PROJECT NAME:
PROJECT No.
Doc. No. :
CHECK LIST FOR XXXXX Rev. No. :
Page : 01 of 01
SECTION OF WORK: LOCATION:
LEVEL: ITR No.:
STAGE ITEM Checked by Checked by Date
S/C ARCO
Ensure that shop drawings and Method Statement
approved by Consultant / Client.
Ensure the materials are approved, stored, and protected
properly.
Ensure that proper working platform is provided.
PRELIMINARY
CHECKS Latest approved shop drawings are available at work
area
Permit (if required) obtained prior to start Activity
Are the necessary tools available on-site?
HSE regulations / requirements are followed.
Check whether the size and colour of cables laid pulled
are as per approved Load Schedule and approved
drawings
Check whether the spacing between the clip are placed
CHECKS DURING as per ADCD and RSB regulations
EXECUTION
Check whether the Cable properly dressed in cable trays
Check whether the Identification tags or femures are
provided for cables and wires (Temporary)
POST EXECUTION Proper housekeeping done after activity
CHECKS
For ARCO QA/QC: Date: FOR Force10 QA/QC: Date: For NGC.: Date:
Name: Sign.: Name: Sign.: Name: Sign.: