You are on page 1of 183

Prepared by

M.Ganesh Murugan
9715447621
The QC circle was
formally organized in
Japan in 1962 by
Japanese Union of
Scientists and Engineers
(JUSE) and the man who
initiated the idea is
Dr.Kaoru Ishikawa
 The organization gets the total man
 Humanize the work i.e. Quality of work life is
stressed and improved
 Brings out extra-ordinary qualities from ordinary
people
 To display the human capabilities fully and eventually
draw out infinite possibilities
 Prepares the employer and employees to meet the
challenges of the changing time and conditions
 Ensure harmony
 Effective team work
 Job satisfaction
 Problem solving capacity
 Communication
 Self development
 Leadership development
 Safety awareness and housekeeping
 Productivity
 Team building
 Participation
 Self-discipline
 Not just for only quality problems
 Not a forum for grievances
 Not a spring-board for demands
 Not a tool for management to unload problems
 Not problem-focussed, but performance-oriented
 Not for changing the existing organisational structure
or chain of command
 Not a “cure all” or “sure cure” technique
 Not a panacea for all ills
 One of the prime objectives of QC is to improve the
quality of work life and environment
 The survival and prosperity of any enterprise depends
on the bottom line of the balance sheet i.E.
 Net profit/economic viability and stability. A higher level of
quality will result in satisfied customer, repeat business,
which in turn will improve the profitability, job security and
overall harmony of enterprise.
 Hence, the emphasis on “quality”
 Everybody participates and contributes in the process
of decision-making
 Problems are chosen, not given
 Decision by consensus, not by majority
 Performance-oriented, not problem-oriented
 Bottom-up approach
 Management-blessed, not management-directed
 Members are responsible from the identification of a
problem to implementation of the solution i.E. For
total performance
 Aims at the quality of work life
 Does not replace or substitute any of the systems or
structure
 Problem identification emanates from
 The members of the circle
 Management
 Staff or technical experts

 Several problems are identified and the selection of


the problem is the prerogative of the circle
 Problem analysis and discuss alternatives
 Data from specialist, if necessary
 Arrive at best solution
 Circle members discuss various alternatives also before
reaching the best solution
 Management presentation
 The circle makes its recommendations directly to its in-
charge using a powerful communication
 Review of recommendations and approval by
management
 Thoroughly in consultation and coordination with peripheral
departments and approves or disapproves
 Implementation
 Approved recommendations are implemented.
Recommendations that are not approved are
 Communicated to the circle members. It is imperative to
explain the reasons to the members of the circle for not
approving their recommendations. Communication should
be effective in either case
 From the familiarity of the members as well as
leaders with the operation in which they are involved
 In day-to-day work
 From the proposals or suggestions by clients
 From the suggestions by the HOD’s
 From the suggestions or proposals by any employee in
the organisation
 From the objectives set out in the company’s annual
plan/target
However, it is the prerogative of the circle to select the
problem although the suggestions can emanate from
various sources
 Positive attitude
 Frank discussions and brainstorming with everyone
participating in a cooperative manner
 QC should exercise a systematic approach
 Confirms the existence of the problem
 Understands the nature of the problem
 Identifies the symptoms
 Finds out the causes
 Prepares a systematic programs for study
 Checks those programs with the other members
 Delegates assignment to members
 Seeks advice and assistance if required from outside
agencies
 Finds out the various possibilities
 Uses the relevant techniques that are learnt for problem-
solving
 Prepares a report of its proposal once it arrives at a
solution
 Evaluates the relevance and practicability of the solution
 Recommends the solution
 Implements the solution
 1.Meeting
 A QC meeting must be the focal point of all activities
 The meeting time should be such that it is convenient and
acceptable for all members
 2.Subject (themes)
 The subject chosen should be in consonance with the
policies of management
 A subject which is familiar and of common concern to all
the members of the circle should be handled first
 Only work related problem should be chosen
 A problem whose solution is within the capability of the
members of QC should be selected
 The subject should be so chosen for the impact of its
solution
 As a rule, a problem should be selected which can be
solved within reasonable period of time
 3.Managing the activities
 Give opportunities for simple and brief presentation for
those members who are not used to speaking
 Before others
 Familiarize all the members with the environment gradually
 Utilize every opportunity of praise
 Suggest better ways of doing things after appreciating their
efforts
 What is salt to food is humor to effective discussion without
tension. A sense of humor is a necessary ingredient but
strict discipline should prevail
 Circle members should display their respective role by
earmarking their responsibility
 Use simple techniques effectively and thoroughly
 A problem must be selected and solved only if the members
can assure themselves that it will not reoccur
 People must be sufficiently motivated even to the point of
becoming greedy in getting the most out of activities
 4.Education of QC members
 QC members must make it a habit to study
 Read text books as many times as possible and make the
best use of them
 Develop the habit of getting as much data as possible from
as many sources as possible and utilize them to the
maximum extent
 Knowledge is not sufficient, but the application of
knowledge is more important
 What is digestion to food is contemplation to knowledge.
Hence applying the knowledge that is acquired in solving
the problem is key to the success of circle
 Apply the techniques in such a simple manner that
everyone can understand
 5.Key factors for the success of QC activities
 Make a master plan and divide into elements
 Study, discuss and solve the problem with the co-operation
of all the members so that their commitment is assured for
the implementation
 Constantly review the progress and the status of the
solution
 6.How is a QC program organized?
 A qc program is an integrated system made up of several
components –
 The members
 The leader
 The facilitator
 The executive committee

The facilitator takes direction from the executive committee and


co-ordinates the activities of the circle meeting and the leader
conducts the meeting in such a way that the members of the
circle participate
 7.How to ensure longevity of QC activities?
The following essential ingredients are imperative
 7.1.To be problem conscious
 The leader, who is normally the group head/shift head
should understand the role and function of
 Leading the sub-ordinates. They should continuously and
constantly learn about the technique.
 Support from top and middle management is essential to
make qc self-motivating
 Peripheral departments also must give their blessings for
the continued effort of QC activities. Participation by
everyone should not only be encouraged but ensured
 7.2.To enhance people’s awareness in 3 areas
 Quality (quality of entire working life)
 Problem
 Improvement

People must be quality conscious in order to promote


QC activities. Once people become problem
conscious, improvement is bound to follow
 7.3.Ensuring voluntary participation
 People get real satisfaction when they are totally
committed to think and act on their own
 For the overall prosperity. If one understands why the
activities should be carried out voluntarily, the
commitment is bound to follow
 7.4.To find pleasure and sense of satisfaction in the
QC activities
There are ten kinds of happiness in QC activities
 Happiness of developing self-confidence
 Happiness of being recognized for one’s activities
 Happiness of displaying one’s ability and capability
 Happiness of acquiring the ability to identify one’s
capability
 Happiness to develop and enrich one’s potential ability
 Happiness to be able to recognize one’s potential ability
 Happiness to understand and co-operate with the members
of the circle
 Happiness to have friends and affectionate sub-ordinates
 Happiness to belong to a company where the QC activities
are encouraged and promoted
 Happiness of gaining indirect material reward through the
prosperity and growth of the company
 7.5.Training
 Training and re-training from the top management to the
circle member is an indispensable and inevitable part of
ensuring longevity of circles
 The members must also be taught value engineering, job
instruction, job method, job relations, creativity
development and leadership qualities
 7.6.How often the circle meetings are held?
 As a rule of the thumb, circle meetings are held once in a
week
 However, some companies have introduced variations
 It is desirable to reduce the duration and increase the
frequency of the meeting.

