You are on page 1of 7
Teaned on the borrower on this format are the property of ENGINEERS INDIA LIMITED. They are m copied, exhibited or used, except WaT ae & fau wae fads STANDARD SPECIFICATION FOR SURVEY WORKS 2 | 20711786] REVISED AND ISSUED AS STANDARD [SPECIFICATION Ge w [be 7 | 227218 [UPDATED AND ISSUED AS ores Fes WMAP SPECIFICATION. © | 1376/86 [ISSUED AS STANDARD SPECICATION Tes ne) nore a NO| DATE REVISION BY CHECKED | CONVENOR | CHAIRMAN (S.8.) SPECIFICATION | REV ENGINEERS INDIA LIMITED | STANDARD SPECIFICATON FOR NEW DELHI SURVEY WORKS 6-65-02 2 Page 1 of 7| 297 3 i 3 i = Ee 3: 3 zg z 3 < 2 2 z 37 and details given on this format. The drawing, copied, exhi 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 CONTENTS GENERAL. SCOPE PERFORMANCE REQUIREMENTS LOCATION SURVEY OF EXISTING CONTROL POINTS TOPOGRAPHICAL SURVEYS SPOT LEVELS & CONTROL PLANS SURVEY OF EXISTING STRUCTURES GRID-STATIONS, BOUNDARY PILLARS AND PERMANENT PILLARS (BUOYS) MAPS & DRAWINGS DOCUMENTS TO BE HANDED OVER BY THE CONTRACTOR TO CLIENT. PAYMENT al ENGINEERS INDIA LIMITED | STANDARD SPECIFICATON FOR SPECIFICATION REV NEW DELHI SURVEY WORKS 6-65-02 Page 2 of 7| 2 GENERAL The intent of this specification is to cover the basic requirements for conducting the land surveys to generate requisite information for the design and field engineering activities. 2.0 SCOPE This specification covers the land surveys consisting of the following works. a) Preparation of contour survey maps, with spot levels. b) _Establishment of base line and grid system for defining the co-ordinates of the various areas. Toaned on the borrower's express agreement that they will nat be reproduced] ©) Preparation of surveys maps. One set of survey maps shall be prepared as below : 4) Overall layout of the area to a scale of 1:2000 with spot levels @ 50 m C/C and a contour interval of 0.5 meters unless specified otherwise. ©) Electronic file for spot levels. 2.2 The grid system shall be established by constructing cement concrete pillars/brick pillars.stone masonry pillars @ 400 m C/C along the base line and a 200 m CIC at right 1d by a written consent given by the lender to the borrower for the intended use. EIL-1641-507 Ad 210x297 angles to the baseline. The property of ENGINEERS INDIA LIMITED, They are mi 2.3. The survey maps shall show all cross drainage works, U/G cables, pipes etc. irrigation structures, building, trees, electric, Telegraphic poles, transmission towers or any other prominent physical feature. 2.4 Establish reliably High flood level and its source and indicate the source of information. 2.5 For sea shore locations, indicate tidal data such as low tide, high tide and mean tide levels. ENGINEERS INDIA LIMITED | STANDARD SPECIFICATON FOR Srecrieanon Lea NEW DELHI SURVEY WORKS 6-65-02 2 Page 3 of 7| z lender to the borrower for the intended use. El i 3 € i 5 3 z i 2 i g z < 2 2 2 g : 3 The drawing, design and de 2.6 27 3.0 31 3.2 33 34 3.5 3.6 4.0 44 42 43 Identify storm water disposal point as naturally existing as per site conditions. The contractors shall identify Bench mark of the area and shall carry over level from Bench Mark to the site bench mark. This reference of BM shall be recorded on survey drawings. PERFORMANCE REQUIREMENTS The work shall be carried out as per the well established, sound survey practices and standards and by qualified and competent surveyors under the direct supervision of qualified engineers and surveyors. The Contour survey shall be carried out with reference to the existing permanent bench marks. All measurements shall be in metric units. The corrections arising from the standard errors, variations in temperatures, pulls etc. shall be incorporated to the linear ground measurements. The observations for the measurement of vertical distances on bench marks and turning points shall be read nearest to 5 mm and for other nearest to 10mm. The error for linear measurement shall not exceed 1:10,000 and for angular measurements, six seconds per station. LOCATION SURVEY OF EXISTING CONTROL POINTS A preliminary survey to identify exising contro! points shall be carried out and their correctness ensured. All such control points shall be demarcated in the area plan. ‘The nearest available permanent bench mark shall be transfered to the area either on a permanent feature or on a concrete pillar specially erected for the purpose. ENGINEERS INDIA LIMITED | STANDARD SPECIFICATON FOR SPECIFICATION NEW DELHI SURVEY WORKS 6-65-02 5.0 TOPOGRAPHICAL SURVEY The topographical surveys shall be carried out in the following way. 5.1 Horizontal Control ‘The horizontal control shall be fixed by one or a combination of the following: a) Triangulation. b) Closed Traverse. ‘agreement that they will not be reproduced) 507 Ad 210x297 5.1.1 Triangulation The triangulation work shall start from a baseline, having a minimum length of 100 meters in relation to a point whose co-ordinates have been established. The accuracies of linear and angular measurement shall meet the requirements defined in para 3.0. 