Project Checklist for Preliminary Checks

This document provides a checklist for a project with the following sections: Preliminary Checks, Checks During Execution, and Post Execution Checks. The checklist includes items like ensuring approved shop drawings and method statements, proper storage of materials, work platform provision, tool availability, and following HSE regulations. It also includes checks for cable sizing and color as per approved drawings, cable spacing and dressing in trays, and temporary identification tags. The final section ensures proper housekeeping after activity completion. The checklist is to be signed off at various stages by Site Coordinator, ARCO, Force10 QA/QC, and NGC personnel.

Uploaded by

safeer Sulaiman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
716 views1 page

Project Checklist for Preliminary Checks

This document provides a checklist for a project with the following sections: Preliminary Checks, Checks During Execution, and Post Execution Checks. The checklist includes items like ensuring approved shop drawings and method statements, proper storage of materials, work platform provision, tool availability, and following HSE regulations. It also includes checks for cable sizing and color as per approved drawings, cable spacing and dressing in trays, and temporary identification tags. The final section ensures proper housekeeping after activity completion. The checklist is to be signed off at various stages by Site Coordinator, ARCO, Force10 QA/QC, and NGC personnel.

Uploaded by

safeer Sulaiman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

PROJECT NAME:

PROJECT No.

Doc. No. :

CHECK LIST FOR XXXXX Rev. No. :


Page : 01 of 01

SECTION OF WORK: LOCATION:


LEVEL: ITR No.:
STAGE ITEM Checked by Checked by Date
S/C ARCO
Ensure that shop drawings and Method Statement
approved by Consultant / Client.
Ensure the materials are approved, stored, and protected
properly.
Ensure that proper working platform is provided.
PRELIMINARY
CHECKS Latest approved shop drawings are available at work
area
Permit (if required) obtained prior to start Activity
Are the necessary tools available on-site?
HSE regulations / requirements are followed.
Check whether the size and colour of cables laid pulled
are as per approved Load Schedule and approved
drawings

Check whether the spacing between the clip are placed


CHECKS DURING as per ADCD and RSB regulations
EXECUTION
Check whether the Cable properly dressed in cable trays

Check whether the Identification tags or femures are


provided for cables and wires (Temporary)

POST EXECUTION Proper housekeeping done after activity


CHECKS

For ARCO QA/QC: Date: FOR Force10 QA/QC: Date: For NGC.: Date:
Name: Sign.: Name: Sign.: Name: Sign.: