1. The schedule for the submission and opening of proposals shall proceed as follows:
FROM TO
IX. DOCUMENTARY REQUIREMENTS IX. DOCUMENTARY REQUIREMENTS FOR THE
FOR THE BID OPENING BID OPENING
FROM TO
First Envelope: Eligibility Documents and First Envelope: Eligibility Documents and Technical
Technical Requirements Requirements
TAB 9 TAB 9
The complete Scope of Works and Technical The complete revised Scope of Works and
Specifications of EFF are also attached as Technical Specifications of EFF are also attached
FORM 7-A for reference. as REVISED FORM 7-A (attached in the
Negotiation Bulletin No. 1 dated 22 September
2023), for reference.
First Envelope: Eligibility Documents and First Envelope: Eligibility Documents and Technical
Technical Requirements Requirements
TAB 11 TAB 11
List of contractor’s personnel (Template per List of contractor’s personnel (Template per FORM
FORM 8) with complete qualification and 8) with complete qualification and experience data
experience data and must include the and must include the following to be assigned to the
following to be assigned to the project if project if awarded the contract, duly signed by the
awarded the contract, duly signed by the contractor’s authorized representative:
contractor’s authorized representative:
1. Project Coordinator
1. Project Coordinator 2. Safety Officer
2. Safety Officer 3. Quality Assurance/Quality Control (QA/QC)
3. Quality Assurance/Quality Control Officer
(QA/QC) Officer
All key personnel must have a minimum of one
All key personnel must have a minimum of (1) year relevant experience. Personnel may be
one (1) year relevant experience. designated as any of the two or three key
required position.
Second Envelope: Financial Proposal Second Envelope: Financial Proposal
TAB 2 TAB 2
Detailed Financial Bid/Bill of Quantities per Detailed Financial Bid/Bill of Quantities per
FORM 11, to be submitted in one (1) hard FORM 11, duly signed by the contractor’s
copy and one (1) soft copy (saved in a flash authorized representative.
drive).
The Bill of Quantities must have the same total
The Bill of Quantities must have the same per TAB 1 (financial bid) which shall not exceed
total per TAB 1 (financial bid) which shall the ABC of PhP 2,152,082.15.
not exceed the ABC of PhP 2,152,082.15.
1) Scanned copy (in PDF format) which • The editable Microsoft Excel file of the Bill of
must be signed in each page by the Quantities shall be provided to the
contractor’s authorized contractors upon request to the BAC
representative; AND Secretariat.
2) Microsoft Excel format which must be The contract shall be for the whole Works based
in the same format of the scanned on the priced Bill of Quantities submitted by the
copy. Contractor.
4. Contractors are reminded to use REVISED FORM 7-A for the Revised Scope of Works as
attached in this Negotiation Bulletin No. 1 dated 22 September 2023 and submit together with
ALL other required documents for the Submission and Opening of Eligibility, Technical, and
Financial Proposals.
6. The Eligibility, Technical, and Financial Proposals must be properly tabbed for easy
reference and must be submitted in sequence/order per Checklist of Requirements.
7. The BAC shall no longer entertain any question/request for clarification after the issuance of
this Negotiation Bulletin.
8. Please be advised that proposals submitted after the deadline shall only be marked for recording
purposes, shall not be included in the opening of proposals, and shall be returned to the contractors
unopened.
SIGNED
RONALDO U. TEPORA
Senior Vice President, and
Chairperson, DBP Bids and Awards Committee
TRANSMITTAL FORM
REVISED CHECKLIST OF REQUIREMENTS FOR CONTRACTORS
Note: Please fill-out this form and submit directly to the BAC Secretariat outside of the sealed envelopes.
FOR MACHINE STAMP (OFFICIAL TIME) BY THE DBP BAC SECRETARIAT
Received:
Name of Contractor:
Complete Address:
Submitted by:
Landline: Email:________________________________________
If bidding as a formed JV: Submit the existing valid, duly accomplished, signed and
notarized JV Agreement (JVA). The JVA must specifically indicate among others,
the following: the partner company that will represent the JV, the shareholdings of
each partner company in the JV (to determine which partner company and its
nationality has the controlling majority share), and the share of each partner
company in the JV.
