You are on page 1of 17

Method Key Points Bottom Line

Robust methodology for improving existing


DMAIC processes, focuses on preventing defects Core Methodology
Major Effort/ SOAR
Robust methodology for designing new processes/ Initiative, Complement
DfSS products/ services or redesigning entitled processes DMAIC

Robust methodology for improving existing Major Effort/ SOAR


processes through elimination of waste and Initiative, Complement
Lean bottlenecks, focuses on product/ service value stream DMAIC
Compact Methodology for improving existing
processes, focuses on improvement of small, Resolving a quick find, en
TOCI previously-identified "quick hits" lieu of DMAIC
Compact methodology for improving existing Eliminating special cause,
processes, focuses on containing problems and Within DMAIC Measure/
8-D eliminating special cause Analyze or Stand-alone
Kepner-
Tregoe Compact methodology for improving existing Eliminating special cause,
Problem processes, focuses on determining why an variance Within DMAIC Measure/
Analysis from the expected result is observed Analyze or Stand-alone
Other Theory of Constraints, TRIZ (Inventive Problem
Methods to Solving), KT Situational Appraisal, KT Decision
consider Analysis, KT Potential Problem Analysis Varies
Six Sigma - DMAIC Six Sigma - DfSS LEAN
PHASE Activities Tools Activities Tools Activities Tools
Project Initiation (Define Strategic
Objectives); Develop Project Scope (ID
Deliverables, Clarify Financial Benefits); Identify Customer,
Identify Customer, Stakeholder and
Interview, Survey, QFD, Kano Analysis, Project Planning/Management (ID Stakeholder and Process Interview, Survey, QFD, Kano Analysis,
DEFINE

Process Owner Requirements; Project Roadmap, Thought


Process Maps, CTQ Flow Diagram, Resources, Complete Project Charter, Owner Requirements; CTQ Flow Diagram, SIPOC, Process
Problem Statement, CTQ, Big “Y” Process Map, Charter, Multi-
SIPOC, Team Charter, Customer Needs Timeline); Identify the Customers (Target Problem Statement, CTQ, Maps, Team Charter, Customer Needs
Musts, Wants, Constraints, Scope, generation Plan
Matrix, Affinity Diagram, Data Mining Segments, Internal vs. External, Big “Y” Musts, Wants, Matrix, Affinity Diagram, Data Mining
Timing
Stakeholder Analysis, Customer Constraints, Scope, Timing
Prioritization); Cross Functional Team
Formed
MEASURE / IDENTIFY

Identify what is important to the customer;


Translate Customer Requirements to
Define Performance Standard
Z-Tables, Pareto, SPC Charts, Normality Critical to Quality Parameters; Prioritize Customer Research, Quality Value Stream Maps, Lean Assessment,
“Baseline”; Baseline DPMO, Sigma, Define Current Performance
Tests, Process Maps, RTY, FMEA, MSA, Critical to Quality Parameters and Function Deployment, FMEA, Lean Metrics, Visual Management,
COPQ Opportunity, KPOV "Baseline"; Define Current
Hypothesis Tests, Time Series Plots, Establish Acceptable Range; Perform Opportunity Analysis, Control Charts, Check Sheets, MSA; Takt
Identification; Validate Measurement State; Validate Performance
Checksheets, Minitab (Quality Tools), Competitive Assessment; Determine Benchmarking, Kano Models, Time, Cycle Time, Throughput Time,
System (POVs); Determine Product Objectives
Sample Size, Normality Tests Measurement Protocols, Needs, etc…; Attribute Charts Benchmarking
Capability
Identify Noise Variables at the Customer;
Develop a product use profile
ANALYZE / CHARACTERIZE

Benchmarking, Hypothesis Tests,


Formulate Concept Design; Identify
Entitlement Analysis, Literature Review,
Potential Risks; For Each Technical Pugh Selection Matrix, Risk
FMEA, Hypothesis Tests, C&E Diagram,
Requirement, Identify Design Parameters Assessment, FMEA, DOE, 8 Wastes, Process Maps, FMEA, Video
Define Performance Objective; Regression, PMAP, Multivariate Study, Identify Sources of Waste &
(CTQ’s); Determine Relationships Conjoint Analysis, Benchmarking, Process Maps, Spreadsheet Tools,
Identify Variation Sources; Screen SPC Charts, Sample Size, ANOVA, Assess Process Stability /
Between CTQ’s and Part/Process House of Quality Matrix II, DfSS Spaghetti Diagrams, Floor Layout, SPC,
Potential Causes Concentration Diag., Normality Tests, Capability
Parameters (development of transfer Scorecard, Response Surface Breakdown Analysis, Pareto Charts
COV, Screening, Conjoint Analysis,
functions); Establish Environmental Methodologies
ANOVA, Full & Fractional Factorial
Constraints
DOE, Blocking, Multi-Vari Charts

