You are on page 1of 35

FORM ABSENSI PEKERJA HARIAN

PROYEK PEMBANGUNAN GEDUNG PT. NPL


CABANG KOTA PALEMBANG - SUMATERA SELATAN

DATE OF ……………………….
NO NAME POSITION REMAKS
IN (AM) SIGN OFF OUT (PM) SIGN OFF

JOB DESCRIPTION

1 ……………………………………………………………………………………………………………………………………

2 ……………………………………………………………………………………………………………………………………

3 ……………………………………………………………………………………………………………………………………

4 ……………………………………………………………………………………………………………………………………

5 ……………………………………………………………………………………………………………………………………

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Didi hartanto Radhitya Putra Nano Suratno


FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### ###

DATE OF

NO NAME POSITION Thursday, February 20, 2020 ### ### ### Monday, February 24, 2020 ### DD/MM/YY REMAKS

NT OT NT OT NT OT NT OT NT OT NT OT NT OT

1 KUSWANTO KEPALA TUKANG 1 0.25 1 0.25 1 0.25 1 0.25

2 JUMADI TUKANG 1 0.25 1 0.25 1 0.25 1 0.25

3 TEGUH TUKANG 1 0.25 1 0.25 1 0.25 1 0.25

4 JONO TUKANG 1 0.25 1 0.25 1 0.25 1 0.25

5 YATIRAN TUKANG 1 0.25 1 0.25 1 0.25 1 0.25

Total 5 1.25 5 1.25 5 1.25 5 1.25

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### ###

DATE OF

NO NAME POSITION Monday, February 24, 2020 ### ### ### Friday, February 28, 2020 ### Sunday, March 1, 2020 REMAKS

NT OT NT OT NT OT NT OT NT OT NT OT NT OT

1 KUSWANTO KEPALA TUKANG 1 1 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25

2 JUMADI TUKANG 1 1 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25

3 TEGUH TUKANG 1 1 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25

4 JONO TUKANG 1 1 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25

5 YATIRAN TUKANG 1 1 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25

Total 5 5 5 1.25 5 1.25 5 1.25 5 1.25 5 1.25 5 1.25

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


OPNAM UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

Periode ### ###

TIME
UNIT PRICE TOTAL PRICE REMAKS
2/20/2020 2/21/2020 2/22/2020 2/23/2020 2/24/2020 2/25/2020 2/26/2020 2/27/2020 2/28/2020
NAME
NORMAL TIME
OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME
(NT)
KUSWANTO 125,000.00 1 0.25 1 0.25 1 0.25 1 0.25 500,000.00 125,000.00
JUMADI 125,000.00 1 0.25 1 0.25 1 0.25 1 0.25 500,000.00 125,000.00
TEGUH 125,000.00 1 0.25 1 0.25 1 0.25 1 0.25 500,000.00 125,000.00
JONO 125,000.00 1 0.25 1 0.25 1 0.25 1 0.25 500,000.00 125,000.00
YATIRAN 125,000.00 1 0.25 1 0.25 1 0.25 1 0.25 500,000.00 125,000.00
- -

Sub - Total 2,500,000.00 625,000.00


Grand Total 3,125,000.00 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


OPNAM UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

Periode ### ###

TIME
UNIT PRICE TOTAL PRICE REMAKS
2/24/2020 2/25/2020 2/26/2020 2/27/2020 2/28/2020 2/29/2020 3/1/2020 3/2/2020 3/3/2020
NAME
NORMAL TIME
OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME
(NT)
KUSWANTO 125,000.00 1 1 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 875,000.00 312,500.00
JUMADI 125,000.00 1 1 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 875,000.00 312,500.00
TEGUH 125,000.00 1 1 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 875,000.00 312,500.00
JONO 125,000.00 1 1 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 875,000.00 312,500.00
YATIRAN 125,000.00 1 1 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 1 0.25 875,000.00 312,500.00
- -

Sub - Total 4,375,000.00 1,562,500.00


Grand Total 5,937,500.00 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### ###

