Professional Documents
Culture Documents
List of Terms
A Total average cost of setting up and operating a specific process, including plant,
labour, supervision and overheads, per second in the chosen country.
B Average annual cost of tooling for processing an ideal component, including
maintenance.
Ah Basic handling index for an ideal design using a given handling process.
Af Basic fitting index for an ideal design using a given assembly process.
Cc Relative cost associated with producing components of different
geometrical complexity.
Cf Relative cost associated with obtaining a specified surface finish.
Cft Value of Ct or Cf (whichever is greatest).
Cl Labour rate.
Cma Total cost of manual assembly.
Cmp Relative cost associated with material-process suitability.
Cmt Cost of the material per unit volume in the required form.
Cs Relative cost associated with size considerations and achieving
component section reductions/thickness.
Ct Relative cost associated with obtaining a specified tolerance.
F Component fitting index.
H Component handling index.
Mc Material cost.
Mi Manufacturing cost (pence).
n Number of operations required to achieve the finished component.
N Total production quantity per annum.
Pa Penalty for additional assembly processes on parts in place.
Pc Basic processing cost for an ideal design of component by a
specific process.
Pf Insertion penalty for the component design.
Pg General handling property penalty.
xv
Notation
Units
m metre
μm micron/micrometre
mm millimetre
t tonne (metric)
kg kilogramme
l litre
g gramme
h hour
min minute
s second
rpm revolutions per minute
Abbreviations – General
CAD Computer-aided Design
Cpk Process Capability Index
DFA Design for Assembly
DFM Design for Manufacture
HV Vickers Hardness
JIT Just in Time
NDT Non-destructive Testing
OEM Original Equipment Manufacturer
PDS Product Design Specification
ppm parts per million
PRIMA Process Information Map
xvi
Notation
xvii
Notation
xviii
Notation
xix