Format enclosed
Format enclosed
 The QC circle is program is an integrated system
consisting of the following
 Steering committee
 Divisional review committee
 Coordinators and facilitators
 Circle leader
 Circle members
 Steering committee
 This committee comprises of the executive director,
general managers and a member secretary (nominated by
management). This committee sets goals and objectives for
the QCC activities and establishes operational guidelines
 It meets as often as necessary but at least once a quarter
to review the progress. The secretary is responsible for the
overall coordination of QC circle activity in the company
 Divisional review committee
 This committee comprises of the divisional head,
departmental heads, coordinators and facilitators(member
secretary). It provides active support to the circles
 The committee meets as often as necessary but at least
once a month to review the progress
 Coordinators
 Organizes training programs for members as and when new
circles are formed
 Convenes the steering committee meeting regularly once in
two to three months and maintains the minutes thereof.
 Organizes top management presentations regularly once in
two to three months
 Centrally registers circles as and when formed and also
maintains records of number of members, frequency of
management representations, etc.
 Co-ordinates and evolves a consensus for norms to asses the
performance of different quality circles and of different
divisions
 Co-ordinates and ensures availability of common facilities
to all quality circles
 Prepares a budget for the functioning of quality circles and
submits the same to the steering committee for adoption
 Facilitators
 Is responsible for the successful operation of the quality
circles in his area. He has to be a guide, counselor, teacher
and a catalyst
 Ensures necessary facilities for quality circles to operate
effectively lends assistance and support to the leader
whenever required and also helps in the training of
members
 Is invited to the meetings of the departmental or steering
committees wherein he gives a resume of the activities of
quality circles in his jurisdiction
 Circle leader/deputy leader
 Makes the necessary facilities available, with the help of
facilitators and others, for enabling quality circles to
perform without constraints
 Assigns tasks to different member from time to time to
maintain a high degree of individual involvement and
participation
 Trains the members in various problem-solving techniques
and other facets of quality circle operations, and gives
them necessary guidance whenever required, with the help
of the facilitator and others, if necessary
 Maintains a high degree of cohesiveness of his team. He
does not act as a boss in quality circle activities but as a
friend and partner so that conflicts are avoided and group
cohesiveness is maintained all the time
 Ensures that every circle member is involved in circle
activity and a high level of enthusiasm and involvement is
maintained
 Plans the agenda of meetings carefully and conduct
meetings regularly and effectively
 Ensures discipline and decorum during the meetings
 Chalks out action plans for a progressive solution of
problems through data collection, interaction and sets time
bound programs for implementation of the circle’s
recommendations
 Encourages and evolves consensus decision-making
processes so that win-lose situations are obviated
 Ensures that record-notes of meetings and progress of
problems are maintained in two separate registers regularly
and effectively
 Interfaces with other levels of management, the facilitator
and different functional agencies to ensure the effective
working of his quality circle
 Takes necessary steps continuously in conjunction with
other members, facilitators, executives and the
department head to ensure that his quality circle maintains
a high degree of morale and enthusiasm continuously and
thereby catalyses the quality circle movement in the
organization to grow steadily and healthily
 Organizes presentations to departmental head and top
management at least once in two to three months
 Feeds the information relating to the highlights of his circle
activities to the agency concerned for publication in
appropriate newsletters and journals
 Circle members
 Participate actively in the discussions during the meeting
and all other activities of the circle. They willingly execute
specific assignments that may be given to them as decided
in the circle meetings. Thus they actively assist
leader/deputy leader in effectively and efficiently
conducting the circle activities
 Contribute towards building of a cohesive group through
which they try to achieve the highest standards of
performance
 Take part in management presentation
 Through their personal conduct and enthusiasm, help in
propagating the quality circles concept in other areas
where circles are yet to be launched
 Assimilate the inputs given to them during training and
develop in themselves the capability for systematically
identifying analyzing and resolving problems and also attain
leadership qualities
 Check sheet
 Stratification
 Pareto chart
 Cause and effect diagram
 Histogram
 Scatter diagram
 Graph and control chart
 A scientific approach of solving problems and making
workplace improvements
 Helps individuals/teams of diagnose, solve and
prevent problems
 Can be used to solve 90% of workplace problems
 Simple yet powerful histogram
 Check sheet is a systematic method of collecting,
recording and presenting the relevant data in a
simple manner Helps individuals/teams of diagnose,
solve and prevent problems
 Rationale and Benefits
 To make data gathering simple, systematic, easy and
effective
 To arrange and present data in such a way that it can be
understood and used easily
 Enables “management by facts” as opposed to
“management by opinion”
 Process performance check sheet
 Defect item check sheet
 Defect location check sheet
 Defect cause check sheet
 Task conformation check sheet
 Establish what information is needed
 Establish “operational definition” for the data to be
collected
 Determine 5W and 2H of check sheet
 Construct the check sheet
 Test the check sheet
 Use the check sheet
 Use the information (remember three rules of QC)
 Why is the data needed?
 What type of check sheet should be used?
 Where should the data should be collected from?
(Plant/machine/place)
 Who has to collect the data?
(Operator/ supervisor/manager)
 When will the data be collected?
(Every hour/ at the time of receipt)
 How should the data should be measured?
(Instrument/clock)
 How much data is essential?
 Check sheet should broadly have three types of
information
 Title of the check sheet
 Source information
 Name of the project/ problem theme
 Location of data collection
 Date and/or time
 Name of the person recording data