DATE OF
NO NAME POSITION Monday, March 2, 2020 ### ### ### ### ### ### REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 KUSWANTO KEPALA TUKANG 0 0.00 0.75 0.25 0.63 0.25 1.00 0.25 1.00 0.25 1.00 0.25 1.00 0.25
2 JUMADI TUKANG 0 0.00 0.75 0.25 0.63 0.25 1.00 0.25 1.00 0.25 1.00 0.25 1.00 0.25
3 TEGUH TUKANG 0 0.00 0.75 0.25 0.63 0.25 1.00 0.25 1.00 0.25 1.00 0.25 1.00 0.38
4 JONO TUKANG 0 0.00 0.75 0.25 0.63 0.25 1.00 0.25 1.00 0.25 1.00 0.25 1.00 0.25
5 YATIRAN TUKANG 0 0.00 0.75 0.25 0.63 0.25 1.00 0.25 1.00 0.25 1.00 0.25 1.00 0.25

Total 0 0.00 3.75 1.25 3.13 1.25 5.00 1.25 5.00 1.25 5.00 1.25 5.00 1.38

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### ###

DATE OF
NO NAME POSITION Monday, March 9, 2020 ### ### ### ### ### ### REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 KUSWANTO KEPALA TUKANG 1 0.25 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.25 0.63 0.25 1.00 0.25
2 JUMADI TUKANG 1 0.25 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.25 0.63 0.25 1.00 0.25
3 TEGUH TUKANG 1 0.25 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.25 1.00 0.50
4 JONO TUKANG 1 0.25 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.25 0.63 0.25 1.00 0.25
5 YATIRAN TUKANG 1 0.25 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.25 1.00 0.50

Total 5 1.25 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1.25 1.88 0.75 5.00 1.75

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


OPNAM UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

Periode Monday, March 2, 2020 Sunday, March 8, 2020

TIME
UNIT PRICE TOTAL PRICE REMAKS
3/2/2020 3/3/2020 3/4/2020 3/5/2020 3/6/2020 3/7/2020 3/8/2020
NAME

NORMAL TIME (NT) OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME

KUSWANTO 125,000.00 0.75 0.25 0.63 0.25 1 0.25 1 0.25 1 0.25 1 0.25 671,875.00 187,500.00
JUMADI 125,000.00 0.75 0.25 0.63 0.25 1 0.25 1 0.25 1 0.25 1 0.25 671,875.00 187,500.00
TEGUH 125,000.00 0.75 0.25 0.63 0.25 1 0.25 1 0.25 1 0.25 1 0.375 671,875.00 203,125.00
JONO 125,000.00 0.75 0.25 0.63 0.25 1 0.25 1 0.25 1 0.25 1 0.25 671,875.00 187,500.00
YATIRAN 125,000.00 0.75 0.25 0.63 0.25 1 0.25 1 0.25 1 0.25 1 0.25 671,875.00 187,500.00
-

Sub - Total 3,359,375.00 953,125.00


Grand Total 4,312,500.00 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


OPNAM UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

Periode Monday, March 9, 2020 ###

TIME
UNIT PRICE TOTAL PRICE REMAKS
3/9/2020 3/10/2020 3/11/2020 3/12/2020 3/13/2020 3/14/2020 3/15/2020
NAME
NORMAL TIME (NT) OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME

KUSWANTO 125,000.00 1 0.25 1.00 0.25 0.63 0.25 1.00 0.25 453,125.00 125,000.00
JUMADI 125,000.00 1 0.25 1.00 0.25 0.63 0.25 1.00 0.25 453,125.00 125,000.00
TEGUH 125,000.00 1 0.25 1.00 0.25 1.00 0.50 375,000.00 125,000.00
JONO 125,000.00 1 0.25 1.00 0.25 0.63 0.25 1.00 0.25 453,125.00 125,000.00
YATIRAN 125,000.00 1 0.25 1.00 0.25 1.00 0.50 375,000.00 125,000.00

Sub - Total 2,109,375.00 625,000.00


Grand Total Rp 2,734,375 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


OPNAM UPAH TUKANG PEKERJAAN EKSTERNAL
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

Periode ### Sunday, March 8, 2020

TIME
UNIT PRICE TOTAL PRICE REMAKS
NAME 3/2/2020 3/3/2020 3/4/2020 3/5/2020 3/6/2020 3/7/2020 3/8/2020
NORMAL TIME (NT) OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME
KUSWANTO 125,000.00 1.00 0.25 0.25 0.38 203,125.00 31,250.00
JUMADI 125,000.00 1.00 0.25 0.25 0.38 203,125.00 31,250.00
TEGUH 125,000.00 1.00 0.25 0.25 0.38 203,125.00 31,250.00
JONO 125,000.00 1.00 0.25 0.25 0.38 203,125.00 31,250.00
YATIRAN 125,000.00 1.00 0.25 0.25 0.38 203,125.00 31,250.00
-

