Professional Documents
Culture Documents
Six Sigma Tools For Define
Six Sigma Tools For Define
DEFINE
4-Block, Stakeholder Analysis, D1 - Recognize a Need for 8-D Business Data Analysis, Team
Problem Definition, Project Business Metrics and Process
SIPOC, In/Out Frame Tool, VOC and Establish a Team; D2 - Charter; Is/Is Not, Pictures, Recognize a Problem
Scoping Monitoring
Analysis, CTQ Tree Describe the Problem Problem Statement, 4-block
MEASURE / IDENTIFY
Detail Current process, Establish Describe the Problem (State IS/ IS NOT Matrix, WHAT/
Process Maps, Cause & Effect D3 - Develop Interim
Baseline, Identify Potential Containment Plan Problem as an Unknown, Specify WHERE/ WHEN/ EXTENT
Diagrams Containment Action (ICA)
Causes Problem) (Distinction - Change) Matrix
ANALYZE / CHARACTERIZE
C&E Diagram, Process Maps, Process Experts, Process Maps,
Determine Root Causes, Prioritize Cause & Effect Diagrams, Cause D4 - Define & Verify Root Cause
FMEA, 5 Whys, DOE, Conjoint Identify Possible Causes Data Analysis Tools, Fact-Finding
Causes for Action & Effect Matrix and Escape Point
Analysis, Historical Data Tools
IMPROVE / OPTIMIZE
D5 - Choose & Verify Permanent Mistake Proofing, Error Proofing,
Brainstorming, Pugh Matrix, Pilot Corrective Actions (PCAs) for Machine Settings, Specifications,
Develop Action Plan for Evaluate Possible Causes (Identify Possible Cause Matrix, IS/ IS
Plan, PDCA Cycle, SWOT Root Cause & Escape Point; D6 - SOPs, Visual Management,
Improvements Most Likely Cause) NOT Matrix
Analysis Implement & Validate Permanent Training, Implementation Plan,
Corrective Actions (PCAs) Action Item Table, Paynter Chart
CONTROL / VALIDATE
Develop Implementation Plan, D7 - Prevent Recurrence; D8 - Mistake Proofing, SPC, Control DOE, Simulations, other active
Develop Control Plan, Develop 4-Block, Communication Plan Recognize Team & Individual Plans, SOPs; Communication Confirm the True Cause tests, tools of DMAIC Improve/
Communication Plan Contributions Plan, Management Involvement Control phases
Internal Environment
Strengths Weaknesses
List of Activities Major Minor Major Minor
External Environment
Opportunity Threat
Attractiveness Probability of Succe Seriousness Probability of Occurrence
Six Sigma Project Charter Template
Project Name
Business Unit
Department
Start Date
Project Budget
Process Name
Objective
Project Y Baseline Goal Entitlement
Benefits
Scheduale
Project Name
Process
End
Customers GAPS
Requirements Stakeholders Action Plan Timing Responsibility
Project Name
Cause Cause
Cause
Cause Cause
Cause
Cause
Cause
Cause
Cause
Cause
Rating of Importance to
Customer
Project Outputs
Y 10
Y 11
Y 12
Y 13
Y 14
Y 15
Y1
Y2
Y3
Y4
Y5
Y6
Y7
Y8
Y9
Total
Process Step Process Inputs
1 Process Step 1 0
2 Process Step 1 0
3 Process Step 1 0
4 Process Step 2 0
5 Process Step 2 0
6 Process Step 2 0
7 Process Step 2 0
8 Process Step 3 0
9 Process Step 3 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
The role of Cause and Effect Matrix is to identify the inputs for FMEA. The input
variables with the highest total should be the first transferred to FMEA
Process/Product Failure Modes and Effects Analysis
Process or Product
Name Prepared by
Responsible Date
use
Process Step Failure Mode Failure Effects Causes Controls max
SEV
Action Resp Timing P P P P
S O D R
What controls are in place to E C E P
May be process step, general What is the potential S O D R What specific actions are When is completion of
If the failure mode occurs, What is/are the cause/s prevent the cause from occuring Who will be accountable for V C T N
activity, functional area, or failure or undesirable
what will the effect be? E of the failure? C or to detect that the cause has E P required to improve the RPN
implementing the change
the action required or
other rational grouping outcome for this area? V C T N number planned
occurred?
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Capability Summary
Project Name
Process or Product
Name Prepared by
Responsible Date
Customer
Measurement %R&R or Upper Lower Sample
Requirement Target Cp Cpk Date Actions
Technique P/T Ratio Specification Specification Size
(Output Variable)
Process or
Product Name Prepared by
Responsible Date
Specification/
Variable
Requirement
Sub
Specification Measuremen Frequenc Control Decision Rule/
Process Process Sample Size
Characteristic t Method y Method Corrective Action
Step KPOV KPIV LSL Target USL
Six Sigma Project Selection Grid Bubble Assessment Grid for
Bubble size indicates probability o
Rating scale criteria should be defined and probability
agreed to prior to rating the projects. 6
Impact
4 Project D 3 2 3 2.0 3
5 Project E 3 1 2 0.7
6 Project F 2 3 5 7.5
7 Project G 5 1 3 0.6 2
8 Project H 2 3 1 1.5
9 Project I 1 5 4 20.0
10 Project J 4 4 2 2.0 1
0
0 1 2 3
Effort
ubble Assessment Grid for Project Selection
size indicates probability of success (large = high
probability)
1
2
3
4
5
6
7
8
9
10
1 2 3 4 5 6
Effort
Descriptors
Six Sigma High High Low
Probability of Resources
Project Business Impact Success Required
Project A 5 5 2
Project B 5 4 5
Project C 5 2 4
Project D 2 4 3
Project E 3 3 5
Project F 2 5 1
Project G 2 4 3
Project H 1 3 3
Project I 2 2 2
Project J 1 1 4
Rating
< 3 Mos 5 GO
4 Mos 4 GO
5 Mos 3 Caution
6 Mos 2 Caution
> 6 Mos 1 BEWARE