 Content information
 Column with defect/event name
 Column to record frequency
 Column to record total
 Test the check sheet with at least three different
collectors
 Check if the operational definition is really
“operational”
 Reconfirm that the columns are relevant and required
 Check if the check sheet is easy to record and use
 Make changes based on the feedback
 Explain the check sheet to the data collector
 Ensure that the data collector understands the reason
for which the data is being collected
 Collect data
 Standardize its use to assure consistency
 Tally mark =5
 Pay particular attention to irregular data and
irregular conditions
 Use data from the check sheet for further analysis
- Pareto chart, histogram, scatter diagram
 Ensure that all the data that is recorded is put to use
OR is likely to be put in future
 Regularly audit the use and the usefulness of check
sheet
 Goals are too vague
 No agreed operational definition
 Data is not collected on time
 Too much time and effort being spent on recording in
the check sheet
 Check sheet is too complex
 Different people are using different check sheet for
the same issue
Project Name:
Name of Data Recorder:
Location:
Data Collection Dates:

Dates
Defect Types/
Event Occurrence Sunday Monday Tuesday Wednesday Thursday Friday Saturday TOTAL

Defect 1

Defect 2

Defect 3

Defect 4

Defect 5

Defect 6

Defect 7

Defect 8

Defect 9

Defect 10

TOTAL
 check-sheet-histogram.xls
 A technique used to divide the data into sub-
categories or classification to provide useful insight
into the problem
 Root word is “strata” which means
 Group
 Division
 Sub-class
 Levels
 Layers
Stratification is an act of dividing the data based on
groups, division, sub-class, causes etc.
 Data comes from different sources. e.g: different
machines, instruments, cities, operators etc.
 Data sometimes masks real information.
 Stratification helps in getting meaningful information
from data.
 Divide the data and conquer the information
 List all conditions

 Collect and stratify data

 Interpret the data


List all conditions that may seem to be cause of the problem

 Shift  Raw material source

 Location  Day of week

 Operator  Time of the day

 Product  Material batch

 Machine  Inspector

 Inspection equipment  Production batch


 Collect additional data based on classification, if

necessary

 Stratify data based on the classification


 Calculate average of each classification or plot

appropriate graph

 Look for significant differences or abnormalities in

data

 Generate a list of possible causes


 Un – stratified data

Date 23/2 24/2 25/2

Rejection 33 30 32
 Stratified data
Time 23/2 24/2 25/2
9:00-10:00 15 14 16
10:00-11:00 1 2 0
11:00-12:00 2 0 1
12:00-1:00 1 0 1
1:00-1:30 lunch
1:30-2:30 10 11 12
2:30-3:30 3 1 0
3:30-4:30 0 2 1
4:30-5:30 1 0 1
 Pareto chart is a diagram that shows the order of the

