You are on page 1of 4

OWNER

SOLAIRE DIRECT INDIA/ENGIE SOLAR INDIA


Pentagon P3, Magarpatta City,
Hadapsar, Pune,
Maharashtra ‐ 411013, India

OWNER's ENGINEER
TRACTEBEL ENGINEERING PVT. LTD.
Intec House, 37
Institutional Area, Sector 44
Gurgaon ‐ 122002, India

EPC CONTRACTOR
MAHINDRA SUSTEN PVT. LTD.
6th Floor, AFL House, Lok Bharati Complex,
Marol Maroshi Road, Andheri East,
Mumbai ‐ 400 059, India

250 MW SOLAR POWER PLANT AT KADAPA,


PROJECT NAME
ANDHRA PRADESH, INDIA

TITLE MV Power Cable Schedule

DOCUMENT NUMBER IN‐MSP1‐EN‐EL‐CAR‐0001

REVISION HISTORY
VERSION DATE REMARK
A 15‐11‐2018 FOR APPROVAL

TRACTEBEL ENGINEERING PVT. LTD.


CONSULTING ENGINEERS,GURGAON, INDIA

APPROVAL STATUS:

A1 - APPROVED
A2 - APPROVED WITH COMMENTS
A3 - NOT APPROVED
I - RECEIVED FOR INFORMATION/REFERENCE
THIS APPROVAL STATUS SHALL NOT RELEIVE THE CONTRACTOR FROM HIS CONTRACTUAL
OBLIGATIONS.