Sub - Total 1,015,625.00 156,250.00


Grand Total 1,171,875.00 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


OPNAM UPAH TUKANG PEKERJAAN EKSTERNAL
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

Periode ### ###

TIME
UNIT PRICE TOTAL PRICE REMAKS
NAME 3/9/2020 3/10/2020 3/11/2020 3/12/2020 3/13/2020 3/14/2020 3/15/2020
NORMAL TIME (NT) OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME
KUSWANTO 125,000.00 1 0.25 1 0.25 1 0.25 0.63 0 453,125.00 93,750.00
JUMADI 125,000.00 1 0.25 1 0.25 1 0.25 0.63 0 453,125.00 93,750.00
TEGUH 125,000.00 1 0.375 1 0.375 1 0.375 375,000.00 140,625.00
JONO 125,000.00 1 0.25 1 0.25 1 0.25 0.63 0 453,125.00 93,750.00
YATIRAN 125,000.00 1 0.25 1 0.25 1 0.25 375,000.00 93,750.00

Sub - Total 2,109,375.00 515,625.00


Grand Total Rp 2,625,000 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### ###

DATE OF
NO NAME POSITION Monday, March 30, 2020 ### ### ### Friday, April 3, 2020 ### Sunday, April 5, 2020 REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 KUSWANTO KEPALA TUKANG 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25
2 JUMADI TUKANG 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25
3 JONO TUKANG 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25
4 NASEM TUKANG 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25
5 ISKAK TUKANG 1.00 1.00 1.00 0.38 1.00 1.00 1.00 0.38 1.00 0.38 1.00 1.00 1.00 0.38
6 NARTO TUKANG 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25
7 EDI TUKANG 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25
8 TEGUH TUKANG 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25

Total 8 8.00 8.00 2.13 8.00 8.00 8.00 2.13 8.00 2.13 8.00 8.00 8.00 2.13

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### ###

DATE OF
NO NAME POSITION Monday, April 6, 2020 ### ### ### Friday, April 10, 2020 ### ### REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 KUSWANTO KEPALA TUKANG 1.00 1.00 1.00 1.00 1.00 0.25 1.00 0.25 1.00 0.25
2 JUMADI TUKANG 1.00 1.00 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50
3 JONO TUKANG 1.00 1.00 1.00 0.25 1.00 0.25 1.00 0.25 1.00 0.25
4 NASEM TUKANG 1.00 1.00 1.00 0.38 1.00 0.38 1.00 0.38 1.00 0.38
5 ISKAK TUKANG 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00 0.50
6 NARTO TUKANG 1.00 1.00 1.00 0.25 1.00 0.25 1.00 0.25 1.00 0.25
7 EDI TUKANG 1.00 1.00 1.00 0.25 1.00 0.25 1.00 0.25 1.00 0.25
8 TEGUH TUKANG 1.00 1.00 1.00 1.00 1.00 0.25 1.00 0.25 1.00 0.25

Total 8 8.00 8.00 4.63 8.00 2.63 8.00 2.63 0.00 0.00 8.00 2.63 0.00 0.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


OPNAM UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

Periode ### ###

TIME
UNIT PRICE TOTAL PRICE REMAKS
### ### ### ### Friday, April 3, 2020 ### Sunday, April 5, 2020
NAME
NORMAL TIME OVER TIME NORMAL
NT OT NT OT NT OT NT OT NT OT NT OT NT OT OVER TIME
(NT) (OT) TIME
KUSWANTO 125,000.00 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25 875,000.00 500,000.00
JUMADI 125,000.00 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25 875,000.00 500,000.00
JONO 125,000.00 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25 875,000.00 500,000.00
NASEM 125,000.00 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25 875,000.00 500,000.00
ISKAK 125,000.00 1.00 1.00 1.00 0.38 1.00 1.00 1.00 0.38 1.00 0.38 1.00 1.00 1.00 0.38 875,000.00 562,500.00
NARTO 125,000.00 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25 875,000.00 500,000.00
EDI 125,000.00 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25 875,000.00 500,000.00
TEGUH 125,000.00 1.00 1.00 1.00 0.25 1.00 1.00 1.00 0.25 1.00 0.25 1.00 1.00 1.00 0.25 875,000.00 500,000.00