largest number of occurrences by item or by classes,


and the cumulative sum total
 Vilfredo Pareto (1848-1923), an

Italian economist discovered in 1897


that 80% of a nation’s wealth was

owned by 20% of the population

 Dr. Joseph.M.Juran applied this

principle to quality management and

called it the pareto principle


 Pareto principle: 80% of the problems come from 20%

of the causes

 Distinguishes between vital few and trivial many

 Displays relative importance of causes of problem

 Helps the team to focus on those causes that will have


the greatest impact when solved
Inputs
Causes 20%
Effort

80%

Outputs
Effects
Results
 Select the problem
 Collect data
 Sort data & calculate cumulative frequency
 Draw the axes
 Construct the bars
 Draw the cumulative percentage line
 Title and label the chart
 Identify vital few from the trivial many and plan
further action
 Select the problem for investigation
 Decide what data will be necessary and how to classify
them
 Determine the method of collecting data and period of
data collection
 Design a separate check sheet if necessary
 E.g: causes for service complaints of computer system
Causes Frequency
Print problems 11
Rodent problems 3
Server crash 23
Boot problems 8
Bad configuration 6
Virus attack 52
System re-configuration 3
Operating system corrupted 9
Email not functioning properly 4
Loose connection 5
Others 12
Cumulative Cumulative
Code Causes Frequency
frequency percentage
A Virus attack 52 52 38.24
B Server crash 23 75 55.15
C Print problems 11 86 63.24
Operating system
D 9 95 69.85
corrupted
E Boot problems 8 103 75.74
F Bad configuration 6 109 80.15
G Loose connection 5 114 83.82
Email not functioning
H 4 118 86.76
properly
I System re-configuration 3 121 88.97
J Rodent problems 3 124 91.18
K Others 12 136 100.00
136=100%
 It is undesirable that “others” represent high
percentage (should be < 10%)
 If the cause of a problem can be solved easily,
implement it even if it belongs to trivial many
 Wherever possible, compare monetary data with
frequency data
 Draw the Pareto chart before and after improvement
 A diagram which represents meaningful relationship

between an effect and its causes

 A diagram which shows the relation between a

quality characteristic and the cause factor


 Enables a team to identify, explore and graphically
display all the possible causes related to a problem

 A cause and effect diagram is good for seeing the


whole “causal” relationship

 Enables identification of root causes and not


symptoms
 Dr. Kaoru Ishikawa developed the
first cause and effect diagram in
1943 while consulting for Kawasaki
steel works

 Dr.Joseph.M.Juran named it as
Ishikawa diagram
Big Bone

Medium
Sized Bone

Effect
(characteristic)

Small Bone
 Dispersion Analysis Type.

 Process Flow Classification Type.

 Cause – Enumeration Type.

Note

Dispersion analysis type and Cause – Enumeration type


differ only in the method of construction
 State the undesirable effect

 Identify the main cause groups

 Identify causes and sub-causes

 Identify potential root causes


Draw the back Bone and draw a line
Such as man, machine, method, material,
measurement, tool

Measurement Machine Man

Environment Material Method


Brainstorm: Ask “why” questions

Measurement Machine Man

Poor handling

Rod bent

Environment Material No Method


Inspection
High Hardness
Runs out of ideas, focus attention to place

Measurement Machine Man

Poor handling

Rod bent

Environment Material No Method


Inspection
High Hardness
that some ideas appear in two different places. “Calibration” shows up
under “methods” as a factor in the analytical procedure, and also under
“measurement” as a cause of lab error. “Iron tools” can be considered a
“methods” problem when taking samples or a “manpower” problem with
maintenance personnel.
 State the undesirable effect

 Identify the main process flow diagram

 Identify the causes and sub – causes at each stage of


the process

 Identify the potential root cause(s)


Draw a vertical line state the undesirable effect
Draw a vertical line state the undesirable effect
 State the undesirable effect

 List all possible causes using brainstorming

 Arrange causes and sub – causes showing the


relationship between cause and effect

 Identify potential root cause(s)


 Identify all the relevant causes (factors) & the causes

most strongly influencing the effect (characteristic)

 Express the effect (characteristic) “negatively”

 The linking question between effect and its cause is

“why?”

