P05 GENERAL NOTES:

1- ALL DIMENSIONS ARE IN MILLI METERS UNLESS NOTED OTHERWISE.

PC P06 PD DIMENSIONS SHALL NOT BE OBTAINED BY SCALING DRAWINGS.


2- ALL LEVELS SHOWN ARE IN METERS.
3- PROJECT LEVEL 0.00 = (0.00 NADD)
4- THIS DRAWING SHALL BE READ IN CONJUNCTION WITH APPROVED
MEP SHOP DRAWING
01 KEY PLAN:
PE SSL 5.300 SSL 5.300

02a
GP

P04 PF

SECTION-1 SECTION-2a
(TO BE ADJUSTED AS PER SITE CONDITION)
LEGEND:

02 STEEL REINFORCEMENT INDICATION


a
PG

CONCRETE COVER
P03 DEEP FOUNDATIONS AND PILE CAPS
SUSPENDED SLABS (REINF. DIA < 32mm)
=
=
75mm EARTH FACES / WATER FACE, 50mm OTHER FACES
30mm (INTERNAL), 50mm (EXTERNAL)
SUSPENDED SLABS (REINF. DIA > 32mm) = 40mm (INTERNAL), 50mm (EXTERNAL)
SLAB ON GRADE = 50mm (INTERNAL), 50mm (EXTERNAL)
SSL 5.300 SSL 5.300 BEAMS, & LINTELS = 40mm (INTERNAL), 50mm (EXTERNAL)
COLUMNS & WALLS = 40mm (INTERNAL), 50mm (EXTERNAL)
PARAPET = 30mm (INTERNAL), 50mm (EXTERNAL)
PILES = 75mm
SHALLOW FOUNDATIONS, RAFT, BASEMENT
RETAINING WALLS, TUNNEL WALLS AND

TOW
TUNNEL SLABS = 55mm EARTH FACES / WATER FACE, 50mm OTHER FACES
WATER TANKS AND POOLS = 50mm

00
+5.3
+4.880 TOC
PH
DE
TA
IL
"A"
DETAIL "A" (26 Nos)
+5
(TO BE ADJUSTED AS PER SITE CONDITION)
.3 00
01 TO
01
01

+4.880 TOC CONTRACT REFERENCE DRAWING


01 P02 DWG. TITLE DWG. NO. REV.
REFERENCE DRAWING NO.
RETAINING WALL CORBEL
01 GENERAL DETAILS ST-OVR-0GEN-00002~00005
02 STANDARD DETAILS SID-TG-RBG-P01-ST-OVR-9DET-90006 00
03

PJ 04
05
06
07
P01 08
09

RFI REFERENCE NO.

01 CONFIRMATION AND CLARIFICATION 115-BLG-CVL-RF-ASG-RFI-GN-505001 00


PB PK
REQUIRED REGARDING GENERAL NOTES
AND THE GIVEN TYPICAL DETAIL

02 USING BARS (12 M LENGTH) CONSIDERING SID-TG-ASGC-ST-RFI-00003 00


01 +5

a
TENSION LAP IN BOTTOM & TOP (AT ANY

02
.3 LOCATION) FOR THE RAFT/SLAB REINF.
00
TO
W

PC
01
PL
SSL 5.300
RC 150

01 CLEAR COPY 22/12/2023


W

PD
TO

01 FOR APPROVAL 09/05/2023


01
0

00 FOR APPROVAL 27/04/2023


0
.3
+5

D - M - Y
REV. DESCRIPTION DATE

PROJECT:
01 SAADIYAT ISLAND DEVELOPMENT
PM THE GROVE
ABU DHABI - UAE
PE

01

PF
01

PROJECT DESCRIPTION:
SSL 5.300
RESIDENTIAL AND RETAIL
RC 300 PN B2+G+10 - PHASE 1
OWNER:

ALDAR PROPERTIES PJSC


P.O BOX 51133, Abu Dhabi
United Arab Emirates
01 PG T: +971 2 810 5555
F: +971 2 810 5550

PROJECT MANAGER:

EIBFS MUROOR TOWER, 2ND FLOOR


FLAT 202
P O BOX 5201, ABU DHABI
T: +971 2 631 9161
01

SUPERVISION CONSULTANT:
ABU DHABI MALL,
WEST TOWER, 3rd FLOOR,
P O BOX 7562, ABU DHABI, UAE
T: +971 2 614 9100
PH F: +971 2 627 0999
EMAIL office.abudhabi@atkinsglobal.com

CONTRACTOR'S DESIGN CONSULTANT:

7TH FLOOR, ADDAX TOWER, AL


REEM ISLAND
01 P O BOX 3805, ABU DHABI
T: +971 2 631 9161
F: +971 2 633 4150

MAIN CONTRACTOR:

CORNICHE ROAD, 3 SAILS


BUILDING, OFFICE 1503
P O BOX 29646, ABU DHABI
PJ T: +971 2 681 7544
F: +971 2 681 7548

SSL 5.300 BLOCK-8


P04 SUB-CONTRACTOR:

RC 300

PROJECT NO:
ASGC - AD115
P02 P03 DRAWING TITLE:

H013 PK H014 P01 H-AF H015 H016 H017 H018 H019 H020 REINFORCEMENT DETAILS OF GUGGENHEIM PLAZA
@ LOWER GROUND (5.300.LVL.) LEVEL SLAB

GUGGENHEIM PLAZA LG LEVEL


DRAWING NUMBER:
SLAB REINFORCEMENT DETAILS PROJECT
CODE
WORK.PACK. ORIG. CO. AREA BLDG LEVEL FILE. TYPE DISC. SI NO. REV.

SID.TG1 BW ASGC P01 PRW LG PL ST 455279 01


SHEET NO. PAPER SIZE SCALE DIM IN DATE
01 / 02 A0 mm 27/04/2023
NOTE:-
APPROVED BY.
1-THIS DRAWING SHALL BE READ IN CONJUNCTION WITH APPROVED PREPARED BY CHECKED BY
CONCRETE DIMENSION SHOP DRAWING & BUILDER'S WORK BD A.F N.E