PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 1 of 15
PROJECT NAME:
PROJECT No.
METHOD STATEMENT
FOR
INSTALLATION OF ____________
MAIN CONTRACTOR:
Page 1 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 2 of 15
REVISION RECORD
This cover page is a record of all revisions of the document identified above by number and title. All previous cover pages are
hereby superseded and are to be destroyed.
CONTENTS
MAIN CONTRACTOR:
Page 2 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 3 of 15
1.0 PURPOSE
2.0 SCOPE
3.0 REFERENCES
4.0 DEFINITIONS
5.0 RESPONSIBILITIES
6.0 EQUIPMENT
7.0 PROCEDURE
8.0 ATTACHMENTS
1. PURPOSE
The purpose of this Method Statement is to provide the personnel associated with the works
referred with appropriate work methodology and test procedures, so that the Quality
MAIN CONTRACTOR:
Page 3 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 4 of 15
requirements as defined can be accomplished when planning and executing the works
described herein. This Method Statement outlines the work sequence intended for the
Installation of _________.
2. SCOPE
This method statement covers the detailed procedure to be followed for Installation ______
works at (location), within the scope of Arco Electromechanical LLC at (Project Name). This
procedure shall be read in conjunction with contract specification wherever applicable.
3. REFERENCES
4. DEFINITIONS
MAIN CONTRACTOR:
Page 4 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 5 of 15
Client
Project
Contractor
5. RESPONSIBILITIES
Project Manager
Ensure implemented QMS have been followed and project Objectives are set and
monitored.
Working closely under the guidance and direction of the Project Director and assist him in
the day to day duties of a project’s administration.
Assist in plan and spec analysis in order to provide clear, traceable and coordinated
interpretations of the design/drawings for construction.
Research and recommend solutions to design document problems, including conflicts,
interferences and errors/omissions.
Act as liaison with subcontractors in expediting drawings and related information.
Ensure Projects Log are Maintained accurately and up-to-date
Monitor field work, including contract work, to ensure compliance with company
MAIN CONTRACTOR:
Page 5 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 6 of 15
Construction Manager
Responsible for Site Foreman, Engineers, Area Package Managers, Direct Labour and
Subcontractors performance.
Responsible for all construction and site activities in accordance with the program and
in compliance with the quality specified.
Coordination with the Sub-contractors.
Implementing of the Contract requirements on site.
Site Safety and liaison with Safety Engineer.
Produce weekly short-term programs with the Planning Department.
Holding Weekly Coordination Meetings with sub-contractors, liaison with the staff.
Issuing Daily Labour& Plant records to the client representative and the project
management team.
Compiling Site Diary for recording:
Work being done
Recording Variation Work
Recording delays on site
Record contra changes
Progress against program
Weather conditions.
Action all method statements issued by subcontractors.
Liaison with the Client/Engineer and sub-contractors daily regarding site activities and
MAIN CONTRACTOR:
Page 6 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 7 of 15
issues.
Issuing of Non-Conformance Sheets to Sub-contractor, and Finance and Commercial Dept.
Recording site surveys of structure issues and advising Designers and copying the
Commercial Department.
Fill in Day Work Sheets if applicable.
Issue requests for inspections for site activities.
Keeping allocation sheets, recording any direct labour on site.
Maintain good relations with the Client Representative.
Site Engineer
Responsible for Site Foreman, Engineers, Area Package Managers, Direct Labour and
Subcontractors performance.
Responsible for all construction and site activities in accordance with the program and in
compliance with the quality specified.
Coordination with the Sub-contractors.
Implementing of the Contract requirements on site.
Follow Site Safety Plan and liaison with Safety Engineer for daily bases construction work.
Produce weekly short-term programs with the Planning Department.
Holding Weekly Coordination Meetings with sub-contractors, liaison with the staff Issuing
Daily Labour& Plant records to the client representative and the project management
team
Compiling Site Diary for recording:
Work being done
MAIN CONTRACTOR:
Page 7 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 8 of 15
QA/QC Engineer
MAIN CONTRACTOR:
Page 8 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 9 of 15
Logistics Coordinator
Responsible for all on site aspects of the logistics, supply chain, and waste management
operations.
In charge of all delivery process into site for import shipment and local materials working
closely with suppliers and customer to improve operations and reduce cost.
Make sure all the delivery process is handling/done as per client/site requirements and
managing all required equipment for offloading are available.
Checking all documents and prepare shipment for clearance and follow up exemption
process as per local laws
Negotiating contracts with suppliers to reduce costs and achieve maximum efficiency.
Ensuring the personal safety and safe working environment of staff accordingly to the HSE
plan.
MAIN CONTRACTOR:
Page 9 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 10 of 15
Attending Safety meeting with client to insure all the environmental issues being taking
care of.
Communicating needs & objectives to managers & key personnel in project.
Providing accurate routing information to ensure that delivery times are coordinated.
Accurately calculating total supply chain costs in relation to proposed new projects.
Obtaining quotes for transportation, delivery, manpower supplies & creating cost
comparisons.
Maintaining communication and control through all phases of the project.
Provides input into staff performance evaluations and objectives
Handling warehousing of material ( in case needed)
Taking care of green inactive process as per UAE regulation (Waste management and
Recycling)
Safety Engineer/Officer
6. EQUIPMENT
MAIN CONTRACTOR:
Page 10 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 11 of 15
Fish tape
Hammering Drill Machine
Jig saw machine
Cable jack
Cable roller
Crimping Tool
Megger Continuity Tester
Multi meter Torque wrench
Testing instruments
Earth‐Tester
Insulation
Stripping Tool
7. PROCEDURE
MAIN CONTRACTOR:
Page 11 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 12 of 15
7.2 Relocation
Locate and mark all the devices to be removed/shifted as per approved shop drawing.
Disconnect the device and store in clean and safe place.
Connect the loop with insulated butt connector.
Locate and mark the new location.
Proceed to Installation procedures.
No work shall execute without shop drawing, PQP, Method statement & Material
inspection approval.
Person in charge of the work shall ensure that works are executed as per the approved
Specification & approved methodology.
Person in-charge of the work shall ensure that, Quality procedures shall be followed
during work execution.
All relevant clearance shall be requested prior to start the activity.
Hold points as per approved inspection test plan offered for consultant/ client inspection.
Non-conformance work shall be avoided / controlled.
All documents & logs related to inspections shall be maintained & updated regularly.
Experienced supervisors, tradesmen and Labour shall be allocated to execute the works.
QA/QC activity is as per the construction Methodology.
8. ATTACHMENTS
MAIN CONTRACTOR:
Page 12 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 13 of 15
Appendix B: Checklist
MAIN CONTRACTOR:
Page 13 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 14 of 15
MAIN CONTRACTOR:
Page 14 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 15 of 15
Checklist
MAIN CONTRACTOR:
Page 15 of 15
PROJECT REF. No.
PROJECT NAME:
Ref. No. :
METHOD STATEMENT REV. No.
FOR
Date :
INSTALLATION OF XXXXXX
Page 16 of 15
Risk Assessment
MAIN CONTRACTOR:
Page 16 of 15