 Make the same number of causes and effect diagrams

as that of effects
 It is a type of run chart used for studying the process

performance over time in order to understand and

reduce variation
 Dr.Walter.A.Shewart invented the

control chart

 He was working in bell labs on a project

to make all telephones alike

 Published the book called “Economic

control of quality of manufactured

product” in 1931
 Every process is subject to variation

 More the variation in the process, more the loss to the

society

 Two types of causes affect variation

 Common cause (also known as chronic cause, chance cause)

 The cumulative effect of many small and “individually

uncontrollable” causes of variation in a process. Express the

effect (characteristic) “negatively”


 Special cause (also known as sporadic or assignable cause)

 One of a few causes of variation that result in a large variation in

the process

 Action on variation entirely depends on type of cause

identified
Common cause Special cause
Consists of many individual
Consists of one or few causes
causes
Results in relatively smaller
Results in large variation
variation

Process need not be tampered Process need to be investigated


with and corrected

Process is considered stable Process is unstable


 Control chart is used for differentiating between

common causes and special causes of variation

 Control charts also helps in determining whether the

 Process is stable

 Process is capable

 It helps in predicting process performance


 Variable data

 Data that can be measured

 E.g. Weight, height, length, hardness, diameter, angle

 Attribute data

 Data that can be counted

 E.g. Defects, scratches, dent, spatters, blow, holes, cracks


Control
chart

Variable Attribute
data data

-R chart p chart

X – mR
chart c chart

mX – mR
chart np chart

u chart
Y - Axes
Variable Data
Central line

Control
limits

Data
Points

subgroups
 Sub groups

 Smaller groups of sample data collected over time

 Central line

 The average of all the sub group averages

 Control limits

 The outer limits of “Process Variation”


Control limit Specification limit

 Variation in the process  Requirement of the

 “Noise of the process” customer

 Limits changes with  “voice of the customer”

setting, correction, process  Limits changes only

change, etc. when customer wishes to

 Indicates capability change

 Indicates requirement
 Collect the data

 Calculate sub – group average

 Calculate overall average

 Calculate the range

 Compute average of range

 Calculate control limit for X and R

 Plot the chart

 Interpret the chart


 Collect and stratify data into sub groups

Sub-groups X1 X2 X3 X4 X5

1 47 32 44 35 20

2 19 37 31 25 34

3 29 11 16 11 44

4 28 29 42 59 38
1 = X1+X2+X3+X4+X5
n

1 = 47+32+44+35+20
5
= 35.6

Where n is the size of the groups


= 1+ 2+ 3+ 4
K

= 35.6+29.2+22.2+39.2
4
= 35.6

Where K is the size of the sub group


= Maximum value – Minimum value

= 47 – 20 = 27
= 1+ 2+ 3+ 4
K
= 27 + 18 + 33 + 31
4

Where K is the size of the sub group


 Central line =

 Upper control limit : UCL = + A2

 Lower control limit : LCL = - A2

 A2 is the coefficient whose value depends on the

subgroup size
 Central line =

 Upper control limit : UCL = D4

 Lower control limit : LCL = D3

 D3 and D4 are the coefficient whose value depends on

the subgroup size


Subgroup
R chart
size Chart

n A2 D3 D4 d2

2 1.880 0 3.267 1.128

3 1.023 0 2.574 1.693

4 0.729 0 2.282 2.059

5 0.577 0 2.114 2.326

6 0.483 0 2.004 2.534


 Vertical axis : and R values

 Horizontal axis : sub – group number

 Draw the central line : and R

 Draw the control limits

 Plot the and R values and join the points

 Write necessary items like name of the process,

product, size of the subgroup, work conditions, shift,

etc.
Process stability Process capability

 Look at the pattern of  Establish process variation


variation  Compare with specification
 Should be random and not and establish process
a systematic pattern capability

 Look for presence of


special causes

 5 rules of special cause


identification
 Random variation and no systematic pattern

 No action required (if Cpk > 1.67)


