1.

Define proactive and reactive risk strategy


2. Name two cost estimation approaches.
3. Name four software quality assurance activities.
4. Explain the notations used for preparing a Data Flow diagram
5. Describe 4 P’s of management spectrum giving their significance.
6. Draw and explain Level 1 DFD for railway reservation system
7. With an example, explain Line of Code (LOC) based estimation
8. Describe RMMM Strategy.
9. Describe the Analytical method of project cost estimation with example.
10. Explain GANTT chart and its application for project tracking with an example
11. Sketch a use case diagram for library management system with minimum four use cases and
two actors.
12. Explain the concept of black box testing and white box testing.
13. Define data objects, attributes, relationship, and cardinality, with example of each.
14. Compare CMMI and ISO for software w.r.to i)scope ii)Approach Iii) ImplementationDifferentiate
between Software Quality Management and Software Quality Assurance (any two points).
15. Explain with example Decision table
16. State importance of “Function point “ and “lines of code” in concerned with project estimation.
17. Draw time chart for Libraray management system System (5 days a week). Consider broad
phases of SDLC.
18. Describe CMMI. Give significance of each level.
19. c) Use COCOMO model to calculate. i) Effort ii) Development Time iii) Average staff size iv)
Productivity if estimated size of project is 400 KLOC using embedded mode
20. State and describe any 4 basic principles of project scheduling.