5S, Kaizen Events, Kanban, Total


IMPROVE / OPTIMIZE

Productive Maintenance, Autonomous


Determine Process Capability, Flow-Up Attack and Eliminate Waste,
Maintenance, Defect Prevention, Mistake
Process Capability to Customer Create Process Stability &
Proofing, Andons, Jidoka, Line Balancing,
Optimization Designs, Response Surface Requirements and Identify Gaps, Optimize Capability Studies, FMEA, Capability, Create Product /
Discover Variable Relationships, TOC/ Bottleneck Analysis, GTA, SMED,
Methods, Conjoint Analysis, X-factor Design to Minimize CTQ Sensitivity, Components of Variation, DfSS Service Flow, Allow
Establish Operating Tolerances , Flexible / Mixed-Model Production, DOE,
Tolerancing, XY Relationship, MSA, Allocate and Set Tolerances, Determine Scorecard, Conjoint Analysis, Customer Pull of Product /
Validate Measurement System (PIVs) Cellular Design Cocepts, Point of Use
Hypothesis Test Potential Process Risks, Estimate Defect Multi-Response Optimization Service, Establish Standard
Storage, ABC Analysis, Heijunka, Work
and Failure Rates, Develop Process Control Work, Establish Performance
Balancing, Man-Machine Charts, Standard
Plan Standards & Scheduling
Time Analysis, Capacity Planning,
Scheduling

Control Plans, SOPs, Reaction Plans, SPC


CONTROL / VALIDATE

Confirm the Business Model; Test and


Implementation, FMEA, Mistake-
Validate Predictions; Set Process
Proofing, Training (New Employee
Standards and Specifications; Conform SPC Implementation, FMEA, Mistake
Training), Document Control System, DfSS Scorecard, Statistical
Implement Controls, Determine Process Capability; Implement Quality and Implement Controls & Proofing, Training, Document Control
Change Management; X-bar & R Charts, Tolerancing , Simulations, Field
Process Capability; Validate & Reliability Control Plan; Scale-Up and Performance Measurement; System, Change Management; Impact
I & mR Charts, Attribute Data, Charts (p, Testing; Control Charts, House of
Translate; Audit Commercialize Product or Process; Validate and Translate; Audit Validation (DPMO, COPQ, Dashboard
np, u, c), Minitab (Quality Tools); Impact Quality Matrix III, Quality Plan
Implement on-going Performance Metric); Audit Format
Validation (DPMO, COPQ, Big “Y”);
Monitors; Feedback for Continuous
Audit Format
Improvement
Typical Quick Hit Method 8-D K-T Failure Analysis
Activities Tools Activities Tools Activities Tools PHASE

DEFINE
4-Block, Stakeholder Analysis, D1 - Recognize a Need for 8-D Business Data Analysis, Team
Problem Definition, Project Business Metrics and Process
SIPOC, In/Out Frame Tool, VOC and Establish a Team; D2 - Charter; Is/Is Not, Pictures, Recognize a Problem
Scoping Monitoring
Analysis, CTQ Tree Describe the Problem Problem Statement, 4-block

MEASURE / IDENTIFY
Detail Current process, Establish Describe the Problem (State IS/ IS NOT Matrix, WHAT/
Process Maps, Cause & Effect D3 - Develop Interim
Baseline, Identify Potential Containment Plan Problem as an Unknown, Specify WHERE/ WHEN/ EXTENT
Diagrams Containment Action (ICA)
Causes Problem) (Distinction - Change) Matrix

ANALYZE / CHARACTERIZE
C&E Diagram, Process Maps, Process Experts, Process Maps,
Determine Root Causes, Prioritize Cause & Effect Diagrams, Cause D4 - Define & Verify Root Cause
FMEA, 5 Whys, DOE, Conjoint Identify Possible Causes Data Analysis Tools, Fact-Finding
Causes for Action & Effect Matrix and Escape Point
Analysis, Historical Data Tools

IMPROVE / OPTIMIZE
D5 - Choose & Verify Permanent Mistake Proofing, Error Proofing,
Brainstorming, Pugh Matrix, Pilot Corrective Actions (PCAs) for Machine Settings, Specifications,
Develop Action Plan for Evaluate Possible Causes (Identify Possible Cause Matrix, IS/ IS
Plan, PDCA Cycle, SWOT Root Cause & Escape Point; D6 - SOPs, Visual Management,
Improvements Most Likely Cause) NOT Matrix
Analysis Implement & Validate Permanent Training, Implementation Plan,
Corrective Actions (PCAs) Action Item Table, Paynter Chart

CONTROL / VALIDATE

Develop Implementation Plan, D7 - Prevent Recurrence; D8 - Mistake Proofing, SPC, Control DOE, Simulations, other active
Develop Control Plan, Develop 4-Block, Communication Plan Recognize Team & Individual Plans, SOPs; Communication Confirm the True Cause tests, tools of DMAIC Improve/
Communication Plan Contributions Plan, Management Involvement Control phases
Internal Environment
Strengths Weaknesses
List of Activities Major Minor Major Minor

