1. Introduction
This is the technical agreement for supplying 1 set of Canrig Model 1275-681
750 ton Top Drive System.
TOP DRIVE Hydraulic Torque Boost System (back-up system) can keep drilling
by AC drived hydraulic power with max. torque 37500 ft.lbs.
FLOATING QUILL can move 8 inches up and down when making up the drill
pipe, therefore, bears no top drive weight on the drill pipe and can protect the
DP thread and absorb vibration. So that consequetly extend the DP life.
There are 2 top drive damping cylinders which installed on the elevator link seat
which support the hook, to act a buffer while running in.
3. Specifications
3.1 Technical specifications
Item Description Technical Parameter
1 Specific Model No. Model 1275AC-681 750 Ton Top Drive unit
2 Rated Load 750 ton
GE B20 – AC Motor
Max. Continuous Current: 1060 AMP
3 Main Motor Spec & Model No. Max. Intermitted Current: 1470 AMP
Max. Voltage : 600 VAC
Certificate: CCS or ABS
4 Main Motor Rated Power Horse Power : 1150 HP
5 Max. Drilling Torque (Continues) 51 400 ft-lb
6 Max. Working Speed 256 RPM
7 Gear Ratio 6.808 : 1
8 Speed Range 0 to 256 RPM
Brake - hydraulic caliper disk type.
9 Brake type & Max. Brake Torque
52300 ft-lb
10 Max. Break out Torque 90 000 ft-lb
11 Max. Make up Torque 75 400 ft-lb
12 Max. Working Pressure 7500 PSI
13 Torque Guide Type, Install Type Dual Guide Track (Supplied by Buyer)
Conformance to API Specifications
14 Safety explosive proof Grade RP500B. The Top Drive Unit is suitable for
Class I, Division II.
15 Power Adaptability 600 VAC,50Hz
Local Blower,50Hz /15 HP
16 Cooling Method
Flow : 2800scfm
Environmental Working
17 -20°C to + 55°C
Temperature
18 Environmental Working Humidity ≤ 95%
Top Drive Dimension (See attach
19 (L X W X H) 7.21 x 1.76 x 1.94 (m)
Drawing)
20 Total weight 30 000 lbs
Conformance to API Specifications 7, 7K,
8A, 8C - PSL 1RP14F, and RP500B.
21 Execute Standard
Electrical equipment complies with the
requirements of CSA and API 500B, IEEE.
22 S-Pipe connection, standard 5” 1002 Union
23 Top link Hook/Swivel
Type of Dual Guide Track Polymer guide runner to run inside of the
24
Adaptor Dual Guide Rails
25 HPU’s joint NPT 3/4” male
26 Derrick height 52 m (170ft)
27 Monkey board height 26.5 m
Distance between Guide center
28 1219 mm (for fixed Guide track adaptor)
and well center
4. Working Condition
4.1 General equipments shall be capable of working under the full weather
conditions of working ambient temp. -20℃ ~ ﹢ 50℃ , humidity≤90%
(+20℃), marine moisture, salt fog.
4.2 The noise level shall be conformed to IMO 468(XII) standard.
4.3 The equipments to be fastened firmly with the vessel and withstand the
single swing amplitude of 15°/10s when vessel towing.
5. Document
5.1. The operation and maintenance manual shall include the description of
hoisting, transporting, installation, commissioning, maintenance, safety,
piping, parts list and graphic illustration of relevant internal structure, and
with proper illustration and dimension drawings.
5.2. The maintenance manual shall clearly indicate the lubrication locations,
lubrication period, oil specification and their schematic diagrams. For oil
lubricating, the oil specification, checking method, replacing period, oil
consumption and processing method under specified condition shall be
pointed out.
6.1.2 At the construction site where the buyer designated, the supplier
shall carry out necessary on-site technical services which satisfy
the user’s requirements.
6.1.3 In the course of manufacturing, the buyer has the right to make
random investigation to the equipments status at any time, with
the premise of contact and communication in advance.
6.1.5 Top drive & its component are all new & not used, also it is
according to up-to-date technology to produce. Canrig guarantee
to provide a new, complete & build the top drive after contract
signed. The top drive system comply with its design feature with
API & related standard, satisfy with the contract requirement & no
need for the user to buy any additional equipment.
6.1.6 Due to the quality problem and cause the top drive components
damage during the warranty period, seller will take responsibility
to replace the parts to client. And the replacement will provide
another 12 months warranty, any related import expenses will be
by seller account. Exception for easy worn parts.
6.1.7 Due to the client incorrect operation & cause the damage of the
top drive, client take the responsibility & all related expenses.
6.2.1 Buyer will send formal written notice to Seller 20 day ahead, the rig
should be all well prepared for installing the top drive. 7 days ahead to
confirm the installation schedule. Seller according to the Buyer’s formal
notice
6.2.2 Client must provide enough man power (Electrical, Mechanical &
labor) to assist the completion of the installation. As the same time, one
driller & two floorman will help to operate the drawworks, etc.
6.2.3 Canrig will provide qualify technical engineer for 30 days 1 man
installation supervision at customer location.
6.2.4 Canrig will provide qualify technical engineer for 5 days 1 man
(included in the 30 days 1 man) on-site training.
6.2.5 Due to Seller reasons that cannot finish the top drive installation on
30 man-day, Seller will take responsibility for the technical person day
charges.
6.2.6 Due to Buyer reasons that cannot finish the top drive installation on
30 man-day, Buyer will take responsibility for the technical person day
charges.
7. Appendix
7.1 Top Drive Body Drawings: See attachment, CAD drawing to be supplied
within 5 days after formal notice from Buyer.
7.2 Spare parts : See attachment
7.3 Special tools: See attachment
7.4 Commissioning parts: See attachment
7.5 All components and parts list: Included in the user’s manual
7.6 Recommended Spares (2 years) See attachment
7.7 Key components, Original place and brand: See Scope of Supply
8. The total weight shall not exceed ±1% of the weight specified in the
technical agreement.
Attachment 1 Spare parts Along With Equipment