P24019-30-99-97-1620 Rev. 3 - CRS
P24019-30-99-97-1620 Rev. 3 - CRS
(Add)
4 Page 6 of 25 Noted and included.
1. Datasheet for Oil Recovery Pump Skid Packages
Page 1 of 4
5 Page 6 of 25 Noted and included.
(Add)
1. IEC Codes & Standards relevant to Electrical items
6 Page 6 of 25 such as Battery, Diesel Engine Alternator. Noted and included.
2. Diesel Engine Standards.
3. Trailer related datasheet.
7 Page 10 of 25 Provide Project number with the doc. no. Noted and included.
8 Page 13 of 25 HSE
9 Page 16 of 25 Make sure all abbreviations are added in relevant section Noted and included.
Page 2 of 4
Where will be this CAR SERVICE CENTRE available for
11 Page 18 of 25 cleaning the oil recovery pumps, bladders etc? Is it
available at MOT & IPS? If not, who will provide this?
Page 18 of 25 Is this flat? Provide clearly where flat hoses will be used Noted and included.
Page 20 of 25
Page 22 of 25 All the categories as per SOW shall be listed Noted and included
Page 3 of 4
Is the burning of used absorbents at site allowed as per
Page 23 of 25 HSE
ADNOC HSE standards? Check
Signature
Signature: Signature:
Page 4 of 4