You are on page 1of 28
DOCUMENT NO.: KPI/ISD/4/L/PSP/14008 1 = Kenya Power SPECIFICATION FOR OVERHEAD LINE FAULT INDICATORS. A Dooument of he Kenya Power & Lighting Ple January 2004 Doc Ra) RPI/ISD/ATATISPIATOO8 Yt nme [see —— Joverneao une rauur Revision, Kenya Power an Date offssue 2024-01-15 | age tof ze “Table OF Contents 0.1 Circulation List 0.2 Amendment Record 0.3 Forward 10 Scope, 20, Nomative References 30 Definitions & Abbevitons. 31, Abbreviations, 40. Requirements 4.1, Service Coins 42. Design and construction 43, Fault Indicator Modul, 44, Communications 45 The Ful Indicator Data Managemen! System. 50 Test Requirements 60, Marking & Packing. 61, Marking. 62. Packing 70. Wananty 80, Training Appendices [Ac Test Inspections (Normative). Quality Management Systems (Normative) “Techical Documentations (Normative). Giuaraneed Technical Parcs (Normative). of Departmen ‘Send Date:2024-01-78 7 pate 2028-00515 WPI/A30/8 17/1 OVERHEAD LINE FAULT ® [bate oftsue | aoe 011s rpicaToR Page Zor26 COPY HOLDER [1 ianane, Standind lsewonis py (pai on Kenya Power server (p:/172.16.140'dnhrowse pip? Foldertd23) REVISION OF KPLC STANDARDS To keep abreast of progress in the industry, KPLC Standards shall be rgulely reviewed Suggestions for improvements to approved Standards, addressed to the Manage, Standans Deparment are weleome, © Kenya Power & Lighting Co.Ltd, Users are remind that by Seton 25 ofthe Copyright Act, 2001 (Revised 2018) Cap 130 ofthe Laws of Kenys, copyright subsists in all KPLC Standards and except as provided under Sexton 26 of his Act no KPLC Standard produced by KPLC may be reproduced, sored ina reieval system, by any means without prior permission frm the Managing Director & CEO, KPLC fo Date: 202407 ead of Department, Stands | Sed: Dater202-0115 me: = ‘overneaD uNeFauut | Revision No. Kenya Power anne ‘Date oflesue zoeoris Page Fol26 02° AMENDMENT RECORD Re [Date ription of Approved by (Name Naa | eeraeneooy ‘s Signature) aa “Head of Section, Standards Development ‘ead of Department, Standards Sona Spe Dats 2024-0115 Date: 202¢-0115 T Doc. No.) KPI/130/4/1/159/14/008 ¥ jane iets —| lovanneaounarauer | Rrisonne| 0 Kenya Power een arate | —anaeonis Page 40f26 03 FOREWORD “This spesiication has heen prepared bythe Standards Department in colaboration with Disibuton [Network both of The Kenya Power and Lighung Company Limited. The specification ays down reauirement for Overhead Line Fal Indicator. This speification i intended for use by KPLC to procure the Overhead Fault indiator. ‘A key perfomance indicator in any distribution netvork is the ime taken 1 estore supply aller 2 ‘supply intemuption, One of the masagement ools used to measure the network performance is SSAIDI- System Average Ineripion Duration Index. It measures how longi takes before an outage Invesolved and customers ae reored tack 1 ppl Revocation of supply afer an interptionhowsver, oly happens afer the source of aul has been fonds therefore important tha the methodology used to race and find faults boul shorten the search time, Tiss exatly what the remotely monitored Overhead Line Fault Indicator hasbeen ‘designed for; to quicken the loating the section ofthe line which has ful. This specification sipalates the minimum requirements for Overhead Fault indicators acceptable for use in KPLC power network Tre are no othe specifications in this seve Iv stall be the responsiblity of the supers and manufactures to ensure that the ofered design i fof tv highest quaity and guarantees exceleat scrvice to KPLC, goed workmanship and good ‘oginccring practice inthe manulacut ofthe ovetead line Fuh indict ‘Users of Kenya Power speciation are esponsibefortheirconectintrpctation and application. “Te flowing are members ofthe tam that developed this specification Name Department Benson Danes “Sandals Falck Roth | Disibuon Newark aT RST Diarbaion Newark Head of Departwent 2 Signed aN Date; 2024-01515 Date: 2024.01.15 Y Kenya Power 1. score, Toe. No, WPI/TSD/A/A/ASP/IA7008 ‘rete Tasue No, [OVERHEAD LINE FAULT | Revision No. ° | Dateoftsaue 202408418 Page 526 twpicaToR LLL. This specication covers