You are on page 1of 27

STEAM GENERATOR

USER MANUAL
CONTENTS
Parameters……………………………………………………………………….2
Generator Location...........................................................................5
Power Connection............................................................................7
Water Feed.......................................................................................11
Steam Oulet.....................................................................................12
Drain Line.........................................................................................13
Auto Flush........................................................................................14
Express Steam..................................................................................16
isteam...............................................................................................17
isteam...............................................................................................18
I tempo.............................................................................................19
Remote Temperature Sensor.............................................................20
Remote Temperature Probe..............................................................22
Essential Oil Use................................................................................26
Shower Seat Installation………………………………………………………………….27

2
Models, parameters and dimension
Table 1

Heating
Power elements Voltage(V)/Curre dimension
Model KW (N*kW) nt (A) (L×W×H)(in)
ST-30 3 1*3.5 220/13.6 11.8*5.1*9.1
ST-40 4 1*4.0 220/18.2
220/20.5
ST-45 4.5 1*4.5 380/6.8 12.6*5.1*13.21
220/22.7
ST-50 5 1*5.0 380/9.1
220/27.3
15.6*5.9*15.6
ST-60 6 1*6.0 380/9.1
ST-70 7 1*7.0 220/31.8
ST-80 8 1*8.0 220/36.4 17.5*6.5*15.6
ST-90 9 1*9.0 380/13.6
ST-105 10.5 1*5=1*4.5 380/15.9
ST-120 12 2*6 380/18.2
ST-150 15 1*6+1*9 380/22.7
ST-180 18 2*9 380/27.3 19.7×7.9×20.5

2.the basic parameters of controllers and the size in

table 2
Model time Range of Size(length*width*height)(mm)
(minute) temperature
ST-135 1~60 25℃~55℃ 100×100×40
ST-135M 1~60 25℃~55℃ 132×82×26
ST-135AD 1~60 25℃~55℃ 160×100×20

3
Locating the Stcmoet Generator
Select a location as near as practical to the steam room. Typical locations
include: closet, vanity cabinet, climate controlled attic or basement.

1. Locate steam bath generator within 60 feet of steam room.


Note: The standard length of the cable for connecting the control to the steam
generator is 30 feet. The steam generator
and control must be located accordingly. A 16 foot cable is standard. Contact
Stcmoet to purchase an optional 60 ft.
cable (PN 103990-60) for I Tempo controls. A 30 foot cable is available for use
with I Steam controls.

2. DO NOT install steam bath generator inside steam room.

3. DO NOT install steam bath generator outdoors or wherever


environmental conditions may affect the safety and/or
performance of the generator.

4. DO NOT install steam bath generator or plumbing lines in


unheated attic or any locations where water could freeze.

5. DO NOT install steam bath generator near flammable or


corrosive materials or chemicals such as gasoline, paint thinners,
or the like. Installation in areas having high concentrations of
chlorine (such as pool equipment room) must be avoided.

6. Install steam bath generator on a solid and level surface.


Keyhole slots are provided for wall mounting. Insure the
steam generator is properly secured and level when
mounting with keyhole slots

4
7. Install steam bath generator in an upright position only.

8. Install a Pressure Reducing Valve to limit supply to 15-20 PSIG.

9. Provide a minimum of (12) inches at both ends and top of the steam
generator or as required for servicing.

For Illustrative purposes only. Consult with qualified designer,


architect or contractor for steam room construction details.

