You are on page 1of 4
Metal Edge & Metal Flashing MBBr stat: metal edge and metal ashing around pipe and vents. Clean Up BB ean and haul away all related debris. Permit fee $0.00 AMM I all the necessary permits, and pass all necessary inspections Permit Reimbursement Reiser nase ONE ORE Notes: 10 year labor warranty on entire project. 20 year manufacturer wa $0.00 $0.00 $0.00 Subtotal $41,000.00 Total $41,000.00 rranty for materials on entire project. a ¥ _ Warranty - -Price does not include permit or city fees, unless specified. -Job will not be considered incomplete if final inspection was not signed by the inspector due to any requirements or requests that have not been mentioned on this contract. -All additional wood work needed, not included in the contract will be additional charge. -All wood work does not include paint unless specified. The warranty does not cover repairs to the property except the ceiling. -Any personal belongings that are damaged are not covered by the warranty. By signing this document, the customer agrees to the services and conditions outlined in this document.

You might also like