technical requirements for ovecead line fault indicator, tat shall be used by KPLC’s Distribution Network Department, 1.2. The specification covers requirements for Design, Inspection and Tests, Installation and ‘Training cf Overhead Fault Indiatr 2. NORMATIVE REFERENCES. ‘The following standards contain provision which trough reference in this tet, conatiste provisions of thisspecifiation, Fr dated editions the cited elton will apply; for undated edition the Inte edition of the referenced document shall apply. IEC 61557-1 tc ass OIMLD LL cispR 22 IEEE 495 448 1c 60529; 180 9001 ISONEC 17025 te 61000 18 60060 letiza salty in tow voltage disubuton systems upto 1,000Var and 1,500Ve - Equipment for testing, measuring oF monitoring of protective measures. Part General requirements Selection and dimensioning of high vltoge insulators intended for use in polled conditions Part I: Deion, information and general principles General Requirements for Measuring Instruments - Environmental Conditions Electromagnetic Compatibility (EMC) Part 4.2: Pa 6.2 Testing guides conditions procedures, andes for fled cite inctors DDegres of proteston provided by enclosures (IP code) (Quality Managemen Systems - Requirements General Requiement othe competence of testing and ealibation abortoris, ensurement methods, equipment, tnd inleprelation of appiebility of limi ines Aigh voltage test ecics ead of Seton, Standards Development Departmen Signed: Date: 2024-01-45 Date: 202404 Doc No. | RPI/i30/4/1/59/14/008 | \ True: TeeWo OVERHEAD LINEFAULT Revision io ° Kenya Power Dateoftisue |) 2024-075 npIcaToR Page 6 0f26 1S0 16508 Recommendations of he CIE foe the colors of signa ightng an laminations. 1597081993). Stockbdge Vitvation damping propenies for overhead power ines 5. DEFINITIONS AND ABBREVIATIONS Forte purpase ofthis spesfction the definitions and abbreviation given nth erence standards shall apply together wih the ollowing abbreviations SAL Abbreviations KPLC- Kenya Power ad Lishing Company Plc 150 ~tnematonal Organization for Standardization LED Ligh Emiting Diode Kg Kilogram kV -kitovol TP Ingress Protection LV -Low Voltage EMC - Electromagnetic Compatibility [BU ~ European Union SCADA -Supervsory Cont and Data Acquisition Head of Section, Standards Development | __‘Head of Department, Standards a Sipe Date: 2024-0115 Date 2024-01-15 ‘Doc Non) KPI/IS0/4/1/13"/147008 OVERHEADLuNE FAULT | Revision No . | Date oftsue | age 70f26 CU: Data concentrator Unit AIDE Sytem Average Interupion Duration Indes EMC Plecromageeti Compaibiliy SFI Stave Fault Indicator [MEI Marer Ful Indoor FIDMS Flt Indicator Dats Management Sytem 4. REQUIREMENTS 41, Service Conditions 4.1.1 The overead line ful indicator shal be suitable for continuous outdoors use in opie aeas nin hash climatic conditions including areas exposed: 2 Altitudes of wp to 2200m above Sa evel 1b) Humidiy up to 90% «) Average ambient temperature of * 30 with minimum of-1"C anda maximum of "40°C 4) sokeruic levels of upto 160 thunderstorm days er yea: «) Pollaton (IEC 60815) Very Heavy Cass IV Design ard Construction ead of Department, Standards Signed Date: 2024-0015 Date: 2024-0115 Bees Ne, | KPI/I30/4/1/190/ 147008 ent Teena overHEADLiNerautt Revision 0 Dyoflewe | 2026018 IpicaToR Pages of26 The overhead lie fal indicator shall be designed, manufactured and ested according to TEC ss The Overhead! Line Fall Indeator shall be electronic nd sal be designed for application on specific voltage class of 1TKV.S3KV,66KV and [32RV overhead lines operating a SOH2. The ‘exec voltage that the Ful indiator will monitor shal e specified for eich ender, ‘Afi inictor set shall be able to monitor line sections and chuiage of 10km on ether sie of its mounting position. The fl indieator shall detect phase 1o phase fouls, thre phase to ground ful, ath fauls, tansen faults and wotae loses om any ofthe network phases itis installed “The measurement securacy ofthe ful indcaor sll be 98% or beer over the range rated ‘inimu to rated maximum voltages and shall operate between 87% and 103% ofthe nominal pean fequeney of SOM “The lt indicator shal be ble to