5
Field Power Supply Connection

L1, L2, Ground to be field wired


Please refer to the wiring
diagram in the Stcmoet
Installation Manual for
complete wiring information.
_________________________________
TO AVOID EQUIPMENT DAMAGE
DO NOT CONNECT POWER SUPPLY
DIRECTLY TO ELEMENTS!!!
________________________________
NOTE: For illustrative purposes only.
Consult with qualified licensed electrician for electrical installation

6
7
SELECTING THE PROPER STEAM GENERATOR:
Voltage Power line Fuse or
Model power Room size V/current A size breaker
kW ft3 mm2 A
ST-30 3 70~105 220/13.6 3×4 25
ST-40 4 105~140 220/18.2 3×4 25
ST-45 4.5 110~175 220/20.5 3×4 32
ST-45 4.5 110~175 380/6.8 5×2.5 16
ST-50 5 140~192 220/22.7 3×4 32
ST-50 5 140~192 380/9.1 5×2.5 16
ST-60 6 175~210 220/27.3 3×4 40
ST-60 6 175~210 380/9.1 5×2.5 16
ST-70 7 195~245 220/31.8 3×6 40
ST-80 8 245~315 220/36.4 3×6 60
ST-90 9 315~350 380/13.6 5×4 25

8
ST-105 10.5 315~420 380/15.9 5×4 25
ST-120 12 360~455 380/18.2 5×4 25
ST-150 15 420~560 380/22.7 5×4 32
ST-180 18 560~735 380/27.3 5×4 40

Installation Manual for


complete wiring information

Steam generator power supply installation:


1.Confirm the correct supply voltage, shown in the label), and please
refer to the label on the equipment or the information in Table 1 in the
manual.
2. Requirements of circuit breaker installation in the circuit: the circuit
breaker installation must be strictly in accordance with Table and the
equipment must be grounded securely. Install CFI (International
Electrotechnical Regulations article 210-8).

9
Water Feed
1. Connect cold water line.
2. Provide a shut off valve in the water supply line upstream
of the steam bath generator.
3. Do not overheat inlet solenoid valve with solder connec-
tions. Overheating will damage parts.
4. Flush inlet water line thoroughly before making connection to unit.
5. Strainer recommended upstream of feed water connection psig。
6. For best performance water pressure should be 15 to 20
PSIG. Reduce pressure as required if necessary required.
7. As required by local codes, install an approved backflow preventer.
8. Do not use PEX or PVC tubing Aluminum-plastic tube

For Illustrative purposes only. Consult with qualified designer,


architect or contractor for steam room construction details.

10
Steam Outlet Pipe
Steam Outlet ( 1 ⁄ 2 ” NPT)
1. Do not install any valve in steam line. Flow of steam must
be unobstructed.
2. Use 1 ⁄ 2” brass pipe or copperorSUS304 tubing from unit to
steam head as permitted by codes.
3. Insulate steam line using pipe insulation rated 250˚ F or higher.
4. Pitch steam line 1 ⁄ 4 ” per foot towards steam head or steam
generator to avoid valleys and trapping of condensation.
NOTE: Running the steam line down and then up will create
a steam trap blocking the flow of steam.

NOTE: A 1.5” hole in the steam room is required to mount


the steam head.

For Illustrative purposes only. Consult with qualified designer,


architect or contractor for steam room construction de

11
Manual Drain Line
Drain ( 1 ⁄ 2 ” NPT)
NOTE: A drain valve is provided to facilitate servicing.
Provide a drain line connection from steam bath
generator drain valve according to national
and local codes. Check local plumbing code for
Unit drains by gravity.
Manual Drain Valve
(Shown in open position
Pitch as required for
Gravity Drain

For Illustrative purposes only. Consult with qualified designer,


architect or contractor for steam room construction details.

12
Optional Auto Flush
Optional Auto Flush

13
Operation
The optional AutoFlush System feature automatically drains the
Stcmoet system following each use. A time delay allows the water
to cool down (about two hours) before it drains by gravity for a safe
and gentle operation.
NOTE: If the Express Steam option has been installed, the
AutoFlush will drain for ten minutes then refill with fresh water
to begin the pre-heat cycle
Installation Instructions
1. Plumbing to be performed by a qualified plumber and shall
be in accordance with applicable national and local codes. Unit
drains
by gravity. A drain line that is lower than the
Auto Flush assembly must be available. The Auto Flush System
valve outlet is 1 ⁄ 2 ” NPT. Check plumbing code for
receptor, trap and vent requirements.
2. Use copper or brass nipple 1 ⁄ 2 ” NPT x 3 1 ⁄ 2 ” or longer
(not supplied) to connect Auto Flush valve to the
Drain Valve. An arrow on the bottom of the Auto Flush
indicates the direction of flow.