 Presence of special cause

 Identify root cause and take action


 Presence of special cause

 Process has shifted


 Presence of special cause

 Process is deteriorating
 Presence of special cause

 Periodic Interference in the process


 Presence of special cause

 Identify root cause and take action


 Process capability is a measure of inherent variability of

the process when compared with the customer

requirements
 Assess capability of a process to meet customer’s

requirement

 Assist in selecting or modifying a process

 Assist in selection of machine

 To build quality into the product and process rather

than achieving quality by inspection


 Establish process variation

process variation = 6σ

σ = .
d2

 d2 is a constant based on sub – group size

 Refer slide number 124


 Capability = Customer Requirement
Process variation

 Cp = USL –LSL

Cp > 1.33; Process is more capable than customer


requirement
Cp = 1.0; Process is just capable of meeting customer’s
requirement
Cp < 1.0; Process is not capable of meeting customer’s
requirement
 Cpk = Minimum (USL - );( - LSL)
3σ 3σ

 Cpk = Cp; process is centered with respect to


customer’s requirement

 Cpk љ Cp; Process is not centered with respect to


customer’s requirement
 Histogram is a type of bar chart representing the
frequency distribution of the data from a process
 Displays large amount of data, that are difficult to
interpret in tabular & graphical form

 Shows the relative frequency of occurrence of the


various data values

 Provides useful information for understanding the


present performance and predict future performance
of the process
 Reveals the centering, variation & shape of the data

 Helps evaluate process capability & the question “is


the process capable of meeting customers
requirements?”

 Enables corrective action to keep the process within


specification limits

 Excellent planning and forecasting tool


 When the data are numerical

 When you want to see the shape of the data’s


distribution, especially when determining whether
the output of a process is distributed approximately
normally

 When analyzing whether a process can meet the


customer’s requirements

 When analyzing what the output from a supplier’s


process looks like
 When seeing whether a process change has occurred
from one time period to another

 When determining whether the outputs of two or


more processes are different

 When you wish to communicate the distribution of


data quickly and easily to others
 Decide on the process measure

 Gather data

 Prepare of frequency table


 Calculate range, class intervals, class width and boundaries

 Draw the axes

 Draw the bars

 Interpret the histogram


 Only one parameter can be used for constructing the
histogram

 The data should be variable data, i.e., Measured on a


continuous scale (weight, time, temperature,
dimensions, speed, etc.)
 Example : weight of a rice bag
 For accurate analysis of mean, dispersion and
patterns, collect at least 50 to 100 data points

98.7 100.6 100.2 100.6 100.3 100.3 98.6 99.6

100.0 100.3 99.9 99.9 99.9 100.8 100.5 99.5

100.4 99.7 100.2 99.8 100.1 99.7 100.4 99.8

99.6 100.3 99.4 100.4 99.0 99.9 99.5 99.2

101.5 99.3 101.3 99.2 100.9 100.1 101.6 100.2

100.5 101.1 100.0 101.2 100.1 99.4 99.1 100.1

99.2 100.0 99.6 100.0 100.2 101.4 101.0 100.2

101.0 98.8 100.7 100.3 100.8 100.1 100.0 100.9


 Calculate the number of data points, n

 Determine the range, R

 Determine the number of class intervals, k

 Determine the class width, H

 Establish the class boundaries

 Establish class intervals

 Construct the frequency table


 Calculate the number of data points, n
 Count the number of data points “n” in the sample

n = 64 data points
 Calculate the number of data points, n

 Determine the range, R


 Determine the range “R” in the sample. Range is the
smallest value in the set of data subtracted from the
largest value

R = Xmax – Xmin

R = 101.6 – 98.6 = 3.0


 Calculate the number of data points, n

 Determine the range, R

 Determine the number of class intervals, k


 Determine the number of class intervals, “k” needed. The
following table can be used as a thumb rule

No. of data points No. of classes “k”


