STANDARD SPECIFICATION FOR
COMPOUND WALL
2
sn consent given by the lender
bya
= 3 | 26/97 [easel aaa ‘AS STADARD grat for Ve or
23 [72 | sree [Revise AND ISSUED. PSB, SM RPS. s
: 7212197 JUPDATED AND ISSUED AS BAWA a aNS
: SPECIFICATION
+} [To [avers [1ssuen as stanbano SPEOFCATION wi are Ror RK
28 [nol vate REVISION ey | CHECKED | CONVENOR [CHAIRMAN (8.8)
ENGINEERS INDIA LIMITED | STANDARD SPECIFICATION FOR Sere nee erat ne
NEW DELHI COMPOUND WALL 6-65-10 3
Page 1 of 7|CONTENTS
Tot be reproduced]
CL. NO.
1 SCOPE
2 REFERENCE STANDARD SPECIFICATIONS
3.0 CLEARING AND STRIPPING
the intended use, Ell-1641-507 Ad 210x297
4.0 EARTHWORK IN FILLING ALONG THE LENGTH
OF COMPOUND WALL.
5.0 BARBED WIRE FOR ANTICLIMBING DEVICE OVER
COMPOUND WALL
given by the lender to the be
by a written cons
way permi
inthe
ENGINEERS INDIA LIMITED | STANDARD SPECIFICATION FOR | __ SPECIFICATION | REV
NEW DELHI COMPOUND WALL 6-65-10 3
Page 2 of 7|ited way permitted by a written consent given by the lender to the borrower for the intended use. ElL-1641-507 Aé 210x237
The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they willnot be reproduced]
‘copied, exhibited or used, except in th
1, SCOPE
This specification specifies the requirements of compound wall for security purposes.
2.0 REFERNCE STANDARD SPECIFICATIONS
Following standard specification shall be enclosed as part of the job specifications.
1 Construction Specification - 6-68-01
General Scope.
2 Construction Specification - 6-68-02
Material
3 Construction Specification - 6-68-03
Earth work.
4. Construction Specification - 6-68-04
Plain & Reinforcement
‘Cement Concrete.
5. Construction Specification - 6-68-09
Brick Masonary.
6. Technical Specification | 6-75-02
for Architectural works
(Plastering and Pointing)
3.0 CLEARING AND STRIPPING
3.1 The areas including depressions, where filling or cutting is to be carried out shall be cleared
and stripped offcompletely of bushes, roots, vegetation, shrubs, trees upto 30 cm girth and
organic and objectionable materials. All these should be completely uprooted and virgin soil
exposed and not merely scrapped at the surface. The roots of trees of girth upto 30 cms
shall be removed below existing ground level and holes, hollows filled up with selected
approved available earth within all leads and lifts, and compacted to obtain 90% of maximum
e
ENGINEERS INDIA LIMITED | STANDARD SPECIFICATION FOR |__SPECIFICATION | REV
NEW DELHI COMPOUND WALL 6-65-10 3
Page 3 of 7|‘The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will nat be reproduced]
copied, exhibited or used, except in the imited way permitted by 3 written consent given by the lender to the borrower for the intended use, ElL-1641-507 Ad 210x297
laboratory dry density of soil and levelled as directed by Engineer-in-Charge. All soft
patches must be worked out to remove soft soil and selected approved earth must be filled
back and the areas ( areas coming under filling) compacted to obtain 90% of maximum
laboratory dry, density of soil.
Material obtained from clearing shall be stacked or disposed off as directed by Engineer-in-
Charge within a lead of 100 M
No seperate payment shall be made for clearing, stripping and disposal of material obtained
from clearing. This shall be considered as part of work in areas of cutting and filling work
and the rates quoted under the respective items of :-
i) Earthwork in excavation/cutting and
ii) Earthwork in filling (both with available earth & earth excavated from
approved borrow areas) shall be inclusive of clearing and stripping with all
operations described above, in respective areas of cutting and filling, cutting
of trees girth 30 cm and below, up-rooting, removal of materials obtained
from clearing within a lead of 100 M as directed, filling holes or hollows
produced by removal of roots etc. with approved earth for all leads & lifts,
watering, ramming, compacting to obtain 90% of maximum, laboratory dry
density of soil, dressing, testing etc. complete.
No separate payment shall be made for clearing; stripping and disposal of materials obtained
from clearing of borrow areas for earth as directed by Engineer-in-Charge. This shall be
considered a part of filling work and rates quoted under the respective items of filling will
be deemed to include such costs.
EARTHWORK IN FILLING ALONG THE LENGTH OF COMPOUND WALL
‘After clearing and stripping as mentioned earlier the original ground shall be scrapped to a
depth of 15 cms from existing ground level and virgin soil exposed, such exposed surface
must be consolidated to 90% of the max. lab dry density of soil as described in clause 3.0
earlier.
ENGINEERS INDIA LIMITED | STANDARD SPECIFICATION FOR
SPECIFICATION
REV
NEW DELHI COMPOUND WALL 6-65-10
Page 4 of 7|jement that they will not be reproduced]
‘ivan on this format are the property of ENGINEERS INDIA LIMITED, They are merely loaned on the borrower's express
“The drawing, design and dat
ited way permitted by a written consent given by the lender to the borrower for the intended use. Ell-1641-507 Aa 210x297
copied, exhibited or used, except
42
43
44
45
46
47
48
5.0
5.1
SLL
5.1.2
The ground levels in these areas after clearing, stripping & consolidating shall be taken
Jointly by the contractor and the Engineet-in-Charge before commencing the filling and the
same shall be signed by the contractor in token of
acceptance. The levels shall be taken
at intervals as decided by Engineer-in-Charge
‘Approved filling material shall be spread in uniform layers not exceeding 15 cms in loose
thickness.
