Approaches to Estimating a Project Budget
01 02 03 04 05
Rate the Figure out the Analyze the data of Using data and Take the best,
individual total and then similar projects to project worst and
parts of the split it into task decide the cost variables to most likely
project and or milestones suggest the case estimates
then total total to do the
them up average
3
Creating a Project Budget
01 02 03 04 05
4
Cost Breakdown Structure
A hierarchical map of the cost of the project. The cost breakdown
structure works off a work breakdown structure (WBS) by determining
the cost of deliverables and task.
6
Benefits of using CBS
01 02 03
7
Typical Structure of a CBS
01 02 03 04 05