MANNER OF FINANCING
The cost will be based on the current market price assessments and
estimated values of construction materials, equipment and professional fees that
will give computation of the possible funds needed for the proposed Las Puentes
de Camalig: A Cultural Heritage Retreat and Tourism Complex.
113
Table no. 31 - Building Cost
TOTAL AREA COSTRUCTION
BUILDING TOTAL COST
(SQ.M.) COST (PHP)
Spa Building 899.08 20,000 17,981,600.00
Amphitheater 358.80 20,000 7,176,000.00
Maintenance/Utility
160.810 15,000 2,412,150.00
Building
Function Hall 442.650 20,000 8,853,000
Worship Hall
Staff House
Public Toilet 18.655 15,000 279,825.00
APPROXIMATE BUILDING CONSTRUCTION COST ₱ 109,066,925.00
Based on the UAP DOC. 202, the proposed project falls under Group 3,
which is classified as an “exceptional structure”. It requires 4 Million + 7% of
excess of 50 million of the Project Construction Cost ranging from P50 million –
P100,000 million.
114
Table no. 34 - Professional Fee
PERCENTAGE OF
APPROXIMATE BUILDING MINIMUM BASIC FEE TOTAL
CONSTRUCTION COST (Over 100-200 PROFESSIONAL FEE
Million)
7.5 Million + 6% of
₱ 109,066,925.00 ₱ 8,044,015.50
excess of 100 million
The following are the rentals or fee for guest accommodations and
facilities of the proposed Las Puentes de Camalig: A Cultural Heritage Retreat
and Tourism Complex. The researchers multiplied the number of users of each
building to it’s corresponding income or rentals, the answer is then multiplied
again into the assumed number of 365 days to get the annual income.
115
Table no. 37 - Source of Income
USER
BUILDING RENTAL/FEE ANNUAL INCOME
(PER DAY)
3,000 (over-all
Worship Hall 100 rental fee x 48 144,000.00
(weeks)
Spa Building 100 300 per head 10,950,000
10,000 (over-all
Amphitheater 150 rental fee x 48 480,000.00
(weeks)
15,000 (over-all
Function Hall 150 rental fee x 48 720,000.00
(weeks)
TOTAL INCOME ₱ 22,696,500.00
Assuming that every day, the facilities cater its targeted users per day.
(5 Full
Group Bunker (25 pax) bunkers per 900 per head 41,062,500.00
year)
LEAN SEASON (188 DAYS)
VIP Suite (6 pax) 6 1,500 per head 3,384,000.00
Cabin Type 1 (1-3 pax) 3 1,000 per head 6,768,000.00
Cabin Type 2 (4-6 pax) 6 1,000 per head 5,640,000.00
Group Bunker, (7-10
pax) 10 900 per head 3,384,000.00
116
8.3.1 OPERATIONAL COST
117
8.3.3 MARKETING EXPENSES
118