5.1.2 Before starting the triangulation work, grid pillars shall be constructed on the base line. 5.1.3 Closed Traverse The closed traverse shall be set by the measurement of angles between two successive lines. The angles shall be measured with theodolite only. The distance between two traverse stations shall not be more than 100 meters. ‘The cumulative angular error of the closed traverse shall not be more than 30/N seconds where N is the number of traverse station. All the traverse shall have an accuracy of not less than 1:5000. 5.2 Vertical Control 5.2.1 Vertical control points shall be fixed by dumpy level on all the traiangulation/traverse station, and shall be closed by coming back to the starting point. The accuracy of the main control shall be + 5K mm where K is the distance in Kilometers, 5.2.2 After setting horizontal and vertical control, inter-filling can be done either by the theodolite or by any other means: ENGINEERS INDIA LIMITED | STANDARD SPECIFICATON FOR cdaicaticeaaeas lade NEW DELHI SURVEY WORKS 6-65-02 2 Page 5 of 7} SPOT LEVELS & CONTOUR PLANS For taking the spot levels, the area shall be divided into main grids of 50M x 50 M and levels observed at every inter section. These grids shall be further sub-divided into smaller grids of 25 M x 25 M to locate prominent physical features of the terrain. The field levels They willnot be reproduced] rrower for the intended use. EIL-1641-507 Ad 210x297 shall be so obtained as to get a countour interval of 0.5 meters. SURVEY OF EXISTING STRUCTURES The survey of the existing structures shall include road with centre line co-ordinates, width of roads, berms, details of curves, location of storm water drains, culverts etc. GRID STATIONS, BOUNDARY PILLARS AND PERMANENT PILLARS (BUOYS) : These shall be constructed of cement concrete brick stone masonry work of sizes as below: Grid stations - 300 x 300 x 1200 mm deep (500 mm below G.L. and 700 mm above G.L.). Boundary pillars along land acquisition limits at all corners and at 400 mm c/e in straight reaches shall be constructed. Size shall be 300 x 300 x 1000 mm deep. (500 mm below GL and 500 mm above GL). Permanent Pillars(Buoys) shall be of size 1500 x 1500 x 2000 mm with co-ordinates on RI for future reference as per locations maked in the reference drawings. : i 2 3 2 i i t i E z s g 3 Grid stations and Permanent Pillars shall be provided with steel plates 150 x 150 x 10 mm embeded in concrete with 12 mm dia x 150 mm long anchor bolts. These shall be provided with punch lines & painted with anticorrosive paint. All Grid station and pillars shall be numbered for easy identification. MAPS & DRAWINGS ja given on this format The survey maps shall be based on the survey work executed and shall show all relevent infromations regarding existing features, physical terrain, grid system; permanent bench mark etc. These maps shall be the sole property of the owner. The drawing, design and ENGINEERS INDIA LIMITED | STANDARD SPECIFICATON FOR srecmearen NEW DELHI SURVEY WORKS 6-65-02 Page 6 of 7| 10.0 10.1 10.2 ‘borrower's express agreement that they will not be reproduced] tended use. EIL-1641-507 Ad 210x297 10.3 10.4 ‘way permitted by a written consent given by the lender to the borrower for the js given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned ont 11.0 “The drawing, design and DOCUMENTS TO BE HANDED OVER BY THE CONTRACTOR TO CLIENT The contractor shall hand over all field books neatly maintained as specified elsewhere. Any clarification required on the field book shall be promptly furnished by the contractor to client/Engineer-in-Charge. Five copies of check prints of the plotted maps shall be supplied by the contractor to Client/Engineer-in-Charge for their approval along with original which shall be prepared on the tracing cloth. On approval of check prints by Engineer-in-Charge, ten copies of blue prints along with original tracings on polyster non-tear transparent tracing film in ink for the map shall be handed over to Engineer-in-Charge. In addition to the requirements given above the contractor shall furnish the field in Electronic fil using NORTON EDITOR software in the following formats STORE bni,bx, by, bz, b* STORE bn2, bx, by, bz, b* ml 12,34 sm(node no. of spot level) b blank space x x-coordinate y _ y-coordinate Zz z-coordinate * —* from key board Property of Maps ‘Maps prepared by the contractor based on survey work carried out under this agreement shall be the sole property of Client. The contractor shall have no right to use reproduce or pass on to the third party without prior written permission of Client. PAYMENT Payment for survey work shall be made on Area basis as per schedule of items Payment for grid stations, boundary pillars, permanent pillars (Buoys) shall be made on unit basis as per schedule of items. No other payment shall be made. All connected works including supply of drgs. and Electronic files shall be considered as part of the total work. ENGINEERS INDIA LIMITED | STANDARD SPECIFICATON FOR ‘SPECIFICATION REV NEW DELHI SURVEY WORKS 6-65-02 Pe

You might also like