ELECTRICAL MAINTENANCE DEPARTMENT

VRM Preventive Maintenance Action Plan for December 26, 2023

SN. Main Activities Man power Remark

1 6KV motors and Panels

1.1 321RM03M01 main motor, carbon brush & LRS cleaning,tightening and checking

321FN11 circulation fan main motor, carbon brush & LRS cleaning,tightening and
1.2
checking
1.3 321FN11 circulation fan main motor LRS limit switch replacement Mr Zhange , Biyame
Abebe Yonatan
2 VRM main motor, gearbox Oil stations & Circulation fan oil station Getachew
Mohammed Adem
VRM main motor oil station motors & control panel checking,tightening and Abebe
2.1
cleaning
VRM gearbox oil station motors & control panel checking,tightening and
2.2
cleaning
circulation fan & motor oil station motors & control panel checking,tightening
2.3
and cleaning
3 311WF07,08 & 09 weight feeders
Mohammed Abdu
3.1 311WF07,09,11 & 13 motors & panels cleaning, tightening and checking Awel Kedir

4 VRM Air slide motors


4.1 All air slide motors terminal Checking,Cleaning and tightening
4.2 321FN18 air slide motor relacement
Abush Tesema
5 VRM sealing fan and separator motor
Mehadi Yakume
5.1 VRM sealing fan motor terminal cleaning

5.2 VRM separator motor terminal cleaning and checking


6 VRM reject & homo silo elevator motor
6.1 VRM reject elevator motor terminal cleaning Yonatan Getachew
BINYAM ABEBE
6.2 homo silo elevator motor terminal cleaning
7 Belt conveyor 311BC10 and 321BC07
7.1 Belt conveyor 311BC10 motor terminal and drawer cleaning
7.2 Belt conveyor 321BC07 motor terminal and drawer cleaning
Miliyard Abebaw
8 Limestone and clay reclaimer
Mohammed Abdu
8.1 Limestone and clay reclaimer motors and panel cleaning and tightning Awel Kedir

8.2 Limestone reclaimer scraper motor contator replacement