DEPARTMENT:
RENEWABLE
DATE:
28.01.2019
HT CABLE SCHEDULE
FROM TO FINAL
R Total Power FULL LOAD Power loss
SR. NO. CLUSTER LEVEL CABLE DESCRIPTION CABLE TAG NO. OF RUN LENGTH % Power loss
LOCATION EQUIPMENT LOCATION EQUIPMENT AT 90DEG C (WATT) CURRENT (watt)
(MTR.)
A CABLES FROM TRAFO. TO 3MV PANEL/ICOG:
1 19/33 kV XLPE Armoured 3C X 240 Al TS‐1 TRAFO‐1 TS‐1 3MVP‐1 HT‐1 1 51 0.164 5040000 88 194 0.0039%
2 19/33 kV XLPE Armoured 3C X 240 Al TS‐2 ICOG‐1 TS‐1 3MVP‐1 HT‐2 1 280 0.164 5040000 88 1072 0.0213%
3 19/33 kV XLPE Armoured 3C X 240 Al TS‐2 TRAFO‐2 TS‐2 ICOG‐1 HT‐3 1 51 0.164 5040000 88 194 0.0039%
4 19/33 kV XLPE Armoured 3C X 240 Al TS‐3 TRAFO‐3 TS‐3 3MVP‐2 HT‐4 1 51 0.164 5040000 88 194 0.0039%
5 19/33 kV XLPE Armoured 3C X 240 Al TS‐4 ICOG‐2 TS‐3 3MVP‐2 HT‐5 1 352 0.164 5040000 88 1345 0.0267%
6 19/33 kV XLPE Armoured 3C X 240 Al TS‐4 TRAFO‐4 TS‐4 ICOG‐2 HT‐6 1 51 0.164 5040000 88 194 0.0039%
7 19/33 kV XLPE Armoured 3C X 240 Al TS‐5 TRAFO‐5 TS‐5 3MVP‐3 HT‐7 1 51 0.164 5040000 88 194 0.0039%
50MW CLUSTER‐1
8 19/33 kV XLPE Armoured 3C X 240 Al TS‐6 ICOG‐3 TS‐5 3MVP‐3 HT‐8 1 331 0.164 5040000 88 1267 0.0251%
9 19/33 kV XLPE Armoured 3C X 240 Al TS‐6 TRAFO‐6 TS‐6 ICOG‐3 HT‐9 1 51 0.164 5040000 88 194 0.0039%
10 19/33 kV XLPE Armoured 3C X 240 Al TS‐7 TRAFO‐7 TS‐7 3MVP‐4 HT‐10 1 51 0.164 5040000 88 194 0.0039%
11 19/33 kV XLPE Armoured 3C X 240 Al TS‐8 ICOG‐4 TS‐7 3MVP‐4 HT‐11 1 331 0.164 5040000 88 1267 0.0251%
12 19/33 kV XLPE Armoured 3C X 240 Al TS‐8 TRAFO‐8 TS‐8 ICOG‐4 HT‐12 1 51 0.164 5040000 88 194 0.0039%
13 19/33 kV XLPE Armoured 3C X 240 Al TS‐9 TRAFO‐9 TS‐9 ICOG‐5 HT‐13 1 51 0.164 5040000 88 194 0.0039%
14 19/33 kV XLPE Armoured 3C X 240 Al TS‐10 TRAFO‐10 TS‐10 ICOG‐6 HT‐14 1 51 0.164 5040000 88 194 0.0039%
15 19/33 kV XLPE Armoured 3C X 240 Al TS‐11 TRAFO‐11 TS‐11 3MVP‐5 HT‐15 1 51 0.164 5040000 88 194 0.0039%
16 19/33 kV XLPE Armoured 3C X 240 Al TS‐12 ICOG‐5 TS‐11 3MVP‐5 HT‐16 1 260 0.164 5040000 88 994 0.0197%
17 19/33 kV XLPE Armoured 3C X 240 Al TS‐12 TRAFO‐12 TS‐12 ICOG‐7 HT‐17 1 51 0.164 5040000 88 194 0.0039%
18 19/33 kV XLPE Armoured 3C X 240 Al TS‐13 TRAFO‐13 TS‐13 3MVP‐6 HT‐18 1 51 0.164 5040000 88 194 0.0039%
19 19/33 kV XLPE Armoured 3C X 240 Al TS‐14 ICOG‐6 TS‐13 3MVP‐6 HT‐19 1 454 0.164 5040000 88 1736 0.0344%
20 19/33 kV XLPE Armoured 3C X 240 Al TS‐14 TRAFO‐14 TS‐14 ICOG‐8 HT‐20 1 51 0.164 5040000 88 194 0.0039%
21 19/33 kV XLPE Armoured 3C X 240 Al TS‐15 TRAFO‐15 TS‐15 3MVP‐7 HT‐21 1 51 0.164 5040000 88 194 0.0039%
50MW CLUSTER‐2
