and
complying to specifications of category A
of MORTH circular No
RW/NH/33023/10-97-DO lll Dt
11.06.1997. the height,width and lenth
shall ot exeed 20 mm, 130mm and 130mm
and with minimum reflective area of 13
sqcm on each side and the slope to the
base shall be 35 +/- 5 degree. the body of
the marker should having finger grip for
easy and accurate placement and
application With epoxy /bituminous
Adhesive as recommended by the
manufacturer of the marker. The colour of
the marker should be as per the IRC 35-
2015 and as directed by engineer-in-
charge.
Rupees Four Crore Thirty Lakh(s) Twenty Four Thousand Five Hundred Thirty 43024533.26
Three And Paise Twenty Six Only

I/We am/are willing to carry out the work at .............................................% above/below


percent (should be written in figures and words) of the estimated rates mentioned above. Amount of
Page 14

Item Quanties Item of work Estimated Rates Unit Total amount


No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
percent (should be written in figures and words) of the estimated rates mentioned above. Amount of
my/our tender works out as under.
Estimated amount Estimated amount
Put to tender Rs……………………… Put to tender Rs………………………
Deduct .............% below Rs………… Add ............% above Rs……………
Net Rs………… Total Rs……………
In words ................................................ In words ................................................
(*Please strike out whichever is not applicable).

Signature of Contractor. Executive Engineer


Panchayat R&B Division
Amreli

Deputy Executive Engineer


Panchayat R&B Sub Division
Kunkavav

NOTE: Amount Rs.5625/- Of Dismentalled materials shall be recovered from 1st R.A. bill of Contractor at once.