Professional Documents
Culture Documents
● Policy Decision has been taken to establish GSUs in all 68 Divisions of Indian
Railways
● Headed by CPM - Chief Project Manager. CPM is under the administrative control
of DRM - Divisional Railway Manager
● CPM post - open to all cadres (except IRPFS - Indian Railways Protection Force
Services)
● If more than two ADRMs are available in the Division - the post of one ADRM will be
re-designated as CPM. If having two or one ADRM in the Division, make suitable
adjustments in the cadre.
● Officers of Civil Engineering, S&T, Electrical, Traffic & Finance will be posted at GSU
● DFM/ADFM along with SSO(A) & other staff - posted exclusively for GSU - Will work
under the functional control of Sr.DFM but under the administrative control of CPM/GSU
●
Surveys - GSU
● Undertaking Feasibility Study & Preparation of DPR - Detailed Project Report for the
Projects - by GSUs only. Necessary changes in the Engineering Code are being
processed separately.
● Feasibility study report - examined by the NPG of the Division (NPG stands for Network
Planning Group)
● Approved DPRs (by GM) along with the Finance concurrence of GSU at Division
(Finance concurrence at Hqrs will not be required) - will be submitted to the newly
created Gati Shakti Directorate in the Railway Board.
● DRM & CPM have powers of CAO/C & SAG officer in Construction for the execution of
works of GSU.
● Proposals requiring the sanction of the Railway Board should be sent directly to the Gati
Shakti Directorate with the approval of GM and concurrence of associated finance at the
Division (Not Hqrs)
● Existing Divisional units dealing with ESPs, SWRs, SIPs, and LOPs shall also assist the
GSU. If further assistance is required, it may be arranged through outsourcing.
● Supervision and Execution of Works - Can use PSSA (Project Supervisors Services
Agencies) and PMS as per the need of the Project
● Also, hire retired Railway supervisors below the age of 65 years with the approval of
DRM - within the overall provisions in the estimates of the projects
● Air travel outside the Zonal Railways - permitted for Offices & Supervisors - in
connection with works - With DRMs approval. Concurrence is not required.
Objects:
● All proposals emanating from Gati Shakti Directorate - Concurred by its own Associate
Finance headed by ED/GS (Finance) - Executive Director/Gati Shakti
Rs. 1000 Crores & Member Finance NITI Aayog, EBR - CCEA - Cabinet
above Expanded Board for Committee on
Railways chaired by Economic Affairs
Chairman & CEO,
Railway Board
● Projects costing Rs. 50 Crores and above - Preparation of DPR - Detailed Project
Report is mandatory before they are processed for sanction of the competent authority.
● Rs. 100 Crores to Rs. 1000 Crores - Approval by Minister of Railways. Less than
Rs.100 Crores - CRB & CEO and More than 1000 Crores - CCEA
Key Takeaways for MCQ
16. Gati Shakti Directorate was created by clubbing the following Plan Heads
— end —-