BIM strategy in New Roads

Nina Linn Rasmussen


Sr. consultant Technology (Subject responsible for constructions from 1.1.2018)

BA network meeting 30.11.2017


The client's intention with BIM

• Streamline processesthrough
digitization of the entire value chain

• Increase seriousness and quality


through transparency

http://www.bygg.no/article/1309598
A clear mission

Comprehensive and cost-effective development


and operation of traffic-safe main roads

More way for the money


Matrix organization

Head office in Kristiansand

Four development areas:


• E6 Trøndelag
• E6 Mjøs region
• E18 Langangen - Grimstad
• E39 Kristiansand - Sandnes
The trick is to manage billion-dollar contracts efficiently and well
Slim, efficient and safe client organization

Digitization contributes to New Roads being able to:

• Be a slim builder organization


• Have an overview of turnkey contracts and take care of the client's responsibility

• Achieve success with trust-based forms of contract

Transparency and openness are the basis for cooperation and development!
Profitable, decent and socially beneficial value creation

Digitization contributes to achieving sustainable projects

• Safe and fair construction site


• Serious and honest business

• Minimize greenhouse gas emissions


• Minimize negative environmental consequences

• Increase socio-economic benefits


• Strengthen the business community's competitiveness

• Better traffic safety


Faster and better planning and engineering processes require good methodology

Virtual Design and Construction (VDC) as a way of working


• Information sharing, access and interaction
• Simultaneous scheduling (ICE / BigRoom / IP)
• Knowledge-based decisions

The Tønsberg project


Virtual Design and Construction (VDC)

• Decisions, based on insight and interaction


• Approval processes, based on precise information
• Logistics, based on simulation of work processes
• Project management, based on overview
• Operation and maintenance, based on life cycle information
BIM implementation plan

• Plan for development of the model from start to finish


"One source of truth"

• Requirements for BIM maturity level 3


• common

• open*
• available

* New Roads do not require the use of a specific standard, such as IFC el

Dassault Systems
Effective project management

Info from BIM is linked to


• Financial report
• Progress report
• CO2accounting
• Crew lists
• Etc.

Automated reports

The Value Innovation Team As


Simulation of work processes and logistics

• Improvement ofHMSby early planning of work process


• Increasedefficiencyon construction site

• Minimize disadvantages toothird party

Photo: Hilde Lillejord


Better quality with BIM

Better design when using BIM


• Coordination and collision control
• Regular adjustment for better goal achievement

Documentation related to objects in BIM


• Planning and results of sampling
• Deviations and deviation treatment
• Approvals
• Certificates
• Product specifications

RUH for SHA and YM linked to BIM


• Trend analyzes
Open the format required for the BIM life cycle

The BIM model will be a digital twin that is

• An up-to-date source of lifecycle product


information (AIM)
• A follow-up tool in operation and
maintenance
- Inspections
- Maintenance
- Logging
• Prepared for the mobility of the future
- Internet of things etc.

Saudi Telecom
Constructions - Contract requirements drawings

Since the project is carried out on a model basis, there is no general


requirement from the client for the preparation of drawings.

Drawings shall be prepared where this is necessary for inspection /


approval / documentation in accordance with current routines.
Examples of elements that will require the preparation of drawings:
• Constructions
• VA facilities for HIAS, municipalities and private individuals

• Sign and marking plans


• Work warning plans / phase plans
PROJECT AREA E18

Project: E18 Tvedestrand - Arendal E18 Rugtvedt - Dørdal

General contractor: AF Gruppen Hæhre


(uses UE-Pnc Norway for construction)

Consultant: Norconsult Cowi


Status in use of 3D Held a meeting with the CEO (use of Uses drawings as a work surface.
model in engineering: model for technical approval).

Planned submission of first const. as a


model for technical approval Nov /
Dec 2017 (tunnel portal).

Status in use of 3D Established professional model to be able to Established professional model to be able to
model in production retrieve stitching data. retrieve stitching data.

Planned to use the model as a working


basis for tunnel portals and some
prefabricated bridges (establishment of
BIM kiosks).
PROJECT AREA E6 - MJØSREGIONEN

Project: E6 Kolomoen - Arnkvern E6 Arnkvern - Moelv

General contractor: Hæhre Veidekke

Consultant: Rambøll and Aas-Jakobsen Sweco

Status in use of 3D Held a meeting with the CEO (use of Held a meeting with the CEO (use of
model in bridge model for technical approval). model for technical approval).
engineering:
Planned submission of first const. as Model-based engineering from start-up.
a model for technical approval Jan
2018 .

Status in use of 3D Established professional model to be able to -


model in production: retrieve stitching data.

Planned to use the model as a work Planned to use the model as a work
basis (establishment of «BIM kiosks») basis (establishment of «BIM kiosks»)
E6 Berg Bru
E6 Berg Bru
E6 Berg Bru
E6 Berg Bru
The client's intention with BIM

• Streamline processesthrough
digitization of the entire value chain

• Increase seriousness and quality


through transparency

http://www.bygg.no/article/1309598
Thank you for your attention