TAB 1
Moreover, please likewise note:
a. Duly notarized Special Power of Attorney (if the contractor is a sole proprietorship)
(Template per FORM 1-A)
OR
TAB 2
b. Duly notarized Secretary’s Certificate (if the contractor is a corporation,
partnership or cooperative)
Following are the related provisions/requirements based on GPPB Resolution 15-2021 dated 14 October
2021 regarding submission of valid/current PhilGEPS Certificate of Registration (Platinum Membership):
- LIFT the suspension on the implementation of mandatory submission of the PhilGEPS Certificate
of Registration (Platinum Membership) in Competitive Bidding and Limited Source Bidding, thus,
fully enforcing Sections 8.5.2 and 54.6 of the 2016 revised IRR of RA No. 9184 starting 01 January
2022;
- AMEND Sections 23.1(a)(ii) and 24.1(a)(ii) of the 2016 revised IRR of RA No. 9184 to reflect that the
submission of the recently expired Mayor’s Permit together with the official receipt as proof that
the prospective contractor has applied for renewal within the period prescribed by the concerned
local government unit shall be accepted by the PhilGEPS for the purpose of updating the PhilGEPS
Certificate of Registration (Platinum Membership) in accordance with Section 8.5.2 of the 2016
revised IRR of RA 9184.
TECHNICAL ELIGIBILITY DOCUMENTS
Statement by the contractor of ALL its ongoing government and/or private contracts
(including those awarded but not yet started, if any), whether similar or not similar in
nature and complexity to the contract to be bid (include all contracts with the DBP for
the said period, if any (Template per FORM 2), duly signed by the contractor’s
TAB 4 authorized representative.
Note: For contractors who have no ongoing government and/or private contracts, kindly
indicate in the statementiwriteSi “NONE” to comply with the requirement. Contractors will
be rated as “failed” if no document is submitted or if the document submitted is
incomplete or patently insufficient (per GPPB NPM 094-2013 dtd. 2013-12-19).
NEGOTIATION BULLETIN NO. 1
REFERENCE NO. N-I-2023-03: CONSTRUCTION OF MEZZANINE AT THE ORMOC BRANCH OF THE DEVELOPMENT OF THE BANK PHILIPPINES
(ABC: PhP 2,152,082.15 inclusive of all applicable taxes)
page 24 of 27
FIRST ENVELOPE: ELIGIBILITY DOCUMENTS AND TECHNICAL
Item
REQUIREMENTS (DULY SEALED AND MARKED)
Statement of single completed contract of similar nature (government or private
contract) equivalent to at least fifty percent (50%) of the ABC (Template per FORM
3), duly signed by the contractor’s authorized representative.
AND
ii. Proof of satisfactory completion and acceptance for the Single Largest
Completed Contract (should reflect full amount of total contract price of
completed project) whichever is applicable:
TAB 6 1) The values of the contractor’s current assets and current liabilities shall be
based on the AFS for CY 2022;
2) The value of the NFCC must at least be equal to the ABC of this project.
TECHNICAL COMPONENT
Accomplished Omnibus Sworn Statement (with ten [10] statements) (Template per
TAB 7 FORM 5), duly signed by the contractor’s authorized representative and
notarized.
Accomplished Data Privacy Consent Form per FORM 6, duly signed by the
TAB 8
contractor’s authorized representative.
Organizational chart of the contractor for the contract to be bid, duly signed by the
TAB 10
contractor’s authorized representative.
List of contractor’s personnel (Template per FORM 8) with complete qualification and
experience data and must include the following to be assigned to the project if
awarded the contract, duly signed by the contractor’s authorized representative:
1. Project Coordinator
TAB 11 2. Safety Officer
3. Quality Assurance/Quality Control (QA/QC) Officer
All key personnel must have a minimum of one (1) year relevant experience.
Personnel may be designated as any of the two or three key required position.
List of contractor’s major equipment units (Template per FORM 9), pledged for the
contract to be bid which are owned, leased, and/or under purchase agreements which
must include, but not limited to, the following, duly signed by the contractor’s
authorized representative:
Detailed Financial Bid/Bill of Quantities per FORM 11, duly signed by the
contractor’s authorized representative.
The Bill of Quantities must have the same total per TAB 1 (financial bid) which shall
not exceed the ABC of PhP 2,152,082.15.
Additional Notes:
• The soft copy (in Microsoft Excel format) of the Bill of Quantities shall only
be submitted during the Post-Evaluation by the contractor who will be
declared as the Lowest/Single Calculated Proposal.
• The editable Microsoft Excel file of the Bill of Quantities shall be provided to
the contractors upon request to the BAC Secretariat.
The contract shall be for the whole Works based on the priced Bill of Quantities submitted
by the Contractor.
All duties, taxes, and other levies payable by the Contractor under the Contract, or for any
other cause, prior to the deadline for submission of bids, shall be included in the rates,
prices, and total bid price submitted by the Contractor.