CAUTION
PROVIDE DRAIN PLUMBING ACCORDING TO LOCAL
CODES. PLUMB AS REQUIRED FOR AUTOFLUSH SYSTEM.

14
Installing the I Steam Control

ST-135 ST-135AD ST-135M


MPORTANT: Turn power to the steam
generator OFF before installing the control.
Failure to turn the power OFF will result in an
inoperable control.

Controller selection
Installing the ST-135 or ST-135AD or ST-135M Control
Install the iSteam Control according to the installation and operation instructions
supplied with the Control. Failure to do so may result in an inoperative control
and a hazardous condition
ST-135 Controls
Refer to the Stcmoet
Installing the i Steam Control
1. Add a bead of silicone to the back of the I Steam housing. Plug the
I ST-135 into the audio pigtail on the back of the I Steam
control (6 pin mini-DIN). If an Audio Wizard is installed, the Audio
Wizard will plug into the I ST-135. (Diagram 2).
2. Carefully guide cables within the wall housing, then place I Steam
control into final position (Diagram 2

15
Diagram 1 Diagram 2 Diagram 3

1. Firmly connect the connector to the control. Turn on


power to the steam generator and test the control
to verify correct connections. Test per instructions.
Proceed with installation and verification of proper
control function.
2. Remove and discard peel-off paper to expose adhe-
sive liner.

3. Insure the mounting surface is clean and dry as


required for good adhesion. Apply silicone into
the hole in the wall as required to create a
moisture seal. Hold the control with the LED
display in the 12 o’clock position and press the
control against the wall until the adhesive sticks
and holds firmly as shown above.

CAUTION
Do not force or twist cable ends together.
Forcing or twisting cable ends may damage
the connectors

16
CAUTION
Do not force or twist cable ends together.
Forcing or twisting cable ends may damage
the connectors

17
CAUTION
Do not force or twist cable ends together.
Forcing or twisting cable ends may damage
the connectors

1. Firmly connect the connector to the control. Turn on


power to the steam generator and test the control
to verify correct connections. Test per instructions.
Proceed with installation and verification of proper
control function.

2. Remove and discard peel-off paper to expose adhe-


sive liner.

3. Insure the mounting surface is clean and dry as


required for good adhesion. Apply silicone into
the hole in the wall as required to create a
moisture seal. Hold the control with the LED
display in the 12 o’clock position and press the
control against the wall until the adhesive sticks
and holds firmly as shown above.

ST-135AD temperature controller operation instructions:


1. Display screen: displaying time and temperature of the steam
generator in operation;
2.Headlamp: used for the lighting in the steam room. The output is
220V and the maximum is 100W.

18
3. On/ Off key:light touching this key to start the equipment which
produces steam in a few minutes and then press this key to stop
the equipment. The working time set inside the equipment is 60
minutes and it will automatically shut down if over the time set;
4. Time / temperature setting key: After start-up, press the
temperature setting key to set the temperature and then press
the plus or minus key to adjust the temperature value. Then the
screen will display the set temperature value soon and press the
temperature setting key or waiting for 15 seconds to exit the
temperature setting status after the adjustment of the
temperature. The steam generator temperature shall be set in
the range between 25 ℃ ~ 55 ℃;
5. Number plus or minus key: increase and reduce the temperature.