Sub - Total 7,000,000.00 4,062,500.00


Grand Total 11,062,500.00 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


OPNAM UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

Periode ### ###

TIME
UNIT PRICE TOTAL PRICE REMAKS
### ### ### ### ### ### ###
NAME
NORMAL TIME OVER TIME NORMAL
NT OT NT OT NT OT NT OT NT OT NT OT NT OT OVER TIME
(NT) (OT) TIME
KUSWANTO 125,000.00 1.00 1.00 1.00 1.00 1.00 0.25 1.00 0.25 1.00 0.25 625,000.00 343,750.00
JUMADI 125,000.00 1.00 1.00 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 625,000.00 437,500.00
JONO 125,000.00 1.00 1.00 1.00 0.25 1.00 0.25 1.00 0.25 1.00 0.25 625,000.00 250,000.00
NASEM 125,000.00 1.00 1.00 1.00 0.38 1.00 0.38 1.00 0.38 1.00 0.38 625,000.00 312,500.00
ISKAK 125,000.00 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00 0.50 625,000.00 375,000.00
NARTO 125,000.00 1.00 1.00 1.00 0.25 1.00 0.25 1.00 0.25 1.00 0.25 625,000.00 250,000.00
EDI 125,000.00 1.00 1.00 1.00 0.25 1.00 0.25 1.00 0.25 1.00 0.25 625,000.00 250,000.00
TEGUH 125,000.00 1.00 1.00 1.00 1.00 1.00 0.25 1.00 0.25 1.00 0.25 625,000.00 343,750.00

Sub - Total 5,000,000.00 2,562,500.00


Grand Total Rp 7,562,500 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepair by, Checked By, Approval by,

Sugito Zama hudaya Radhitya Putra Nano Suratno Arief Tirtanegara


OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### Sunday, April 26, 2020


Sub- Pekerjaan : Sambung Pancang (Pekerjaan Tambah)

TIME
UNIT PRICE TOTAL PRICE REMAKS
Monday, April 20, 2020 ### ### ### ### ### ###
NAME
NORMAL TIME OVER TIME NORMAL
NT OT NT OT NT OT NT OT NT OT NT OT NT OT OVER TIME
(NT) (OT) TIME
KUSWANTO 125,000.00 1.000 1.000 1.000 0.250 0.500 1.000 1.000 0.250 0.500 0.000 0.250 0.250 562,500.00 312,500.00
MUHAMMAD 125,000.00 1.000 0.250 0.500 1.000 1.000 0.375 0.500 0.000 0.250 0.250 437,500.00 203,125.00
HARIANTO 125,000.00 1.000 1.000 1.000 0.250 0.500 1.000 1.000 0.250 0.500 0.000 0.250 0.250 562,500.00 312,500.00
KOKO 125,000.00 1.000 1.000 1.000 0.250 0.500 1.000 1.000 0.250 0.500 0.000 0.250 0.250 562,500.00 312,500.00
TEGUH 125,000.00 1.000 1.000 125,000.00 125,000.00

Sub - Total 2,250,000.00 1,265,625.00


Grand Total 3,515,625.00 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepared by, Checked By, Approved by,

Sugito Zama hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### Sunday, April 26, 2020


Sub- Pekerjaan : Pekerjaan Tanah

TIME
UNIT PRICE TOTAL PRICE REMAKS
Monday, April 20, 2020 ### ### ### ### ### ###
NAME
NORMAL TIME OVER TIME NORMAL
NT OT NT OT NT OT NT OT NT OT NT OT NT OT OVER TIME
(NT) (OT) TIME
KUSWANTO 125,000.00 0.500 0.500 0.250 125,000.00 31,250.00
MUHAMMAD 125,000.00 0.500 0.500 0.375 125,000.00 46,875.00
HARIANTO 125,000.00 0.500 0.500 0.250 125,000.00 31,250.00
KOKO 125,000.00 0.500 0.500 0.250 125,000.00 31,250.00
TEGUH 125,000.00 0.000 0.000 0.000 - -

Sub - Total 500,000.00 140,625.00


Grand Total 640,625.00 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepared by, Checked By, Approved by,

