Structural Engineering Drawing Plan

This document provides a numbering plan for structural engineering drawings. It lists drawing groups for general arrangements, building sections, large scale drawings, and reinforcement/steel details. Each group contains individually numbered drawings that are organized by series and may include additional numbering for bar schedules.

Uploaded by

Justin Musopole
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
338 views1 page

Structural Engineering Drawing Plan

This document provides a numbering plan for structural engineering drawings. It lists drawing groups for general arrangements, building sections, large scale drawings, and reinforcement/steel details. Each group contains individually numbered drawings that are organized by series and may include additional numbering for bar schedules.

Uploaded by

Justin Musopole
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

STRUCTURAL ENGINEERING DESIGN

DOCUMENT NUMBERING PLAN

DRAWING GROUP DRAWING TITLE SERIES BAR SCHEDULE


General Arrangements Basement Floor GA S110
Ground Floor GA S120
First Floor GA S130
Eaves GA S141
Roof GA S142
Building Sections Section X-X, Y-Y and Z-Z S310
Large Scale Drawings Stair ST1 GA S451
Stair ST2 GA S452
Ramp RM1 GA S461
Ramp RM2 GA S462
Reinforcement/Steel Details Foundation Details S5101 510/XX2
Retaining Wall Details S520 520/XX
Column Details S530 530/XX
Shear Wall Details S540 540/XX
Stair ST1 Detail S551 551/XX
Stair ST2 Detail S552 552/XX
Ramp RM1 Detail S561 561/XX
Ramp RM2 Detail S562 562/XX
Basement Floor Slab Detail
Ground Floor Slab Detail S571 571/XX
First Floor Slab Detail S572 572/XX
Roof Slab Detail S573 573/XX
Beam Details S580 580/XX
Truss Details S591
Truss Connection Details S592

1
First foundation detail drawing to be S511, the second to be S512, and so on.
2
The first schedule for bars in the first foundation detail drawing, S511, to be 511/01, the second to be
511/02, and so on. The first schedule for bars in the second foundation detail drawing, S512, to be 512/01, the
second to be 512/02, and so on.