You are on page 1of 3

FORM REKAP ABSENSI PEKERJA HARIAN EKSTERIOR

PROYEK PEMBANGUNAN GEDUNG PT. NOVELL PHARMACEUTICAL LABORATORIES


PALEMBANG - SUMATERA SELATAN

PERIODE : 02 Agustus 2021 - 08 Agustus 2021

DATE OF
NO NAME POSITION 02 Agustus 2021 03 Agustus 2021 04 Agustus 2021 05 Agustus 2021 06 Agustus 2021 07 Agustus 2021 08 Agustus 2021 REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 RUDI WAKIL MANDOR 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2 KUSNADI TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3 SUPRANTO TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
4 SAMSURI TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
5 YAYIT TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
6 HARIYADI TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
7 PADMONO TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
8 MUGI TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
9 JAYAKA TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
10 SYARIF H. TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
11 SARYANI TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
12 FIRDAUS TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
13 DAVID TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
14 DALES TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
15 PARTONO TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
16 SURATMAN TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
17 AGUNG KENEK 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
18 RONI KENEK 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
19 ADE SAPUTRA KENEK 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
20 CECEP S. KENEK 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
21 YOGA KENEK 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Total 21.00 21.00 21.00 21.00 21.00 21.00 21.00 21.00 21.00 21.00 19.00 0.00 18.00 0.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 16:00

JOB DESCRIPTIONS SUMMARY :


1. Backfill
2. Injeksi dinding dan plester dinding sisi luar basement
3. Penebalan dan plester balok Lt.1 dan ramp
4. Acian penutup stek kolom Lt. Atap
5. Sealant jendela Lt. 1
6. Compound partisi gypsum Lt. 1

Prepared by, Checked By, Approved by,

Zama Hudaya Radhitya Putra A. Nano Suratno Arief Tirtanegara


OPNAME UPAH TUKANG HARIAN EKSTERIOR
PROYEK PEMBANGUNAN GEDUNG PT. NOVELL PHARMACEUTICAL LABORATORIES
PALEMBANG - SUMATERA SELATAN

PERIODE : 02 Agustus 2021 s/d 08 Agustus 2021

TIME
UNIT PRICE TOTAL PRICE
02 Agustus 2021 03 Agustus 2021 04 Agustus 2021 05 Agustus 2021 06 Agustus 2021 07 Agustus 2021 08 Agustus 2021
NO NAME REMAKS
NORMAL TIME NORMAL
OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT OVER TIME
(NT) TIME
1 RUDI 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
2 KUSNADI 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
3 SUPRANTO 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
4 SAMSURI 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
5 YAYIT 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
6 HARIYADI 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
7 PADMONO 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
8 MUGI 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - - - 780,000 650,000
9 JAYAKA 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
10 SYARIF H. 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
11 SARYANI 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
12 FIRDAUS 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
13 DAVID 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - - 1.00 - 780,000 650,000
14 DALES 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - - - 780,000 650,000
15 PARTONO 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
16 SURATMAN 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 910,000 650,000
17 AGUNG 115,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 805,000 575,000
18 RONI 115,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 805,000 575,000
19 ADE SAPUTRA 115,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - - 1.00 - 690,000 575,000
20 CECEP S. 115,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - - - 690,000 575,000
21 YOGA 115,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - 805,000 575,000

Sub - Total 17,965,000 13,275,000


Total 31,240,000
Pot. PPh 4% (1,249,600)
Grand Total (i) 29,990,400

NOTE :
Harian Tukang : Rp 130.000,-
Harian Asst. Tukang / Kenek : Rp 115.000,-

Prepared by, Checked By, Approved by,

Zama Hudaya Radhitya Putra A. Nano Suratno Arief Tirtanegara


MONITORING PEKERJAAN OPNAME HARIAN
PERIODE : 2-Aug-21 s/d 8-Aug-21
PROYEK : Palembang, Sumatera Selatan

NO SUB-PEKERJAAN JUMLAH OPNAME KETERANGAN

1 PEKERJAAN TANAH
1.1 Back fill / Urugan kembali Rp 8,101,000

2 PEKERJAAN EKSTERIOR
2.1 Pekerjaan Pagar Keliling
- Pagar dinding bata ringan
- Pagar Spandek

2.2 Pekerjaan Gerbang


- Landasan gerbang
- Pintu gerbang

2.3 Pekerjaan Landscape


- Leveling dan pemadatan
- Paving block
- Planter box

2.4 Saluran Keliling Bangunan


- Saluran buis beton
- Bak kontrol

2.5 Dudukan Mesin


- Dudukan genset (2 x 3,5 x 0,6 m)
- Dudukan ATS (1 x 0,8 x 0,6 m)
- Dudukan pompa Hydrant (1,5 x 0,8 x 0,6 m)
- Dudukan tangki solar (1,75 x 1,75 x 1,6 m)

2.6 Bio Tank


- Biotank 4000 Liter (B. Utama)
- Biotank 1000 Liter (Ruko)
- Septic tank Pos security

2.7 Pekerjaan Lain-lain


- Karet loading dock
- Pembersihan dan perapihan

3 PEKERJAAN STRUKTUR
3.1 Beton K300 Dinding basement Rp 5,492,250 Injeksi dinding dan plester dinding sisi luar
3.2 Beton K300 Balok Lt.1 Rp 1,456,000 Penebalan dan plester balok
3.3 Baton K300 Balok Ramp Rp 1,934,750 Penebalan dan plester balok

4 PEKERJAAN ARSITEKTUR
4.1 Screed Lt. Atap Rp 3,516,000
4.2 Floor Hardener Liquid Rp 4,616,000
4.3 Keramik 40x40 Lt. Atap Rp 2,116,000
4.4 Acian dinding Lt. Atap Rp 416,000 Penutup stek kolom Lt. Atap

5 PEKERJAAN INTERIOR
5.1 Pintu dan Jendela Lt. 1 Rp 676,000 Sealant
5.2 Partisi gypsum Lt. 1 Rp 416,000 Compound

TOTAL Rp 28,740,000