22 19/33 kV XLPE Armoured 3C X 240 Al TS‐16 ICOG‐7 TS‐15 3MVP‐7 HT‐22 1 474 0.164 5040000 88 1814 0.0360%
23 19/33 kV XLPE Armoured 3C X 240 Al TS‐16 TRAFO‐16 TS‐16 ICOG‐9 HT‐23 1 51 0.164 5040000 88 194 0.0039%
24 19/33 kV XLPE Armoured 3C X 240 Al TS‐17 TRAFO‐17 TS‐17 3MVP‐8 HT‐24 1 51 0.164 5040000 88 194 0.0039%
25 19/33 kV XLPE Armoured 3C X 240 Al TS‐18 ICOG‐8 TS‐17 3MVP‐8 HT‐25 1 199 0.164 5040000 88 760 0.0151%
26 19/33 kV XLPE Armoured 3C X 240 Al TS‐18 TRAFO‐18 TS‐18 ICOG‐10 HT‐26 1 51 0.164 5040000 88 194 0.0039%
27 19/33 kV XLPE Armoured 3C X 240 Al TS‐19 TRAFO‐19 TS‐19 ICOG‐11 HT‐27 1 51 0.164 5040000 88 194 0.0039%
28 19/33 kV XLPE Armoured 3C X 240 Al TS‐20 TRAFO‐20 TS‐20 ICOG‐12 HT‐28 1 51 0.164 5040000 88 194 0.0039%
29 19/33 kV XLPE Armoured 3C X 240 Al TS‐21 TRAFO‐21 TS‐21 3MVP‐9 HT‐29 1 51 0.164 5040000 88 194 0.0039%
30 19/33 kV XLPE Armoured 3C X 240 Al TS‐22 ICOG‐9 TS‐21 3MVP‐9 HT‐30 1 872 0.164 5040000 88 3336 0.0662%
31 19/33 kV XLPE Armoured 3C X 240 Al TS‐22 TRAFO‐22 TS‐22 ICOG‐13 HT‐31 1 51 0.164 5040000 88 194 0.0039%
32 19/33 kV XLPE Armoured 3C X 240 Al TS‐23 TRAFO‐23 TS‐23 3MVP‐10 HT‐32 1 51 0.164 5040000 88 194 0.0039%
33 19/33 kV XLPE Armoured 3C X 240 Al TS‐24 ICOG‐10 TS‐23 3MVP‐10 HT‐33 1 433 0.164 5040000 88 1658 0.0329%
34 19/33 kV XLPE Armoured 3C X 240 Al TS‐24 TRAFO‐24 TS‐24 ICOG‐14 HT‐34 1 51 0.164 5040000 88 194 0.0039%
35 19/33 kV XLPE Armoured 3C X 240 Al TS‐25 TRAFO‐25 TS‐25 3MVP‐11 HT‐35 1 51 0.164 5040000 88 194 0.0039%
50MW CLUSTER‐3
36 19/33 kV XLPE Armoured 3C X 240 Al TS‐26 ICOG‐11 TS‐25 3MVP‐11 HT‐36 1 454 0.164 5040000 88 1736 0.0344%
37 19/33 kV XLPE Armoured 3C X 240 Al TS‐26 TRAFO‐26 TS‐26 ICOG‐15 HT‐37 1 51 0.164 5040000 88 194 0.0039%
38 19/33 kV XLPE Armoured 3C X 240 Al TS‐27 TRAFO‐27 TS‐27 3MVP‐12 HT‐38 1 51 0.164 5040000 88 194 0.0039%
39 19/33 kV XLPE Armoured 3C X 240 Al TS‐28 ICOG‐12 TS‐27 3MVP‐12 HT‐39 1 372 0.164 5040000 88 1424 0.0282%
40 19/33 kV XLPE Armoured 3C X 240 Al TS‐28 TRAFO‐28 TS‐28 ICOG‐16 HT‐40 1 51 0.164 5040000 88 194 0.0039%
41 19/33 kV XLPE Armoured 3C X 240 Al TS‐29 TRAFO‐29 TS‐29 ICOG‐17 HT‐41 1 51 0.164 5040000 88 194 0.0039%
42 19/33 kV XLPE Armoured 3C X 240 Al TS‐30 TRAFO‐30 TS‐30 ICOG‐18 HT‐42 1 51 0.164 5040000 88 194 0.0039%
43 19/33 kV XLPE Armoured 3C X 240 Al TS‐31 TRAFO‐31 TS‐31 3MVP‐13 HT‐43 1 51 0.164 5040000 88 194 0.0039%
44 19/33 kV XLPE Armoured 3C X 240 Al TS‐32 ICOG‐13 TS‐31 3MVP‐13 HT‐44 1 311 0.164 5040000 88 1189 0.0236%
45 19/33 kV XLPE Armoured 3C X 240 Al TS‐32 TRAFO‐32 TS‐32 ICOG‐19 HT‐45 1 51 0.164 5040000 88 194 0.0039%