Al clods, lumps etc. shall be broken before compaction.
Successive layers of filling shall not be placed until the layer under construction has been
well compacted with necessary watering to obtain at least 90% of maximum laboratory dry
density.
The filling shall be finished in conformity with the alignment, levels, cross section and
dimensions as shown in the drawing,
Extra material shall be removed and disposed off as directed by the Engineer-in-Charge.
Payment for filling shall be made on cubic metre basis of the volume calculated from the
cross section plotted from the levels of ground as referred to in 4.2 above and the levels
reached after filling with proper consolidation. The rate shall include clearing, stripping,
compaction of original ground, transportation of earth, watering, consolidating, testing etc.
complete.
BARBED WIRE FOR ANTICLIMBING DEVICE OVER COMPOUND WALL
Structural Steel Posts for Anticlimbing Device
Structural steel shall conform to IS : 2062.
Structural steel work shall be fabricated and erected as shown in the drawings, Fabrication
and Erection shall conform to IS : 800.
ENGINEERS INDIA LIMITED | STANDARD SPECIFICATION FOR
SPECIFICATION
REV
NEW DELHI COMPOUND WALL 6-65-10
Page 5 of 7|5.13 All materials used for fabrication shall be of new and unused stock and shall
be free from twist, kinks, buckles or any defects. Maker's test certificate,
shall be made available to the Engineer-in-Charge when called for.
5.14 Electrodes for welding shall conform to IS : 814 and 815 or equivalent.
Welding shall be carried out as shown in the relevant drawing and shall
confrom to IS :816.
SAS ‘The Engineer-in-Charge reserves the right to test at any time any welding
and the cost of tests shall be borne by the contractor.
5.1.6 All materials tools and plants required for fabrication shall be provided by
the contractor and the rates quoted shall make the allowance for the same.
joaned on the borrower's express agreement that they wil not be reproduced]
5.1.7 M.S. angle posts shall be installed on top pillasters as line posts and corner
posts.
5.18 Changes in direction where the angle of deflection exceeds 20 ° shall be
considered corner and corner angle post shall be installed.
5.19 Painting shall not commence till it has been inspected by Engineer-in-
Charge.
5.1.10 All paints used shall be of synthetic enamel conforming to IS : 293 and of
approved manufacturer.
SALA All loose scales, dirt, rust etc. shall be removed with steel wire brushes
before supplying a coat of red oxide primer conforming to IS : 2074
5.1.12 The surface after applying primer shall be made absolutely dry before
applying paint
5.1.13 ‘Two coats of approved synthetic enamel paint over a coat of red oxide
(oF used, except in the limited way permitted by a written consent given by the lander to the borrower for the intended use. Ell-1641-507 A 210x297
primer shall be applied unless otherwise specified.
The drawing, design and detail given on this format are the property of ENGINEERS INDIA LIMITED. They are m
copied, exh
ENGINEERS INDIA LIMITED | STANDARD SPECIFICATION FoR | __ SPECIFICATION | REV
6
NEW DELHI COMPOUND WALL 6-65-10
Page 6 of 7|aa08d)
press agreement hat they will not be repro
‘operty of ENGINEERS INDIA LIMITED, They are merely loaned on tho borrower's
1d way permitted by a weitten consent given by the lender to the borrower for the intended use. EIL-1641-507 A4 210x297
5.114
5.1.15
5.2
5.21
5.2.2
5.2.3
5.2.4
5.2.5
5.2.6
Each coat shall be allowed to dry for sufficient time as per manufacturer's,
directions,
The payment shall be made on weight of the installed structural steel work.
The weightshall be calculated on the basis of IS hand book. The rate shall
include supply of all necessary materials and labour for fabrication,
erection, painting etc. complete as per drawingsand directions of Engineer-
in-Charge. The rates quoted should also include fixing and grouting the
iron posts with cement concrete M-15, curing, scafol
Barbed Wire for Anticlimbing Device.
Barbed wire shall conform to IS : 278. The coating on the wire shall be
smooth and relatively free of lumps, globes or points, wires with excessive
roughness, blisters, salammoniac spots shall be rejected. Barbed wire shall
be made from two strands of galvanised, twisted 2.5 mm (12 gauge) steel
wire with 4 poi
s of barbs. Each barb shall have two turns tightening
around one of both line wires making altogether four complete turns, The
barbs shall be so finished that four points are set and looked at right angles
to each other. The barbs shall also be of gauge 12.
Bracing of the rows of barbed wire shall be as shown in drawing
All miscellaneous material, the staples, st
ining bolts etc. shall be
galvanised. Minimum length of staples shall be 40 mm.
‘The fencing shall be plump, taut, true to line and complete in all respects.
The barbs shall have a length of not less than 13 mm and not more than 18
mm.
Payment for barbed wire shall be made on running metre basis of two ply,
four points barbed wire fixed in position. The rate shall include supplying
and fixing necessary G.I. staples, clips, pins, straining bolts etc. tensioning
the barbed wire etc. and all materials, labour etc. required to complete the
job.