3403

Drain line pipe Initial reading was taken on


Pipe Test 19/12/2023 @ 9:48AM.

Final reading was taken on


19/12/2023 @ 12:59AM.

The level of water is at acceptable


limit.
Unit 3403
Care should be taken while doing
the backfilling.

NOT ALLOWED TO DRILL IN THE


WET AREA.

Recommended to use mixture of


thermal insulite and cement for the
backfilling.

Please see comments.

Works may proceed further under


contractors liability.
Carl Jiffe Abat 19/12/2023

Rahamathullah Khan
Rahamathullah Khan 19.12.2023
DRAINAGE PIPE LEAK TEST AT 3403

3403– (APPROVED)
INITIAL READING WAS TAKEN ON 19/12/2023 @ 9:48AM

FINAL READING WAS TAKEN ON 19/12/2023 @ 12:59PM


DRAINAGE PIPE LEAK TEST AT 3403

Comments:

● The level of water is acceptable.


● Care should be taken while backfilling the wet area.
● Recommended to use thermal insulite & cement mixture for backfilling.
● Slope must be provided underneath the drainage main and branch lines towards the unit drainage
provision.
● Install repair coupling for building connections.
● Using glue is not allowed. Use rubber connection only.
● Works may proceed further under contractors’ liability.
2 3 4 5 6 7 8

H
WORKSTATIONS WORKSTATIONS
OFFICE#1 OFFICE#2 WORKSTATIONS 8 PAX 12 PAX
8 PAX

CEO
OFFICE#2 SECRETARY#2

ø50 mm VP HIGH LEVEL ø50 mm VP HIGH LEVEL RECREATION


ø50 mm VP HIGH LEVEL ø50 mm VP HIGH LEVEL ø50 mm VP HIGH LEVEL ø50 mm VP HIGH LEVEL

ø75 mm WP HIGH LEVEL ø75 mm WP HIGH LEVEL ø75 mm WP HIGH LEVEL ø75 mm WP HIGH LEVEL
G WAITING OFFICE#3 OFFICE#4 OFFICE#5
ø50 mm VP HIGH LEVEL
AREA#2 MEETING
MECH. OFFICE#6
W.CO ROOM
RISER
MALE FEMALE
ø110 mm SP U/T ø110 mm SP U/T ø110 mm SP U/T DN
BOARD MEETING TOILET TOILET TO U/T
F.CO
ROOM
W.CO
SERVER
ø110 mm SP U/T ø75 mm WP U/T ROOM FEMALE
LIFTING PUMP
BREAK ROOM

MEETING MECH.
ROOM RISER

BENCH
F2
LOW CURRENT ELECTRICAL ROOM STAIR 2
SECRETARY#1 RM
W13 MECH.
F GOODS WAITING RISER
WAITING AREA#3
RECEPTION AREA#1 W1 W3 STORE
EMPLOYEES

MECH. RISER
ø50 mm VP HIGH LEVELVIP+VISITOR ENTRANCE
CEO 4138 STORAGE
OFFICE#1
ENTRANCE

VIP
TOILET

LIFTING PUMP ø110 mm SP PASSAGE


AT HIGH LEVEL LIFT LOBBY
LIFT LOBBY
W14
ELEVATOR

FIRE COMPARTMENT

FIRE COMPARTMENT
MECH'L

STAIR 1 W2 W4 STORE

MECH. RISER
D2

DRAINAGE LAYOUT
ø50 mm VP HIGH LEVEL

ø50 mm VP HIGH LEVEL ø50 mm VP HIGH LEVEL


WAITING
AREA#2
W.CO MECH.
RISER
ø110 mm SP U/T

W.CO
ø50 mm VP HIGH LEVEL Oct.18
KS AA AG
ø110 mm SP U/T 2023
W.CO MECH.
MEETING
RISER
MALE FEMALE
ROOM ø110 mm SP U/T ø110 mm SP U/T ø110 mm SP U/T DN

BENCH
TOILET TOILET TO U/T HQBP- NHC
F.CO
W.CO
LOW CURRENT SERVER
SECRETARY#1 RM
ø110 mm SP U/T ø75 mm WP U/T ROOM DRAINAGE LAYOUT
WAITING
AREA#1 OCT.18
RECEPTION NHC-PL-301 00 2023

ø50 mm VP HIGH LEVELVIP+VISITOR


CONSULTANT
ENTRANCE

VIP
TOILET
LOW CURRENT ELECTRICAL ROOM
LIFTING PUMP ø110 mm SP
AT HIGH LEVEL
P.O. BOX 6227, JEDDAH 23521, TEL 012 6986529 FAX 012 6986407
www.fbs-ksa.com
FIRE COMPARTMENT

You might also like