46 19/33 kV XLPE Armoured 3C X 240 Al TS‐33 TRAFO‐33 TS‐33 3MVP‐14 HT‐46 1 51 0.164 5040000 88 194 0.0039%
47 19/33 kV XLPE Armoured 3C X 240 Al TS‐34 ICOG‐14 TS‐33 3MVP‐14 HT‐47 1 352 0.164 5040000 88 1345 0.0267%
48 19/33 kV XLPE Armoured 3C X 240 Al TS‐34 TRAFO‐34 TS‐34 ICOG‐20 HT‐48 1 51 0.164 5040000 88 194 0.0039%
49 19/33 kV XLPE Armoured 3C X 240 Al TS‐35 TRAFO‐35 TS‐35 3MVP‐15 HT‐49 1 51 0.164 5040000 88 194 0.0039%
50MW CLUSTER‐4
50 19/33 kV XLPE Armoured 3C X 240 Al TS‐36 ICOG‐15 TS‐35 3MVP‐15 HT‐50 1 637 0.164 5040000 88 2438 0.0484%
51 19/33 kV XLPE Armoured 3C X 240 Al TS‐36 TRAFO‐36 TS‐36 ICOG‐21 HT‐51 1 51 0.164 5040000 88 194 0.0039%
52 19/33 kV XLPE Armoured 3C X 240 Al TS‐37 TRAFO‐37 TS‐37 3MVP‐16 HT‐52 1 51 0.164 5040000 88 194 0.0039%
53 19/33 kV XLPE Armoured 3C X 240 Al TS‐38 ICOG‐16 TS‐37 3MVP‐16 HT‐53 1 627 0.164 5040000 88 2399 0.0476%
54 19/33 kV XLPE Armoured 3C X 240 Al TS‐38 TRAFO‐38 TS‐38 ICOG‐22 HT‐54 1 51 0.164 5040000 88 194 0.0039%
55 19/33 kV XLPE Armoured 3C X 240 Al TS‐39 TRAFO‐39 TS‐39 ICOG‐23 HT‐55 1 51 0.164 5040000 88 194 0.0039%
56 19/33 kV XLPE Armoured 3C X 240 Al TS‐40 TRAFO‐40 TS‐40 ICOG‐24 HT‐56 1 51 0.164 5040000 88 194 0.0039%
57 19/33 kV XLPE Armoured 3C X 240 Al TS‐41 TRAFO‐41 TS‐41 3MVP‐17 HT‐57 1 51 0.164 5040000 88 194 0.0039%
58 19/33 kV XLPE Armoured 3C X 240 Al TS‐42 ICOG‐17 TS‐41 3MVP‐17 HT‐58 1 556 0.164 5040000 88 2126 0.0422%
59 19/33 kV XLPE Armoured 3C X 240 Al TS‐42 TRAFO‐42 TS‐42 ICOG‐25 HT‐59 1 51 0.164 5040000 88 194 0.0039%
60 19/33 kV XLPE Armoured 3C X 240 Al TS‐43 TRAFO‐43 TS‐43 3MVP‐18 HT‐60 1 51 0.164 5040000 88 194 0.0039%
61 19/33 kV XLPE Armoured 3C X 240 Al TS‐44 ICOG‐18 TS‐43 3MVP‐18 HT‐61 1 413 0.164 5040000 88 1580 0.0313%
62 19/33 kV XLPE Armoured 3C X 240 Al TS‐44 TRAFO‐44 TS‐44 ICOG‐26 HT‐62 1 51 0.164 5040000 88 194 0.0039%
63 19/33 kV XLPE Armoured 3C X 240 Al TS‐45 TRAFO‐45 TS‐45 3MVP‐19 HT‐63 1 51 0.164 5040000 88 194 0.0039%
50MW CLUSTER‐5
64 19/33 kV XLPE Armoured 3C X 240 Al TS‐46 ICOG‐19 TS‐45 3MVP‐19 HT‐64 1 546 0.164 5040000 88 2087 0.0414%
65 19/33 kV XLPE Armoured 3C X 240 Al TS‐46 TRAFO‐46 TS‐46 ICOG‐27 HT‐65 1 51 0.164 5040000 88 194 0.0039%
66 19/33 kV XLPE Armoured 3C X 240 Al TS‐47 TRAFO‐47 TS‐47 3MVP‐20 HT‐66 1 51 0.164 5040000 88 194 0.0039%
67 19/33 kV XLPE Armoured 3C X 240 Al TS‐48 ICOG‐20 TS‐47 3MVP‐20 HT‐67 1 362 0.164 5040000 88 1384 0.0275%
68 19/33 kV XLPE Armoured 3C X 240 Al TS‐48 TRAFO‐48 TS‐48 ICOG‐28 HT‐68 1 51 0.164 5040000 88 194 0.0039%
69 19/33 kV XLPE Armoured 3C X 240 Al TS‐49 TRAFO‐49 TS‐49 ICOG‐29 HT‐69 1 51 0.164 5040000 88 194 0.0039%
