You are on page 1of 10

Appendix 2 – Air Flow Record Sheet

AERAULIC BALANCING

RECORD PROCEDURE

• Objective

- To insure having the correct airflow on each diffuser for supply and exhaust network

• Initial conditions

- Running conditions are in normal

- Verifying that manual dampers are correctly positioned

• Procedure

- Take the size and the velocity with a test hole in order to deduce the airflow

- All checked airflow measurements must be written on the record sheet

• Equipment necessary for the record

- Pitot Tuber

- Bolometer / Anemometer

• Acceptance criteria

Refer to section 11 Acceptance Criteria of this Procedure


AERAULIC BALANCING _ SUPPLY AIR

RECORD EXECUTION

Reference document: TEP-1177734-C09-0003

Location: HVAC System - Main Substation (160-B-31002)

After
Design Data C/
Room name Grill / Test hole Balance Comments
(m3/h) NC
(m3/h)

4WD-101 1390

4WD-102 1390

4WD-103 1390

4WD-104 1390

4WD-105 1390

4WD-106 1390

4WD-107 1390

4WD-108 1390
160‐B-
4WD-109 1390
31002A
4WD-110 1390

4WD-111 1390

4WD-112 1390

4WD-113 1390

4WD-114 1390

4WD-115 1390

4WD-116 1390

4WD-117 1390

4WD-118 1390

4WD-119 1390

4WD-120 1390

4WD-121 1390

4WD-122 1390

4WD-123 1390
4WD-124 1390

4WD-125 1390

4WD-126 1390

4WD-127 1390

4WD-128 1390

4WD-129 1390

4WD-130 1390

4WD-131 1390

4WD-132 1390

4WD-133 1390

4WD-201 608

4WD-202 608

4WD-203 608

4WD-204 608

4WD-205 608

4WD-206 608

4WD-207 608

4WD-208 608

4WD-209 608

4WD-210 608
160‐B-31002B
4WD-211 608

4WD-212 608

4WD-213 608

4WD-214 608

4WD-215 608

4WD-216 608

4WD-217 608

4WD-218 608

4WD-219 608

4WD-220 608
4WD-221 608

4WD-222 608

4WD-223 608

4WD-224 608

4WD-225 608

4WD-226 608

4WD-227 608

4WD-228 608

4WD-229 608

TOTAL 63502

Comments :

NAME DATE SIGN

HVAC CTR

CONTRACTOR

COMPANY

AERAULIC BALANCING _ FRESH AIR

RECORD EXECUTION

Reference document: TEP-1177734-C09-0003

Location: HVAC System - Main Substation (160-B-31002)

After
Design Data C/
Room name Grill / Test hole Balance Comments
3
(m /h) NC
3
(m /h)

Fresh Air WL003 2257

TOTAL 2257
Comments :

NAME DATE SIGN

HVAC CTR

CONTRACTOR

COMPANY

AERAULIC BALANCING _ RETURN AIR

RECORD EXECUTION

Reference document: TEP-1177734-C09-0003

Location: HVAC System - Main Substation (160-B-31002)

After
Design Data C/
Room name Grill / Test hole Balance Comments
(m3/h) NC
(m3/h)

160‐B-
GV5, GV6, GV7, GV8 46161
31002A

160‐B-31002B GV9,GV10,GV11,GV12 16516

Press. Relief WL001 1152


damper WL002 1089

TOTAL

Comments :

NAME DATE SIGN

HVAC CTR

CONTRACTOR

COMPANY
Appendix 3 – Room Temperature and Humidity Record Sheet
ROOM Tempertsure record

RECORD PROCEDURE

• Objective

-In order to obtain the acceptable working environment and indoor condition for each area

• Initial conditions

- Air inlet and outlet shall be available and not obstructed.

- Tested electrical cabinet shall be powered on.

- All dampers shall be opened.

• Procedure

- Before starting test, all doors and side scuttles of air conditioning spaces and passage doors shall
be closed. Door louvers and natural ventilators shall be open.

- After preparation finishes, central unit fans shall be operated at rated power and the current and
voltage of fan motor shall be confirmed that they are same as those at ventilation test.

- Each damper for fresh air and return air shall be adjusted according to the design condition.

- Other machines affection room cooling in service condition shall be run as possible

- This test shall be conducted after the completion of the ventilation test.

• Equipment necessary for the record

- Digital Temp. Hygrometer


ROOM TEMPERATURE AND HUMIDITY RECORD

RECORD EXECUTION

Reference document: TEP-1177734-C0-0005

Location: HVAC System - Main Substation (160-B-31002)

Design Actual Design Actual C / NC


Room No. Room Name Comments
Temp. °C Humidity RH%

160‐B- Electrical Equipment


24ºC ± 2 55±20
31002A Room

160‐B- Electrical Equipment


24ºC ± 2 55±20
31002B Room

Comments :

DATE SIGN
NAME

HVAC CTR

CONTRACTOR

COMPANY
Appendix 4 – Motor Vibration Measurement Record Sheet
VIBRATION RECORD

RECORD PROCEDURE

• Objective

-In order to obtain the acceptable working environment and HVAC equipment condition for each
area

• Initial conditions

- HVAC AHU unit A or B shall be available and running condition as minimum 2 hours before
vibration measurement.

- HVAC ACCU unit A or B shall be available and running condition as minimum 2 hours before
vibration measurement.

• Procedure

- Before starting measurement of AHU motor vibration and ACCU compressor and fans, all
measurement point shall be clearly identified in order to get proper measurement values.

- In case of measurement point is not accessible, longer cable probes sensor shall be use for
measurement that having a safe distance from moving part.

- All other motor/ machines affection and creating source vibration on HVAC unit area shall be
stopped as possible

- This test shall be conducted if need inhibition signal due to permissive running system.

• Equipment necessary for the record

- Digital vibration analyzer with wire probes.


VIBRATION RECORD

RECORD EXECUTION

Reference document:

Location: HVAC System - Train-3 Substation (093-B-31005)

Result (mm/s)
Equipment no. Test Requirement Comments
60 360 Design

<2.3mm/s
V
rms
D.E.
<2.3mm/s
H
rms
160-AHU-32001A
<2.3mm/s
V
rms
N.D. E
<2.3mm/s
H
rms

<2.3mm/s
V
rms
D.E.
<2.3mm/s
H
rms
160-AHU-32001B
<2.3mm/s
V
rms
N.D.E.
<2.3mm/s
H
rms

<4.5mm/s
V
rms
D.E.
<4.5mm/s
H
rms
160-ACU-32001A
<4.5mm/s
V
rms
N.D.E.
<4.5mm/s
H
rms

<4.5mm/s
V
rms
160-ACU-32001B D.E.
<4.5mm/s
H
rms
<4.5mm/s
V
rms
N.D.E.
<4.5mm/s
H
rms

Comments :

DATE SIGN
NAME

HVAC CTR

CONTRACTOR

COMPANY