withstand without damage, transient voltages that may appear Tacrers O | pate:207¢0115 Txei7is0/4/i/1se7 147008 nme jsseWo | Date ofssue 20 OLIS __] wpicaroR i. Blecromagnetic compatiblity EMC) i. Impulse overvokage tess onthe equipment Clearances ii, Dielectric wage withstands tess onthe equipment - Controlled overage ©) Fanetioal tess on the instruments that shall include: 1 Clea indication i Clear perceptibly of visual indication ii, Frequency dependence ius Response time ‘Power source dependability vie Check of testing element vi, Nontespoase to de vole vai, Tie rating 4) Type tests for printed circuit board coating performance 1 Bovronment, humidity and thermal conivonng tests 8. Dielectric voltage withstand tess ti, Provetion agains bridging for indooroutdoor ype iv. Protection aginst bridging for outdoor type Spark eitance vic Comparative aching index (CTD vii, Resistance to soldering hea test vii, Flammability test ix. Coating adhesion test 1 Insulation resistance between conducting pas a of Section, Standards Development Head of Department, Standards ‘Signet ‘Signed: Date:z02¢-01-15 —— Date: 2024-01-15 Doc.No | RPI/ABO/474/H/ 187008 me: Tesue Wo T ‘OVERHEAD LuNE FauL | Revision No. ° | Page 15 0r26 61. MARKING ‘The following information shall be marked legibly and permanently on the overhead line fault {The Mansfcturer’s Name o Trade Mark; {i Voltage designation 4, Model Number Iv, Serial Nebr Letters “Propeny OF Kenya Power & Lighting Ple 62. PACKING 621. Theoverted ine ful indicator shall be packed ina carpingeate 201 protest from damage and enty of moisture daring transportation, handling an storage. (622. The caying ease stall shock prot and impact resistant and shall be able to withstand fll of overhead ine ful indicator 7.0 WARRANTY TL The overhead ine fal indicator shall be backed bya minimum of 1-months waranty peri. 112 Technical sapportand software upgrade, forthe fal indicator where applicable shal be provided fice of cage to KPLC for period of nots han 36 months 73 The Bidder sll submit a clase by clase statement of compliance with the peifiation( TP) ogebor with eapes of the manufacturer's extalogues, brochures echnical dats and. proven test repos. ll in English for evahation, scoring to Appendix Cl of this Speciation The manufactures ype referenceldesigaton of the tem offered stall be inicted ead of Section, Standards Development Head of Department, Standards = Signed Date: 2024-0118 | pste:2024-0145 TBee:No. | KPU/is0/A/4/R9P/I47006 ‘me: [Tsuen i COvERHEAD UNE FAULT | Revision No. ° Dateoflewe | 2026015 INDICATOR | Page 16 of26 “14h cas of tender award technica detail forthe overhead ine Fh indicator shal be subenited tothe Kenya Power for approval before manicure commence seconing to Appendix C2 af ‘his Speciation, 8.0 TRAINING. ing a the manufacturer Premises 811. The siccesfl bidlermanoficirr stall anange to conduct a Factory Acceptance Test forthe ‘manufactured Overhead Fault ndieator. The Factory Acceptance Test shall include wining for the overhead feu indicator for four (4) KPLC EngineerTeenicians Atleast to (2) of he Engincers Technicians sal be users. “he raining shall nlude theory followed by proctical demonstrations on how to instal the ful fndieatos ona live network and a yuide on comect use for achieving comeet measurement results All he epeatonal procedures sal be exhaustively explained and demonstrated. The mancfsctrer sal plan adequate tine forth ting which shall be conducted by the Inanufactore's exper. The duration and location of the training shall be determined by the raanafctre. “he taining shall be dimmed successful once the enginersechncins are able fo install test and operate the equipment. ‘The manufctre shal etl the tla cost of he Factory training Local Training Following the delivery of the overhead fault indiestor, the manufacturer shall conduct waning forthe equipment in Nairobi, Kenya. The raining shall be conducted in one session of 20KPLC ngineerStecaiians. The sesio sal last at leas thre (3) days “Te tsning shall include tory on features an how the equipment works followed by practical emonstations eluding