70 19/33 kV XLPE Armoured 3C X 240 Al TS‐50 TRAFO‐50 TS‐50 ICOG‐30 HT‐70 1 51 0.164 5040000 88 194 0.0039%
B CABLES FROM 3MV PANEL/ICOG TO MAIN MV PANEL(CCR):
71 19/33 kV XLPE Armoured 3C X 240 Al TS‐1 3MVP‐1 CCR‐1 MMVP‐1 HT‐71 1 2708 0.164 10080000 176 41438 0.4111%
72 19/33 kV XLPE Armoured 3C X 240 Al TS‐3 3MVP‐2 CCR‐1 MMVP‐1 HT‐72 1 2453 0.164 10080000 176 37536 0.3724%
73 19/33 kV XLPE Armoured 3C X 240 Al TS‐5 3MVP‐3 CCR‐1 MMVP‐1 HT‐73 1 2127 0.164 10080000 176 32541 0.3228%
50MW CLUSTER‐1
74 19/33 kV XLPE Armoured 3C X 240 Al TS‐7 3MVP‐4 CCR‐1 MMVP‐1 HT‐74 1 2565 0.164 10080000 176 39252 0.3894%
75 19/33 kV XLPE Armoured 3C X 240 Al TS‐9 ICOG‐5 CCR‐1 MMVP‐1 HT‐75 1 2290 0.164 5040000 88 8760 0.1738%
76 19/33 kV XLPE Armoured 3C X 240 Al TS‐10 ICOG‐6 CCR‐1 MMVP‐1 HT‐76 1 1800 0.164 5040000 88 6887 0.1366%
77 19/33 kV XLPE Armoured 3C X 240 Al TS‐11 3MVP‐5 CCR‐2 MMVP‐2 HT‐77 1 1504 0.164 10080000 176 23020 0.2284%
78 19/33 kV XLPE Armoured 3C X 240 Al TS‐13 3MVP‐6 CCR‐2 MMVP‐2 HT‐78 1 1341 0.164 10080000 176 20522 0.2036%
79 19/33 kV XLPE Armoured 3C X 240 Al TS‐15 3MVP‐7 CCR‐2 MMVP‐2 HT‐79 1 505 0.164 10080000 176 7723 0.0766%
50MW CLUSTER‐2
80 19/33 kV XLPE Armoured 3C X 240 Al TS‐17 3MVP‐8 CCR‐2 MMVP‐2 HT‐80 1 178 0.164 10080000 176 2728 0.0271%
81 19/33 kV XLPE Armoured 3C X 240 Al TS‐19 ICOG‐11 CCR‐2 MMVP‐2 HT‐81 1 240 0.164 5040000 88 916 0.0182%
82 19/33 kV XLPE Armoured 3C X 240 Al TS‐20 ICOG‐12 CCR‐2 MMVP‐2 HT‐82 1 413 0.164 5040000 88 1580 0.0313%
83 19/33 kV XLPE Armoured 3C X 240 Al TS‐21 3MVP‐9 CCR‐3 MMVP‐3 HT‐83 1 2871 0.164 10080000 176 43935 0.4359%
84 19/33 kV XLPE Armoured 3C X 240 Al TS‐23 3MVP‐10 CCR‐3 MMVP‐3 HT‐84 1 2994 0.164 10080000 176 45808 0.4544%
85 19/33 kV XLPE Armoured 3C X 240 Al TS‐25 3MVP‐11 CCR‐3 MMVP‐3 HT‐85 1 2116 0.164 10080000 176 32385 0.3213%
50MW CLUSTER‐3
86 19/33 kV XLPE Armoured 3C X 240 Al TS‐27 3MVP‐12 CCR‐3 MMVP‐3 HT‐86 1 2473 0.164 10080000 176 37848 0.3755%
87 19/33 kV XLPE Armoured 3C X 240 Al TS‐29 ICOG‐17 CCR‐3 MMVP‐3 HT‐87 1 2208 0.164 5040000 88 8447 0.1676%
88 19/33 kV XLPE Armoured 3C X 240 Al TS‐30 ICOG‐18 CCR‐3 MMVP‐3 HT‐88 1 1943 0.164 5040000 88 7433 0.1475%
89 19/33 kV XLPE Armoured 3C X 240 Al TS‐31 3MVP‐13 CCR‐4 MMVP‐4 HT‐89 1 658 0.164 10080000 176 10064 0.0998%
90 19/33 kV XLPE Armoured 3C X 240 Al TS‐33 3MVP‐14 CCR‐4 MMVP‐4 HT‐90 1 933 0.164 10080000 176 14279 0.1417%
91 19/33 kV XLPE Armoured 3C X 240 Al TS‐35 3MVP‐15 CCR‐4 MMVP‐4 HT‐91 1 1198 0.164 10080000 176 18337 0.1819%
50MW CLUSTER‐4