Sugito Zama hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### - ###


SUB-PEKERJAAN : Sambung Tiang Pancang (Pekerjaan Tambah)

DATE OF
NO NAME POSITION ### ### ### ### ### ### ### REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 KUSWANTO KEPALA TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
2 ROHMAN TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
3 TEGUH TUKANG 1.000 0.375 1.000 0.250 1.000 0.250 1.000 0.375 1.000 0.375 1.000 0.375
4 ARI TUKANG
5 DIKI TUKANG
6 MUHAMMAD TUKANG 1.000 0.375
7 JOKO TUKANG
8 AAN TUKANG
9 DAUD TUKANG
10 LUKMAN TUKANG
11 ANIK TUKANG
12 BANI TUKANG
13 SETIAWAN TUKANG
14 UJANG TUKANG
15 HARIANTO TUKANG 1.000 0.375
16 KOKO TUKANG 1.000 0.250
17 ANGGARA TUKANG
18 GANTA TUKANG

Total 4.000 1.250 3.000 0.875 3.000 0.750 3.000 0.750 3.000 0.875 3.000 0.875 3.000 0.875

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

ITEM OF WORK SUMMARY :


1. Galian tanah tiang pancang under-cast
2. Penyedotan air area galian pancang under-cast
3. Asisten surveyor, menentukan titik pancang under-cast
4.
5.

Prepared by, Checked By, Approved by,

Sugito Zama hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### - ###


SUB-PEKERJAAN : Galian Pile Cap (Pek. Tanah)

DATE OF
NO NAME POSITION ### ### ### ### ### ### ### REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 KUSWANTO KEPALA TUKANG
2 ROHMAN TUKANG
3 TEGUH TUKANG
4 ARI TUKANG 1.000 0.250 1.000 0.250 1.000 0.375 1.000 0.250
5 DIKI TUKANG 1.000 0.250 1.000 0.250 1.000 0.375 1.000 0.250
6 MUHAMMAD TUKANG 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.250 1.000 0.375
7 JOKO TUKANG 1.000 0.375 1.000 0.375 1.000 0.250 1.000 0.375
8 AAN TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.375 1.000 0.250 1.000 0.250
9 DAUD TUKANG 1.000 0.250 1.000 0.250 1.000 0.250
10 LUKMAN TUKANG 1.000 0.250
11 ANIK TUKANG 1.000 0.250
12 BANI TUKANG 1.000 0.250 1.000 0.250
13 SETIAWAN TUKANG 1.000 0.250 1.000 0.375 1.000 0.250 1.000 0.250
14 UJANG TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
15 HARIANTO TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
16 KOKO TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
17 ANGGARA TUKANG 1.000 0.250 1.000 0.250
18 GANTA TUKANG 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.250

Total 0.000 0.000 7.000 2.000 7.000 2.125 13.000 3.625 13.000 3.500 7.000 2.000 5.000 1.500

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM
angkat tiang angkat tiang lantai kerja
ITEM OF WORK SUMMARY : galian pilecap galian pilecap batako
1. Langsir tanah ex- galian pile cap pasir
2.
3.
4.
5.

Prepared by, Checked By, Approved by,

Sugito Zama hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### s/d Sunday, May 3, 2020


Sub- Pekerjaan : Sambung Tiang Pancang (Pekerjaan Tambah)

TIME
UNIT PRICE TOTAL PRICE REMAKS
NO Monday, April 27, 2020 ### ### ### Friday, May 1, 2020 Saturday, May 2, 2020 Sunday, May 3, 2020
NAME
NORMAL TIME
OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME
(NT)
1 KUSWANTO 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 875,000.00 218,750.00
2 ROHMAN 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 750,000.00 187,500.00
3 TEGUH 125,000.00 1.000 0.375 1.000 0.250 1.000 0.250 1.000 0.375 1.000 0.375 1.000 0.375 750,000.00 250,000.00
4 ARI 125,000.00 - -
5 DIKI 125,000.00 - -
6 MUHAMMAD 125,000.00 1.000 0.375 125,000.00 46,875.00
7 JOKO 125,000.00 - -
8 AAN 125,000.00 - -
9 DAUD 125,000.00 - -
10 LUKMAN 125,000.00 - -
11 ANIK 125,000.00 - -
12 BANI 125,000.00 - -
13 SETIAWAN 125,000.00 - -
14 UJANG 125,000.00 - -
15 HARIANTO 125,000.00 1.000 0.375 125,000.00 46,875.00
16 KOKO 125,000.00 1.000 0.250 125,000.00 31,250.00
17 ANGGARA 125,000.00 - -
18 GANTA 125,000.00 - -

