AERAULIC BALANCING
RECORD PROCEDURE
• Objective
- To insure having the correct airflow on each diffuser for supply and exhaust network
• Initial conditions
• Procedure
- Take the size and the velocity with a test hole in order to deduce the airflow
- Pitot Tuber
- Bolometer / Anemometer
• Acceptance criteria
RECORD EXECUTION
After
Design Data C/
Room name Grill / Test hole Balance Comments
(m3/h) NC
(m3/h)
4WD-101 1390
4WD-102 1390
4WD-103 1390
4WD-104 1390
4WD-105 1390
4WD-106 1390
4WD-107 1390
4WD-108 1390
160‐B-
4WD-109 1390
31002A
4WD-110 1390
4WD-111 1390
4WD-112 1390
4WD-113 1390
4WD-114 1390
4WD-115 1390
4WD-116 1390
4WD-117 1390
4WD-118 1390
4WD-119 1390
4WD-120 1390
4WD-121 1390
4WD-122 1390
4WD-123 1390
4WD-124 1390
4WD-125 1390
4WD-126 1390
4WD-127 1390
4WD-128 1390
4WD-129 1390
4WD-130 1390
4WD-131 1390
4WD-132 1390
4WD-133 1390
4WD-201 608
4WD-202 608
4WD-203 608
4WD-204 608
4WD-205 608
4WD-206 608
4WD-207 608
4WD-208 608
4WD-209 608
4WD-210 608
160‐B-31002B
4WD-211 608
4WD-212 608
4WD-213 608
4WD-214 608
4WD-215 608
4WD-216 608
4WD-217 608
4WD-218 608
4WD-219 608
4WD-220 608
4WD-221 608
4WD-222 608
4WD-223 608
4WD-224 608
4WD-225 608
4WD-226 608
4WD-227 608
4WD-228 608
4WD-229 608
TOTAL 63502
Comments :
HVAC CTR
CONTRACTOR
COMPANY
RECORD EXECUTION
After
Design Data C/
Room name Grill / Test hole Balance Comments
3
(m /h) NC
3
(m /h)
TOTAL 2257
Comments :
HVAC CTR
CONTRACTOR
COMPANY
RECORD EXECUTION
After
Design Data C/
Room name Grill / Test hole Balance Comments
(m3/h) NC
(m3/h)
160‐B-
GV5, GV6, GV7, GV8 46161
31002A
TOTAL
Comments :
HVAC CTR
CONTRACTOR
COMPANY
Appendix 3 – Room Temperature and Humidity Record Sheet
ROOM Tempertsure record
RECORD PROCEDURE
• Objective
-In order to obtain the acceptable working environment and indoor condition for each area
• Initial conditions
• Procedure
- Before starting test, all doors and side scuttles of air conditioning spaces and passage doors shall
be closed. Door louvers and natural ventilators shall be open.
- After preparation finishes, central unit fans shall be operated at rated power and the current and
voltage of fan motor shall be confirmed that they are same as those at ventilation test.
- Each damper for fresh air and return air shall be adjusted according to the design condition.
- Other machines affection room cooling in service condition shall be run as possible
- This test shall be conducted after the completion of the ventilation test.
RECORD EXECUTION
Comments :
DATE SIGN
NAME
HVAC CTR
CONTRACTOR
COMPANY
Appendix 4 – Motor Vibration Measurement Record Sheet
VIBRATION RECORD
RECORD PROCEDURE
• Objective
-In order to obtain the acceptable working environment and HVAC equipment condition for each
area
• Initial conditions
- HVAC AHU unit A or B shall be available and running condition as minimum 2 hours before
vibration measurement.
- HVAC ACCU unit A or B shall be available and running condition as minimum 2 hours before
vibration measurement.
• Procedure
- Before starting measurement of AHU motor vibration and ACCU compressor and fans, all
measurement point shall be clearly identified in order to get proper measurement values.
- In case of measurement point is not accessible, longer cable probes sensor shall be use for
measurement that having a safe distance from moving part.
- All other motor/ machines affection and creating source vibration on HVAC unit area shall be
stopped as possible
- This test shall be conducted if need inhibition signal due to permissive running system.
RECORD EXECUTION
Reference document:
Result (mm/s)
Equipment no. Test Requirement Comments
60 360 Design
<2.3mm/s
V
rms
D.E.
<2.3mm/s
H
rms
160-AHU-32001A
<2.3mm/s
V
rms
N.D. E
<2.3mm/s
H
rms
<2.3mm/s
V
rms
D.E.
<2.3mm/s
H
rms
160-AHU-32001B
<2.3mm/s
V
rms
N.D.E.
<2.3mm/s
H
rms
<4.5mm/s
V
rms
D.E.
<4.5mm/s
H
rms
160-ACU-32001A
<4.5mm/s
V
rms
N.D.E.
<4.5mm/s
H
rms
<4.5mm/s
V
rms
160-ACU-32001B D.E.
<4.5mm/s
H
rms
<4.5mm/s
V
rms
N.D.E.
<4.5mm/s
H
rms
Comments :
DATE SIGN
NAME
HVAC CTR
CONTRACTOR
COMPANY