a
project quality lan
DOCUMENT / MATERIAL /SAMPLE FOR APPROVAL
QUDA
project ‘Avenue S trade
to(organization) KSB. cas
attention to Pn, Norazlinda Elisa Alias Doma
reference number ARSAVES.WMS-0011 D ARCH,
ate 04/04/2023 o
copy to Ghent QS consutant
Architect Landscape Consultant
Dcasconsutant Site ofice
D_MaEConsutant a
‘description of Method of Statement
‘materiasample —aRsp-AVE3.WMS-0011-Planting of Rebar
location tobe used Structure
references,
(epee. clause eto)
supplier
Installer
attachment Manufacturers Drawings Z Method Statement
Manufacturers Lterature CD Product contieate
Sample /arocrure C1 Perormance / Tecnica! Data
D_Desgn catelaton a
nay ae = agate
(Che Mutamad Hazzie Bin Che Mansor ange
‘APPROVAL RESPOND
recommendation by consulting engineers/architect
dogument/material/sample status:
‘approval by Superintending officer
\document/material/sample status :
proved proved
E, _spproved wth comment 13 approved wen comment
ores Cl toeted
comments comments
= an =
oe ir SF INAIZAH BT. JAAFAR) name
oe Head of Department CSS e) date
RRA CONSULTS T CONSULT
Ref. No,: UM MO.STSD.QAPQP-S Revitioh
BRD OFoe/agas +
fective Date: 1 September 2020
Page 10f