Sub - Total 2,750,000.00 781,250.00


Grand Total 3,531,250.00 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepared by, Checked By, Approved by,

Sugito Zama hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### s/d Sunday, May 3, 2020


Sub- Pekerjaan : Galian Pile Cap (Pek. Tanah)

TIME
UNIT PRICE TOTAL PRICE REMAKS
NO Monday, April 27, 2020 ### ### ### Friday, May 1, 2020 Saturday, May 2, 2020 Sunday, May 3, 2020
NAME
NORMAL TIME
OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME
(NT)
1 KUSWANTO 125,000.00 - -
2 ROHMAN 125,000.00 - -
3 TEGUH 125,000.00 - -
4 ARI 125,000.00 1.000 0.250 1.000 0.250 1.000 0.375 1.000 0.250 500,000.00 140,625.00
5 DIKI 125,000.00 1.000 0.250 1.000 0.250 1.000 0.375 1.000 0.250 500,000.00 140,625.00
6 MUHAMMAD 125,000.00 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.250 1.000 0.375 625,000.00 218,750.00
7 JOKO 125,000.00 1.000 0.375 1.000 0.375 1.000 0.250 1.000 0.375 500,000.00 171,875.00
8 AAN 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.375 1.000 0.250 1.000 0.250 750,000.00 203,125.00
9 DAUD 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 375,000.00 93,750.00
10 LUKMAN 125,000.00 1.000 0.250 125,000.00 31,250.00
11 ANIK 125,000.00 1.000 0.250 125,000.00 31,250.00
12 BANI 125,000.00 1.000 0.250 1.000 0.250 250,000.00 62,500.00
13 SETIAWAN 125,000.00 1.000 0.250 1.000 0.375 1.000 0.250 1.000 0.250 500,000.00 140,625.00
14 UJANG 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 500,000.00 125,000.00
15 HARIANTO 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 500,000.00 125,000.00
16 KOKO 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 500,000.00 125,000.00
17 ANGGARA 125,000.00 1.000 0.250 1.000 0.250 250,000.00 62,500.00
18 GANTA 125,000.00 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.250 500,000.00 171,875.00

Sub - Total 6,500,000.00 1,843,750.00


Grand Total 8,343,750.00 Belum dikurangi PPH

Noted :
Unit Price
Tukang cor 110,000.00
Tukang kayu 125,000.00
Tukang besi 125,000.00
Tukang gali 125,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepared by, Checked By, Approved by,

Sugito Zama hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### s/d ###


Sub- Pekerjaan : Pekerjaan Pile Cap / Struktur

TIME
UNIT PRICE TOTAL PRICE REMAKS
NO NAME ### ### ### ### Friday, May 22, 2020 ### Sunday, May 24, 2020
NORMAL TIME NORMAL
OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT OVER TIME
(NT) TIME
1 ROHMAN 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 625,000.00 156,250.00
2 AAN 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 625,000.00 156,250.00
3 DAUD 125,000.00 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.250 1.000 0.250 625,000.00 203,125.00
4 AMIK 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 625,000.00 156,250.00
5 LUKMAN 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 625,000.00 156,250.00
6 EDI 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 625,000.00 156,250.00
Sub - Total 3,750,000.00 984,375.00
Grand Total 4,734,375.00 Belum dikurangi PPH

Note :
Unit Price
Tukang cor = 110,000.00 Kenek Cor = 100,000.00
Tukang kayu = 125,000.00 Kenek Kayu = 100,000.00
Tukang besi = 125,000.00 Kenek Besi = 100,000.00
Tukang gali = 125,000.00 Kenek Gali = 100,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepared by, Checked By, Approved by,