External Environment
Opportunity Threat
Attractiveness Probability of Succe Seriousness Probability of Occurrence
Six Sigma Project Charter Template
Project Name
Business Unit
Department
Start Date
Project Budget

Project Stakeholder Name Contact Information


Phone number e-mail
Project Champion
Process Owner
Black/ Green Belt
Team Members

Process Name

Product/ Service Description

Objective
Project Y Baseline Goal Entitlement

Project Scope Statement

Assumptions/ Constraints/ Risk

Benefits

Scheduale
Project Name

Suppliers Inputs Process Outputs


Providers of the Resources High Level Process Process
Resource Required Requirements Description Deliverables
What inputs are required
Who supplies the input to enable the process
1 1
2 Start

Process

End
Customers GAPS
Requirements Stakeholders Action Plan Timing Responsibility
Project Name

Management Man Method

Cause Cause

Cause
Cause Cause

Cause
Cause
Cause
Cause

Cause Cause Cause


Cause

Cause

Cause

Measurement Machine Material


Effect
(Y)
Project Name
Cause & Effect Matrix

Rating of Importance to
Customer
Project Outputs

Y 10

Y 11

Y 12

Y 13

Y 14

Y 15
Y1

Y2

Y3

Y4

Y5

Y6

Y7

Y8

Y9

Total
Process Step Process Inputs
1 Process Step 1 0
2 Process Step 1 0
3 Process Step 1 0
4 Process Step 2 0
5 Process Step 2 0
6 Process Step 2 0
7 Process Step 2 0
8 Process Step 3 0
9 Process Step 3 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

The role of Cause and Effect Matrix is to identify the inputs for FMEA. The input
variables with the highest total should be the first transferred to FMEA
Process/Product Failure Modes and Effects Analysis

Process or Product
Name Prepared by
Responsible Date

use
Process Step Failure Mode Failure Effects Causes Controls max
SEV
Action Resp Timing P P P P
S O D R
What controls are in place to E C E P
May be process step, general What is the potential S O D R What specific actions are When is completion of
If the failure mode occurs, What is/are the cause/s prevent the cause from occuring Who will be accountable for V C T N
activity, functional area, or failure or undesirable
what will the effect be? E of the failure? C or to detect that the cause has E P required to improve the RPN
implementing the change
the action required or
other rational grouping outcome for this area? V C T N number planned
occurred?

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0
Capability Summary
Project Name
Process or Product
Name Prepared by
Responsible Date

Customer
Measurement %R&R or Upper Lower Sample
Requirement Target Cp Cpk Date Actions
Technique P/T Ratio Specification Specification Size
(Output Variable)

Key Process Output Variable


Process Control Plan

Process or
Product Name Prepared by
Responsible Date

Specification/
Variable
Requirement
Sub
Specification Measuremen Frequenc Control Decision Rule/
Process Process Sample Size
Characteristic t Method y Method Corrective Action
Step KPOV KPIV LSL Target USL
Six Sigma Project Selection Grid Bubble Assessment Grid for
Bubble size indicates probability o
Rating scale criteria should be defined and probability
agreed to prior to rating the projects. 6

Scale: 1 - 5 Range: 1-25


5
Project Prob of Desireability
Proj # Name Effort Impact Success Index
1 Project A 5 4 4 3.2 4
2 Project B 2 3 4 6.0
3 Project C 3 5 4 6.7

Impact
4 Project D 3 2 3 2.0 3
5 Project E 3 1 2 0.7
6 Project F 2 3 5 7.5
7 Project G 5 1 3 0.6 2
8 Project H 2 3 1 1.5
9 Project I 1 5 4 20.0
10 Project J 4 4 2 2.0 1

0
0 1 2 3

Effort
ubble Assessment Grid for Project Selection
size indicates probability of success (large = high
probability)

1
2
3
4
5
6
7
8
9
10

1 2 3 4 5 6

Effort
Descriptors
Six Sigma High High Low

Project Med Med Med


Selection
Tool Low Low High

Weighting (weight can be changed based on business conditions)


20% 10% 30%

Probability of Resources
Project Business Impact Success Required
Project A 5 5 2
Project B 5 4 5
Project C 5 2 4
Project D 2 4 3
Project E 3 3 5
Project F 2 5 1
Project G 2 4 3
Project H 1 3 3
Project I 2 2 2
Project J 1 1 4
Rating
< 3 Mos 5 GO
4 Mos 4 GO
5 Mos 3 Caution
6 Mos 2 Caution
> 6 Mos 1 BEWARE

on business conditions) click to


30% sort

Time to Complete Total


5 3.60
3 3.80
5 3.90
5 3.20
3 3.30
1 1.50
1 2.00
4 2.60
4 2.40
5 3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

You might also like