19
Locating Controls Outside the Steam Room
by Using Remote Temperature Sensor

Installing a Remote Temperature Probe


The Remote Temperature Probe is required when a steam control is
installed outside the steam room.。

1. The probe must be installed:


a. On a vertical surface.
b. 4-5’ above the floor.
Locate the probe in a location representative of the desired
steambathing temperatures. Do not locate the probe above or near
the steam head or direct steam emissions. The probe has an integral
16ft. cable. Ensure that the probe and iSteam control are located
accordingly.
20
2. Drill a 1/4” hole in the wall. Do not oversize or undersize the
hole. Clean area thoroughly.
3. Route the end of the temperature probe cable with the
temperature probe through the wall into the steam room as shown
IMPORTANT NOTE: Do not strain, staple, pinch or otherwise
damage the probe cable.
4. With a minimal length of the cable exposed apply silicone
(provided) to the hole in the wall as required to create a moisture
seal as shown.
5. Push the I ATC cable and probe into the hole as required
to leave between 1/4”- 1/2” of the probe. Exposed as shown
6. Insure a minimum of 1/4” of the probe is exposed to the air.
Failure to do so may result in an inoperative control and a
hazardous condition. The exposed area of the probe must be free of
silicone or any materials that prevent direct exposure to the steam
room air. Failure to do so may interfere with the ability to sense
temperature and may result in excessive steam room temperatures

21
Connecting the Control Cable
to the Steam Generator
Route the control cable (provided with the control)
from the wall cutout to the steam generator.

IMPORTANT: Do not strain, staple, pinch or otherwise


damage the control cable. Route cable as required to
permit replacement
Note: The standard length of the cable for connecting the
control to the steam generator is 30 feet.
The steam generator and control must be located
accordingly. A 30’ cable is standard. Contact DIOU SAUNA
to purchase an optional 60’ cable (PN 103990-60) for
iTempo controls.
A 60’ cable is available for use with iSteam controls

Arom asteam steam head


22
The Acrylic Shield is to be used when acrylic or other
non-heat resistant materials are used for the steamroom
enclosure .
Using Essential Oils with the
Steamhead

Enjoy essential oils by placing a drop or two into your


steamhead as shown in the illustration.

steamhead
CAUTION: Use essential oils with caution. Essential oils are for
external use
only. Keep out of reach of children. Essential oils are highly
concentrated and
are potent substances and should not be applied directly to the
skin as they can
be irritants. Use essential oils with caution.

23
CAUTION: Place the drops into the Atcsteam AromaSteam
steamhead well
prior to turning on the steambath. Do not place drops in a hot
steam head as
SERIOUS INJURY CAN RESULT IF YOU DO NOT FOLLOW THIS
WARNING

CAUTION: Start with one drop to gauge strength and suitability.


Limit to a maximum of a few drops during a steambathing session.

CAUTION: Some people may find that the aroma makes them dizzy
and the user should exit the steam bath IMMEDIATELY. If skin
irritation
occurs, stop using the oils immediately. Remove any excess oil by
washing in mild soap and water. If ingested, rinse mouth with
water.
Administer water or milk to dilute. Contact a physician
immediately.

CAUTION: Essential oils and/or aromatherapy can cause


inflammation,
burns, headache, nausea and allergic reactions. Consult a physician
before
using aromatherapy

Close containers, tightly, when storing oils. Keep away from


sources of ignition.
Shower Seat

24
Teak wood seat drops for use and folds for storage.
Dimensions are: 19 5 ⁄ 8 ” w x 12 5 ⁄ 8 ” d x 1 1 ⁄ 4 ”

size:19 5⁄8“x 12 5 8⁄D x 1 1⁄4


Max 250 lbs. rated

Polished Chrome bracket


Wall Brackets
Note correct orientation as shown

#12, 3 inch long flat head screw


Wall Bracket Cover

Hinge Pin
Caps
Seat Assembly

25
Completed Assembly
Shown in seating position

26
Thank you for choosing Atcsteam series steam generator with
well-designed structure, steady performance and convenient
installation. To form the whole set of steam bathing equipment,
you need a personal steam bathing room as well. The Stcmoet
steam generator is designed to remove tiredness, relax muscles an
stimulate circulation of the customers.
For proper installation, operation and maintenance, and the safety
of customer as well, please read all instructions carefully and keep
this manual for further reference.

27

You might also like