< 50 5–7
50 – 100 6 – 10
100 – 250 7 – 12
> 250 10 - 20
 Calculate the number of data points, n
 Determine the range, R
 Determine the number of class intervals, k
 Determine the class width, H
 Determine the class width “H”. The formula for this is
H = R/k
 This should be rounded off to a suitable value depending
upon the data collected
H = 3.0 / 7
H = 0.428 ~ 0.5
 Calculate the number of data points, n
 Determine the range, R
 Determine the number of class intervals, k
 Determine the class width, H
 Establish the class boundaries
 Use the smallest individual measurement in the sample or
round off to the next appropriate lowest round number.
This will be the lower end point for the first class interval
 Do the same for the highest number. This will be the higher
end point for the last class interval

Class Boundaries – 98.5 & 102.0


 Establish class intervals
 Add the class width “H” to the lower end point. This will be
the lower end point for the next class interval

 Each class interval must be mutually exclusive

 Add the class width to the lower class boundary until the
“K” class intervals and/or the range of all the numbers are
obtained

98.50 – 98.99 100.00 – 100.49

99.00 – 99.49 100.50 – 100.99

99.50 – 99.99 101.00 – 101.49

101.50 – 101.99
 Construct the frequency table

Class Class
Frequency Total
# Boundaries
1 98.50 – 98.99 3
2 99.00 – 99.49 8
3 99.50 – 99.99 13
4 100.00 – 100.49 23
5 100.50 – 100.99 9
6 101.00 – 101.49 6
7 101.50 – 101.99 2
 Process Centering
 Process Variation (Dispersion)
 Histogram Shape
 Process Comparison with specification(Process
Capability)
 Process Centering
 Process Centering
 Process Centering
 Process Variation (Dispersion)

Process
within
What is the
requirements
variation or
spread of
the data? Is Process
it too too
Variable? variable
 Histogram Shape

Normal Bi-modal
distribution distribution

Distribution with isolated


Skewed island
distribution
 Process Comparison with specification(Process
Capability)

 Process capable  Process capable


and centered but not centered

 Maintain Process  Re-set to centre


the Process
 Process Comparison with specification(Process
Capability)

 Process just  Process just


capable and capable but not
centered centered
 Reduce variation  Centre process and
to avoid defects reduce variations
 Process Comparison with specification(Process
Capability)
 Process not capable
but centered
 Reduce process
variation to avoid
defects
 Choose critical process parameters
 Gather as much as data as possible
 Choose appropriate class intervals, width, boundaries
and scale
 Specify targets and specification limits
 Take corrective action and verify
 Before drawing any conclusions from your histogram,
satisfy yourself that the process was operating
normally during the time period being studied. If any
unusual events affected the process during the time
period of the histogram, your analysis of the
histogram shape probably cannot be generalized to
all time periods
 Analyze the meaning of your histogram’s shape
 A chart used to study and identify the possible
relationship between two variables
 To identify the possible relationship between the
changes observed in two variables
 To establish the

 Existence of correlation

 Type of correlation

 Strength of the relation


 To confirm a hypothesis (assumption) that two
variables are related
 Provide both visual and statistical means to test the
strength of a potential relationship
 Provide a good follow up to a cause and effect
diagram to find out if there is more than just a
consensus connection between causes and effects
 Cake height and Oven temperature
 Weight and Height of a man
 Population & Literacy levels in a state
 Weight error and Earthing voltage
 Nonconformance & Operator experience. Hardness
and carbon content
 Inspection mistakes and Illumination levels
 Elongation of threads and moisture content
 Child’s height and Father’s height
 Quality characteristic and the factor affecting it
Weight and Height of a Person
 Collect paired data
 Choose independent and dependent variable
 Draw the axes
 Plot the points
 Label and title the charts
 Interpret the chart
 Collect 50 – 100 paired data (X,Y) between which you
want to study the relation, and construct a data
chart

Sample Oven temperature Cake height


1 60o 3.2cm
2 49o 2.8cm
3 57o 3.0cm
. . .
. . .
60 68o 3.3cm
 Always choose ‘X’ axis for the cause and ‘Y’ axis for
the effect, when the two variables consists of a
factor and quality characteristics

 Oven temperature = independent

 Cake height = dependent

 Find the respective maximum and minimum values of


the variables
M.Ganesh Murugan
9715447621

You might also like