You are on page 1of 2
7111723, 2381 PM [WEPICXCR-3989] VIA OV Bug Repor Integration In Data Hub [EPICXCR-3989] IQVIA OV Bug Report Integration In Data Hub crs zunaseeaM pseu 12535 Status: INITIAL SCREENING Project: EpICK CR Requests Component/s: None Fox Version/s: None Type: Change Request Critical Reporter: ‘Vaishali Knodajbhal Dobaria Mandar Lokhande Resolution: Unresolved ° Labels: 'AT2, MDM,NA, OCEO_NA, OM_NA Remaining Estimate: Not Specified Time Spent: Not Specified Original Estimate: Not Specified ‘Attachments: Final Reportzip Issue Links: Belongs belong to ICXCR-4044 _IQVIA OV Bug Report Integration In Da Open Isbelong to EPICK-39760__—_IQVIA OV Bug Report Integration In Da, Ready for refinement © increw oubinsky Integration Sprint: 'AT2 CRs heaton 2, AT2 CRs heaton 3 Go/No-Go for assessment: [ ]* OCE-? [Tt oceo Lito L 1* OcE Optimizer [1* Mom CT tes [ 1*Ro1cIM LI Frac Cita E+ imegrations L1* analytics [ 1* Data Lake [1* Datarub T 1* Veews Promomat C1" engage Capability / Business Data hub process Hi QVIA has prepared an OV bug report which highlights the issues in the OV files sent by them. They will send ths port dally along with the Ov fles, This report contains a count of records which have a data qualty issue, Raw data, along withthe bug identifier, Data hub team needs te decide the following Inthe report shared by IQVIA‘s ina usable/consumable format If not then need to coordinate with IQVIA to madly the format 2, How to consume/integrate ths report in their system, 50 the records having the data quality issues does not flow/impact the downstream systems, {Comment by Agnieszka Kiner sanmnvenr4eu) ‘Mandar Lokhande to look int this. (Comment by Turu Manjunath 2or23 63550 ‘The CORE DATA team is flagging this CR with label as MDM,NA as ths is not applicable to CORE MDM or LEXI Comment by ai Yan Kong tino 8560.) hips ira roche comiralsiira issuoviews issu-himllEPIGXCR-3963/EPICXCR-3989, html 42 7111723, 2381 PM [WEPICXCR-3989) VIA OV Bug Repor Integration In Data Hub “The CRis flagged as OM_NA and OCEO.NA as it's not applicable to Core OM/Optimizer. Please comment ifyou think otherwise. ‘Comment by Ken Hachenberger 261.923 823098) ‘Andrew Dubinsky - please look into the request. ‘Comment by Mandar Lokhande uns 2241 'As per discussion and confermation by Ayush Bhardwa) , DH team needs to de two things, 1. The data hub team needs to assess the format of the OV bug report. Ifthe format is not usable, then the team needs to coordinate with IQVIA to modi the format 2. Once the format ofthe report is agreed upon, the data hub team needs to develop a process for consuming and integrating the report into their system. This process should ensure thatthe records with data qual issues are not abe to flow tothe downstream systems. FYL Agnieszka Kiner Generated at Tue Jul 11 11:01:37 CEST 2023 by Mandar Loknande using lira 8 22 4#622004-sha1:4514011726*7a8d? 16084a48dBd485de531950c8. -ntps:jra roche. comijralsifjiraissueviows issue-timVEPIOXCR-3989/EPICXCR. 3988 inl 22

You might also like