COMMENTS RESOLUTION SHEET

EPC FOR MISCELLANEOUS WORKS AT TPO


EPC FOR ADCOP EIA STUDY RECOMMENDATIONS BALANCE OF WORK (PACKAGE 4)

Contract No: 4700018647 Project No. P24019 Comment Code 2


1. Approved - no comments
Document Number Transmittal No. / Document Title
✘ 2.Approved with comments-resubmit
Rev. No. TR-P24019-4700018647-MCS-0295 / SPILL RESPONSE EQUIPMENT
P24019-30-99-97-1620 RECOMMENDATIONS
2

Sl. ADNOC Onshore


Reference / Page No. ADNOC Onshore Comments CONTRACTOR/VENDOR Response
No. Remarks

Refer oil spill specialist comments on transmittal remarks


1 Page 1 of 25 HSE
regarding serious concerns about burning sorbents at site

The next revision of document shall be issued after final


approval of specs, data sheets and drawings. Currently,
2 Page 1 of 25 Noted
the document has inconsistent info.. Consistency shall be
ensured with other Project docs. and drawings.

3 Page 6 of 25 Noted and deleted.

(Add)
4 Page 6 of 25 Noted and included.
1. Datasheet for Oil Recovery Pump Skid Packages

Page 1 of 4
5 Page 6 of 25 Noted and included.

(Add)
1. IEC Codes & Standards relevant to Electrical items
6 Page 6 of 25 such as Battery, Diesel Engine Alternator. Noted and included.
2. Diesel Engine Standards.
3. Trailer related datasheet.

7 Page 10 of 25 Provide Project number with the doc. no. Noted and included.

8 Page 13 of 25 HSE

9 Page 16 of 25 Make sure all abbreviations are added in relevant section Noted and included.

10 Page 17 of 25 Noted and updated.

Page 2 of 4
Where will be this CAR SERVICE CENTRE available for
11 Page 18 of 25 cleaning the oil recovery pumps, bladders etc? Is it
available at MOT & IPS? If not, who will provide this?

Page 18 of 25 Noted and included.

Page 18 of 25 Provide locations of container Noted and included.

CONTRACTOR shall ensure consistency of this


Page 18 of 25 information and all information within this doc. with other Noted
Project Specs, Data Sheets, Docs. and drawings

Page 18 of 25 Is this flat? Provide clearly where flat hoses will be used Noted and included.

Refer comments on end connections in other docs. and


Page 19 of 25
align all docs.

Page 20 of 25 Noted and updated.

Page 20 of 25

Page 22 of 25 All the categories as per SOW shall be listed Noted and included

Page 3 of 4
Is the burning of used absorbents at site allowed as per
Page 23 of 25 HSE
ADNOC HSE standards? Check

APPENDIX -1: LIST OF


OIL SPILL RESPONSE Noted and updated.
EQUIPMENT

APPENDIX -1: LIST OF


Refer MARs and attach in this document scope of work
OIL SPILL RESPONSE Noted and included.
list provided to CONTRACTOR
EQUIPMENT
Typical Comment:
APPENDIX -1: LIST OF
Contractor to check as this equipment list is not matching
OIL SPILL RESPONSE
with list provided along with SOW and other Tender
EQUIPMENT
documents.

ORIGINATOR REVIEWED BY: APPROVED BY:

Name: RMS Name: ASS Name: AS

Signature
Signature: Signature:

Date: 12-Feb-2024 Date: 12-Feb-2024 Date: 12-Feb-2024

Page 4 of 4