parameter seings. Al steps shall be exhaustively explained and demonstrate “The Training sal be considered to have bon successfl once the engineers technicians ae ale tocompletely install est and operate the equipment ‘Te supplier shall meee all the costs for conducting the local trinng,ineluing loca secommodaton and transport for thei walning staff. The supliee sell provide al the waning ‘naerils neloding nates, Head of Section, Standards Development Head of Department, Standards a a Date: 252401-18 Date 2020115 Doe No, TPI/130/4/1/T9P/1A/008 me: Tesue Wo 7 overnieaD unerauit Revisions | 0 | Dateottesue 2on4 0415 Page 17 of 26 APPENDICIES: [As TESTS AND INSPECTION (Normative) ‘AL Isha be he responsibiliy ofthe supplier o test orto have ll he relevant tests performed on the overhead line fault incisor. ‘A2 Copies of previous Testealibration Reports of overd ine fut indicator issued by ows or third party testing laboratory tht is aceredited to ISOIEC 17025:2008 or 17025:2017 sall be ubmited ith the tender forthe purpose of technical evalaton. A copy ofthe accrediation erties forthe testing laboratory shall als be submited with the tener (all in English Language). Any ransations of eetiiats and tet repos into English language shall be signed and stamped bythe Testing Author. |A4 On receipt of the Overhead Fault indicator, Kenya Power will inspect the items and may perform relevant test in oder to verify compliance withthe specification. The supplier shall replace without charge to Kenya Power, any overhead line fut indicator unit which upon test or use fal to meet anyor al the requsemeats in the specification, 1B: QUALITY MANAGEMENT SYSTEM (Normative) 18.1 The supplir shall submit a Quality Assurance Plan (QAP) that wil be used to ensue that the ‘overhead line fall indiatorpysesl propeics, tests and documentation, will fil the requirements stated inthe contact documents, standards, apocfcations and regulations, The ‘QAP sallbe based onan incl relevant pats to fulfil he requitemens of ISO 9001: 2015, B2_ The Monuictres’s Declaration of Conformity to applicable standards and copes of quality management certifications including copy of valid ad relevant ISO 9001:2015cerieate shall ‘be eubmied with the tender for evaluation, [B23 The bidder shal indicate the delivery time of the equipment A detailed it & contact adresses Gnluding email ofthe mspulacturers previous customers for similar type ofthe fal ndiator sold shl be submited with the tender fr evaluation, ead of Section, Standards Development Teed of Department, Standards p | Sieneds Doc Ne. KPI/TDD/A/A7199/147008 OVERHEAD UNE FAULT | Revision No. ® Date oflzwue OTIS | Page 18orz6 npicaToR ‘TECHNICAL DOCUMENTATION (Normative) The bier shall submits ender complet with technical documents for tne evaluation. The Technical documents 10 be submited (all in English language) for tender evaluation shall inelode he flowing Fully fled clause by clase guaranteed technical particulars (GTP) signed by the manuactrer, 1 indicated in Appendix D of thie Speciation Copies of the Manufacturer’ etlogucs, brochures, drawings giving all elevant dimensions, ‘Wiring diagram / Schematic Diagram and echnical dat; Records for previous projets, local or frig, forthe items, Details of manufacturing capacity and the manufacturers experience Copies of required tesaliration reports oftesting/calbrating laboratory screed to ISOIEC 705 ‘Copy of accedtation certfiate to ISOMTEC 1702S forthe vesing/albvating laboratry Manufacturers letter of authorization, ISO 9001 eenificte, and otber technical documents quired inthe tender Manufactre’s waranty and guranee; subject wo 12 months from dae ef delivery of items to KPLC sores, (Operational and sevice manus forthe items “The sucessful bier (cuplin) shall submit the following documeatsetas to The Kenya ower & Lighting Company for approval before manufacture: Fully filled clause by clause gusraniced technical parculars (GTP) stamped and signed by the ‘manufacturer as indicated in Appendix D ofthis Speciation Drawings of he overhead line fal indicatr tobe manufactured for KPLC Product operation