First foundation detail drawing to be S511, the second to be S512, and so on.
2
The first schedule for bars in the first foundation detail drawing, S511, to be 511/01, the second to be
511/02, and so on. The first schedule for bars in the second foundation detail drawing, S512, to be 512/01, the
second to be 512/02, and so on.