You are on page 1of 1

CERTIFIED BY: (Signature & Seal) SHEET CONTENT: NOTES: PROJECT TITLE: APPROVED BY: NO.

PROJECT TITLE: APPROVED BY: NO.: REVISION DATE: CAD BY: SHEET NO.:
WRITTEN DIMENSIONS ON THESE
DRAWINGS SHALL HAVE PRECEDENCE
OVER SCALED DIMENSIONS.
Master Plumber CONTRACTORS SHALL VERIFY AND BE DATE:
RESPONSIBLE FOR ALL DIMENSIONS
AND CONDITIONS ON THE JOB. THE

P-1
VALIDITY: DESIGNER MUST BE NOTIFIED
PRC NO.:
IMMEDIATELY OF ANY VARIATIONS
FROM THE DIMENSIONS AND CHECKED BY:
CONDITIONS SHOWN BY THESE
PTR NO.: DATE ISSUED: DRAWINGS. ANY DISCREPANCY ON ALL
DRAWINGS AND SPECIFICATIONS OWNER
(ARCHITECTURAL, STRUCTURAL,
SANITARY, ELECTRICAL, MECHANICAL.)
PLACE ISSUED: DATE:
TIN NO.: SHALL BE SUBJECT FOR VERIFICATION. LOCATION: ADDRESS:

You might also like