92 19/33 kV XLPE Armoured 3C X 240 Al TS‐37 3MVP‐16 CCR‐4 MMVP‐4 HT‐92 1 699 0.164 10080000 176 10689 0.1060%
93 19/33 kV XLPE Armoured 3C X 240 Al TS‐39 ICOG‐23 CCR‐4 MMVP‐4 HT‐93 1 1219 0.164 5040000 88 4662 0.0925%
94 19/33 kV XLPE Armoured 3C X 240 Al TS‐40 ICOG‐24 CCR‐4 MMVP‐4 HT‐94 1 1545 0.164 5040000 88 5911 0.1173%
95 19/33 kV XLPE Armoured 3C X 240 Al TS‐41 3MVP‐17 CCR‐5 MMVP‐5 HT‐95 1 1402 0.164 10080000 176 21459 0.2129%
96 19/33 kV XLPE Armoured 3C X 240 Al TS‐43 3MVP‐18 CCR‐5 MMVP‐5 HT‐96 1 1923 0.164 10080000 176 29419 0.2919%
97 19/33 kV XLPE Armoured 3C X 240 Al TS‐45 3MVP‐19 CCR‐5 MMVP‐5 HT‐97 1 2280 0.164 10080000 176 34882 0.3461%
50MW CLUSTER‐5
98 19/33 kV XLPE Armoured 3C X 240 Al TS‐47 3MVP‐20 CCR‐5 MMVP‐5 HT‐98 1 2555 0.164 10080000 176 39096 0.3879%
99 19/33 kV XLPE Armoured 3C X 240 Al TS‐49 ICOG‐29 CCR‐5 MMVP‐5 HT‐99 1 2800 0.164 5040000 88 10711 0.2125%
100 19/33 kV XLPE Armoured 3C X 240 Al TS‐50 ICOG‐30 CCR‐5 MMVP‐5 HT‐100 1 3085 0.164 5040000 88 11803 0.2342%
C CABLES FROM MAIN MV PANEL(CCR) TO AUX. TRAFO(CCR):
101 50MW CLUSTER‐2 19/33 kV XLPE Armoured 3C X 240 Al CCR‐2 MMVP‐2 PSS MMVP HT‐101 1 107 0.164 63000 1 0.021 0.00003%
102 50MW CLUSTER‐4 19/33 kV XLPE Armoured 3C X 240 Al CCR‐4 MMVP‐4 PSS MMVP HT‐102 1 107 0.164 63000 1 0.021 0.00003%
D CABLES FROM MAIN MV PANEL(CCR) TO MV PANEL AT PSS(POOLING SUBSTATION):
103 50MW CLUSTER‐1 19/33 kV XLPE Armoured 3C X 300 Al CCR‐1 MMVP‐1 PSS MMVP HT‐103 3 321 0.131 25200000 441 8167 0.0324%
104 50MW CLUSTER‐1 19/33 kV XLPE Armoured 3C X 300 Al CCR‐1 MMVP‐1 PSS MMVP HT‐104 3 321 0.131 25200000 441 8167 0.0324%
105 50MW CLUSTER‐2 19/33 kV XLPE Armoured 3C X 300 Al CCR‐2 MMVP‐2 PSS MMVP HT‐105 3 321 0.131 25200000 441 8167 0.0324%
106 50MW CLUSTER‐2 19/33 kV XLPE Armoured 3C X 300 Al CCR‐2 MMVP‐2 PSS MMVP HT‐106 3 321 0.131 25200000 441 8167 0.0324%
107 50MW CLUSTER‐3 19/33 kV XLPE Armoured 3C X 300 Al CCR‐3 MMVP‐3 PSS MMVP HT‐107 3 321 0.131 25200000 441 8167 0.0324%
108 50MW CLUSTER‐3 19/33 kV XLPE Armoured 3C X 300 Al CCR‐3 MMVP‐3 PSS MMVP HT‐108 3 321 0.131 25200000 441 8167 0.0324%
109 50MW CLUSTER‐4 19/33 kV XLPE Armoured 3C X 300 Al CCR‐4 MMVP‐4 PSS MMVP HT‐109 3 321 0.131 25200000 441 8167 0.0324%
110 50MW CLUSTER‐4 19/33 kV XLPE Armoured 3C X 300 Al CCR‐4 MMVP‐4 PSS MMVP HT‐110 3 321 0.131 25200000 441 8167 0.0324%

111 50MW CLUSTER‐5 19/33 kV XLPE Armoured 3C X 300 Al CCR‐5 MMVP‐5 PSS MMVP HT‐111 3 321 0.131 25200000 441 8167 0.0324%

112 50MW CLUSTER‐5 19/33 kV XLPE Armoured 3C X 300 Al CCR‐5 MMVP‐5 PSS MMVP HT‐112 3 321 0.131 25200000 441 8167 0.0324%