manuals and brochures, (Quality assurance plan (QAP) used to ensure tht the design, material workmanship, tests, service capability, maintenance and documentation will fulfil the requremens sated inthe Head of Section, Standards Development end of Department, Standards sont = Seed epee Date: 2024-01 pater 208-0118 Dee. No, KPI/130/4/1/15/147008 vrs: “auena OVERHEAD UNEFAULT Revision Wo, 7 ivotcaror Daleoflewe | 2024-01-15 Page 19 0f26 coniract documents, standards, pecfcations and regulations. The QAP shall be base on and Include, relevant pars ofall th requirements of 150 900:2015 “Marking details and method to be wed in marking the Ovehead Line Fast Indicator All documentation necessary for safety ofthe spent. Packaging detail (including packaging mater) (C3. The supplier stall submit ecommendations forse, care, storage and rstne inspestontesting ‘rocedhres ll inthe English Language, during delivery ofthe overhead line fal indicator KPLC stores THIS SPACE IS LEFT BLANK. ‘ead of Section, Standards Development “Head of Department, Sianed: et Date: 2020-0118 WPT/ASD/A/ A/F 1/008 irr: | lovernieaDLinerauLT | Revision Wo, ° jDaieortewe aeons twpicaToR [Page 200r26 D: GUARANTEED TECHNICAL PARTICULARS (Normative) Toefl ad signed by the Manuctuer and submited together wth relevant copes ofthe Manufacturer's catlogues, brochures, diavings technical dat, glee records for previous ve years, four customer reference eters, details of supplier capacity and experience: and copies of complete ‘ype tes cotfetes and test reports for tnder evaluation, al i English Language) ‘Bidders name and Adres. = = Manuicirer® Name and ress Coaniry of anutocture ‘Nate and ode! Number 7 Manuf’ Name and address “| Seope | Normative References | Defniions nd Abbreviations Requirements [Service Cmdiioms ——SSSCSCSC*~*~*~S~S~«S Desiga and consiruction ‘Slandi o design w anaacare Bae | Aviation Voltage, Proqueney Specify | Monitoring range of oe ndestor unit —— Tsai alts ndlinesbnormabiis deiesion pes Sate | Monitoring and measurement accuracy and ~ | State Head of Section, Standards Development Head of Department, Standards a — Se ba i Dat 202 0015 Doe.No. | KPI/I9074/1/19°/14700" me: Taso Wo oveRHEADLINEFAULT Revision. iwoicaton Date offeaue| eRe oLs Page 210826 Requirement ‘KPLC | Bader’ Requirement offer Duriy agains tine ats ‘State Thre Overvend Line Fruit Tndicator Module design and packaging Sate Mounting type and conductor clamp sizes State ‘Module anston ements Sate Mode tnction dements? "Sia Mounting type and provisions Jie Tine i prion viene tae | Setinas and Calbation provisions | ae Protein agains Tine lis ae Power Sippy Schemes ste Batiery ype and old wptime SSS nar changing Gwe and ber Series ie Sie Pysicaindicaton iy and ange of sbi ‘Sate Degree F casing potion and TP indices. "Sate Compal and compliance to EMC requirements ‘Site ——_— ‘Care ek up measurement anges Sate ‘Weight each Fault indcstor Unit Commusicntions nn ‘Commurication architecture and design forthe fault indicator | State Head of Section Standards Development Bec Ne \ srrrue: |issuena lovernieap une rautt | Revision No. ° Kenya Power | Date oftesve ma ORIS wprcaToR Page 22 0126 | Tate Technical particulars inase Requirement KPLC [Bidders smo Requirment | offer [AI The sommunizaion Vink and ype bawees te aul eiesion | Sate seminal nis “a3 Security provisions for communicaton madulevehamnels | Spesily (a5 | WAN Communication Gateway ypeimodule Spaily 25 The Fait indcntor Data Management System(FIDMS) | S483 Design whiesure of ackend Tul indieatar managenent Spey] ~ 254 |The progam feily resources and coverage Specify 88 | Cyber aecuriy chemes on progam Spay 755 | AST aptin oF the Tal ndeator maRBBEMER| Spsily system | 57 | Operating Panel of teu indicator management yen Specify | 25.8 | Mobile appli of the ful ndcator management yim | Spesify 59 eegriion and copay owes wile progans | Spesiy | | —a.10- Table Tecnica parieuls of Nework Fault nication Parameter KPLC Requirements ‘Application Volage | TIRV, SRV, HRV TSE State ‘Max: load fut caren | BDA Bae Aecuey 05% Sie | ors Cut Sa | wthsanésime 28kA, 36 | Head of