You are on page 1of 4

FORM REKAP ABSENSI PEKERJA HARIAN EKSTERIOR

PROYEK PEMBANGUNAN GEDUNG PT. NOVELL PHARMACEUTICAL LABORATORIES


PALEMBANG - SUMATERA SELATAN

PERIODE : ### - Sunday, July 4, 2021

DATE OF
NO NAME POSITION ### ### ### Thursday, July 1, 2021 Friday, July 2, 2021 Saturday, July 3, 2021 Sunday, July 4, 2021 REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 RUDI WAKIL MANDOR 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
2 KUSNADI TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3 SUPRANTO TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
4 ROBIN TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
5 SAMSURI TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
6 DALES TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
7 YUSRON TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
8 YOGA TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
9 ANDERI Asst. TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
10 SELAMET Asst. TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
11 DIMAS Asst. TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
12 AGUNG Asst. TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
13 RONI Asst. TUKANG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
14 MUGIK TUKANG 1.00 1.00 1.00 1.00

Total 13.000 13.000 13.000 13.000 13.000 13.000 13.000 13.000 14.000 14.000 14.000 0.000 14.000 0.000

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 16:00

JOB DESCRIPTIONS SUMMARY :


1. Muat besi hollow ke truk
2. Backfill dan perataan tanah
3. Pekerjaan dinding pagar keliling
4. Bongkar toilet dan bedeng
5. Pek. Dudukan genset
6. Pek. Dudukan solar

Prepared by, Checked By, Approved by,

Zama Hudaya Radhitya Putra A. Nano Suratno Arief Tirtanegara


OPNAME UPAH TUKANG HARIAN EKSTERIOR
PROYEK PEMBANGUNAN GEDUNG PT. NOVELL PHARMACEUTICAL LABORATORIES
PALEMBANG - SUMATERA SELATAN

PERIODE : ### s/d ###

TIME
UNIT PRICE TOTAL PRICE
### ### ### ### ### ### ###
NO NAME REMAKS
NORMAL TIME NORMAL
OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT OVER TIME
(NT) TIME
1 RUDI 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 910,000 650,000
2 KUSNADI 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 910,000 650,000
3 SUPRANTO 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 910,000 650,000
4 ROBIN 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 910,000 650,000
5 SAMSURI 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 910,000 650,000
6 DALES 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 910,000 650,000
7 YUSRON 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 910,000 650,000
8 YOGA 130,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 910,000 650,000
9 ANDERI 115,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 805,000 575,000
10 SELAMET 115,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 805,000 575,000
11 DIMAS 115,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 805,000 575,000
12 AGUNG 115,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 805,000 575,000
13 RONI 115,000 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 805,000 575,000
14 MUGIK 130,000 1.00 1.00 1.00 1.00
Sub - Total 11,305,000 8,075,000
Total 19,380,000
Pot. PPh 4% (775,200)
Grand Total (i) 18,604,800

NOTE :
Harian Tukang : Rp 130.000,-
Harian Asst. Tukang / Kenek : Rp 115.000,-

Prepared by, Checked By, Approved by,

Zama Hudaya Radhitya Putra A. Nano Suratno Arief Tirtanegara


PERIODE : ### s/d ###

TIME
UNIT PRICE TOTAL PRICE
NO NAME ### ### ### ### ### ### ### 238333.333
NORMAL TIME OVER TIME NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME 260,000 130,000 115,000
1 RUDI 130,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 910,000 650,000 1,560,000 PEKERJAAN TANAH
2 KUSNADI 130,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 910,000 650,000 Back fill / Urugan kembali 5,720,000 115,000 5,835,000 6,073,333
3 SUPRANTO 130,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 910,000 650,000
4 ROBIN 130,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 910,000 650,000 PEKERJAAN EKSTERIOR
5 SAMSURI 130,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 910,000 650,000 Pekerjaan Pagar Keliling
6 DALES 130,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 910,000 650,000 Pagar dinding bata ringan 2,340,000 2,185,000 4,525,000 4,763,333
7 YUSRON 130,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 910,000 650,000 Pagar Spandek - - - -
8 YOGA 130,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 910,000 650,000
9 ANDERI 115,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 805,000 575,000 Pekerjaan Gerbang
10 SELAMET 115,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 805,000 575,000 Landasan gerbang - - -
11 DIMAS 115,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 805,000 575,000 Pintu gerbang - - -
12 AGUNG 115,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 805,000 575,000
13 RONI 115,000 1 1 1 1 1 1 1 1 1 1 1 - 1 - 805,000 575,000 Pekerjaan Landscape
Leveling dan pemadatan 910,000 1,610,000 2,520,000 2,758,333
Sub - Total 11,305,000 8,075,000 Paving block - - -
Total 19,380,000 Planter box - - -

Saluran Keliling Bangunan


Saluran buis beton - - -
Bak kontrol - - -

Dudukan Mesin
Dudukan genset (2 x 3,5 x 0,6 m) - 805,000 805,000 1,043,333
Dudukan ATS (1 x 0,8 x 0,6 m) - - -
Dudukan pompa Hydrant (1,5 x 0,8 x 0,6 m) - - -
Dudukan tangki solar (1,75 x 1,75 x 1,6 m) 520,000 920,000 1,440,000 1,678,333

Bio Tank
Biotank 4000 Liter (B. Utama) - - -
Biotank 1000 Liter (Ruko) - - -
Septic tank Pos security - - -

Pekerjaan Lain-lain
Karet loading dock - - -
Pembersihan dan perapihan pasca pekerjaan 520,000 690,000 1,210,000 1,448,333

PEKERJAAN ARSITEKTUR
Plumbing & Sanitary - - -
16,335,000 17,765,000
(3,045,000) (1,615,000)
MONITORING PEKERJAAN OPNAME HARIAN
PERIODE : 28-Jun-21 s/d 4-Jul-21
PROYEK : Palembang, Sumatera Selatan

NO SUB-PEKERJAAN JUMLAH OPNAME KETERANGAN

1 PEKERJAAN TANAH
1.1 Back fill / Urugan kembali Rp 6,073,333

2 PEKERJAAN EKSTERIOR
2.1 Pekerjaan Pagar Keliling
- Pagar dinding bata ringan Rp 4,763,333
- Pagar Spandek

2.2 Pekerjaan Gerbang


- Landasan gerbang
- Pintu gerbang

2.3 Pekerjaan Landscape


- Leveling dan pemadatan Rp 2,758,333
- Paving block
- Planter box

2.4 Saluran Keliling Bangunan


- Saluran buis beton
- Bak kontrol

2.5 Dudukan Mesin


- Dudukan genset (2 x 3,5 x 0,6 m) Rp 1,043,333
- Dudukan ATS (1 x 0,8 x 0,6 m)
- Dudukan pompa Hydrant (1,5 x 0,8 x 0,6 m)
- Dudukan tangki solar (1,75 x 1,75 x 1,6 m) Rp 1,678,333

2.6 Bio Tank


- Biotank 4000 Liter (B. Utama)
- Biotank 1000 Liter (Ruko)
- Septic tank Pos security

2.7 Pekerjaan Lain-lain


- Karet loading dock
- Pembersihan dan perapihan Rp 1,448,333 *bongkar bedeng dan MCK

TOTAL Rp 17,765,000