Section, Standards Development signed: > Date: 2024.01 hae 2024015 Head of Depart, Stands C Se Tack RATATAT OF \ rms i: 3 OVERHEAD LINE FAULT | Revision No. ° Ken Poner = : | tere nats aie nears tage a6 ise — Jaane eve [iar] er erect | ‘Earth-fault Response y |. [| Cat Congres jas) sistentig | OP | Configurable Default 15 Flashes | sate | 1 | per Minute | I ‘iumination intensity: Automati: | state T t Fran iso ie Tnor aie] LonBay 302 7AR Sane] ‘cae | Baye Toye Sas ‘Max Indicator weight | 40 kg Max ‘State T ‘State T Clan Der Raat | ‘Communication ‘State T | eswarRs20se4ceDoe ssw aa TEC, can, 8, ae Nain: Grts Udrih etn, inal ye Tet | ong w EES 07 |S 50a Reem ‘S.1__| Manufacturer's capabilities of inspections and testing ‘State a ‘sh ead of Seaton, Standards Development Saved Pe ~~ Sianed Dat 20240115 EEE Date: 202-015 ead of Department, Saadards Doe. No. PI/130/4/1/158/14/008 \ ame ‘ewene | lovenseaD une rauut Revision ° Kenya Power Dateofiesve “20260115 INDICATOR Hause | Requirement | KPLC [piader's ber Requirement offer : “reopy of the area eins andthe seope of 4 ssreditation 53 | Copies of enealbtion repons — a Tear we canisdoa | Speaiy | 50 | Marking ane Packing [ 6 t [Waking [Specify | | 62 | Racking ~ ~ [se 7 | Warany: Sate drain. Sale Ti Sal be bake by miniman oF -montisfstry warranty | Sate a 72 | Rall provide fee Tecrical support and software upgrade to | State | KENVA POWER fora period of oes than 36 months 73 | Siallwbmit acluse by-clause statement afcomplance wil | Sate ‘ae specifications together with copies of the manures taalogues brochures chal data and proven tet reports Alarly marked to support each clause all in Faglsh for ‘vation The manufoctrers type referenceldesignaion of | ‘he tem offered shall be indicated 74 [Shall eobmit technical deals for he Overhead Faul [State indicator tothe Kenya Power fer epproval before manufacture 80 | Training RI | Training bye manutiourers premises Siate Tid | Training coverage and compliance with | Sate 815 | tequirements on the number and costs compliance 32 [loans SSS T 7 | ead ofSeston, Standards Development Head of Department, Standards Doe No. me Tss0e No. OVERREADLINE FauLT | Revision No Date ofan Page250f26 mproxToR Requirement ‘Training coverage and compliance with requirements on ths number and costs | Test and inspection Responsibiiy of crying ot tee Copies of Type Test Reports subminied with tender Tet cerfcates ad calirationceifcaes o be abmied by supplier to KPLC for approval before suppyidlivery "KPI/50/47 1 19P/ 14/008 as KPLC Bidders Reguiremeat offer Bate | compliance |A | Ispestion he storesandweplaccact of rejected tems ‘Quality Management System Quality Assurance Plan ead of Section, Standards Development Signed Copy oF BOOT 2015 Cerificate | Manuiacrersexperence [Tis of previous eustomers “Technical Documentaion ‘Documents submited with ender | Documents to be submited by supplier to KPLC Tor approval before manufacture | Documents tobe submited daring delivery atthe sore | "Stalement of deviations any & supporting documents "sae deviations ead of Depariment, Standards Date 20260 — Date z02e-01s T | Toe No) KPI/130/4/1/158/ 147008 \ ‘rue: issue Na ~ fovERHEAD UNE FAULT | Revision No. ° Kenya Power Date of eae oR OLAS INpicaToR Page 260726 Nore: 1) Bidders sal give fil details of the tems on offer as por the poicaton and applicable standards: The dels provided sll conform tothe txt reports and vir certifies, a well as labeled howings complete with dimensions, eatloguer andlor brochures for the purpose of tender cvaation ‘Bidders should note that the above Guaranteed Technival Particulars Schedales must be filly ‘completed and submits ith the bid. Wherever there i conflict beeen the GTP andthe clauses In the specifcotion, the clause in the speciation take precedence. Failre 19 complete the schedules shall oad to rejection of the bid 3) Guaranteed wales shall be specified. * Words like ‘agreed’ “conrmel’, “As per KPLC specications ee shal nt be accepted and shal be considered non-responsive fend of Setion, Standards Development Samet Date 202-0118 CO) Date: 2024-01-15 |

You might also like