Sugito Zama hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### s/d ###


Sub- Pekerjaan : Pekerjaan Pile Cap / Struktur

TIME
UNIT PRICE TOTAL PRICE REMAKS
NO NAME ### ### ### ### Friday, May 29, 2020 ### Sunday, May 31, 2020
NORMAL TIME NORMAL
OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT OVER TIME
(NT) TIME
1 ROHMAN 125,000.00 1.000 125,000.00 -
2 ARI 125,000.00 1.000 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 625,000.00 125,000.00
3 JOKO 125,000.00 1.000 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 625,000.00 125,000.00
4 DIKI 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 500,000.00 125,000.00
5 AAN 125,000.00 1.000 1.000 0.250 1.000 0.250 375,000.00 62,500.00
6 GENTA 125,000.00 0.500 0.250 1.000 0.375 187,500.00 78,125.00
7 TEGUH 125,000.00 0.500 0.375 1.000 0.250 187,500.00 78,125.00
8 MUHAMAD 125,000.00 1.000 0.250 1.000 0.250 250,000.00 62,500.00
Sub - Total 2,875,000.00 656,250.00
Grand Total 3,531,250.00 Belum dikurangi PPH

Note :
Unit Price
Tukang cor = 110,000.00 Kenek Cor = 100,000.00
Tukang kayu = 125,000.00 Kenek Kayu = 100,000.00
Tukang besi = 125,000.00 Kenek Besi = 100,000.00
Tukang gali = 125,000.00 Kenek Gali = 100,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepared by, Checked By, Approved by,

Sugito Zama hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### s/d Sunday, June 7, 2020


Sub- Pekerjaan : Pekerjaan Struktur

TIME
UNIT PRICE TOTAL PRICE REMAKS
### ### ### ### Friday, June 5, 2020 ### Sunday, June 7, 2020
NO NAME
NORMAL TIME OVER TIME
NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME
(NT) (OT)
1 DIKI 125,000.00 1.000 2.000 1.000 0.250 1.000 0.250 1.000 1.250 1.000 0.250 1.000 0.250 1.000 1.000 875,000.00 656,250.00
2 JOKO 125,000.00 1.000 2.000 1.000 0.250 1.000 0.250 1.000 1.250 1.000 0.250 1.000 0.250 1.000 1.000 875,000.00 656,250.00
3 ARI 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 1.250 1.000 0.250 1.000 0.250 1.000 1.000 875,000.00 437,500.00
4 AAN 125,000.00 1.000 0.250 1.000 0.250 1.000 0.375 1.000 0.250 1.000 1.000 625,000.00 265,625.00
5 TEGUH 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 375,000.00 93,750.00
6 GANTA 125,000.00 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 625,000.00 234,375.00
Sub - Total 4,250,000.00 2,343,750.00
Grand Total 6,593,750.00 Belum dikurangi PPH

Note :
Unit Price
Tukang cor = 110,000.00 Kenek Cor = 100,000.00
Tukang kayu = 125,000.00 Kenek Kayu = 100,000.00
Tukang besi = 125,000.00 Kenek Besi = 100,000.00
Tukang gali = 125,000.00 Kenek Gali = 100,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepared by, Checked By, Approved by,

Sugito Zama hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### - ###


SUB-PEKERJAAN : Persiapan dan Struktur

DATE OF
NO NAME POSITION Monday, June 8, 2020 Tuesday, June 9, 2020 ### ### Friday, June 12, 2020 ### ### REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 DIKI TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
2 JOKO TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
3 ARI TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
4 TEGUH TUKANG 1.000 0.375 1.000 0.250 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375
5 AAN TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
6 GANTA TUKANG 1.000 0.250 1.000 0.250 1.000 0.250
7 LUKMAN TUKANG 1.000 0.250
Total 6.000 1.625 4.000 1.000 4.000 1.125 6.000 1.625 6.000 1.625 4.000 1.125 4.000 1.125

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

ITEM OF WORK SUMMARY :


1. Penyedotan air area Basement
2. Asisten survey
3. Langsir material batako dan pasir
4. Pembersihan lumpur
5. Pembuatan MCK baru di depan (Sub-pekerjaan Persiapan)

Prepared by, Checked By, Approved by,

Sugito Didi Hartanto Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### s/d ###


Sub- Pekerjaan : Persiapan dan Struktur

TIME
UNIT PRICE TOTAL PRICE REMAKS
Monday, June 8, 2020 Tuesday, June 9, 2020 ### ### Friday, June 12, 2020 ### ###
NO NAME
NORMAL TIME OVER TIME
NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME
(NT) (OT)
1 DIKI 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 750,000.00 187,500.00
2 JOKO 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 875,000.00 218,750.00
3 ARI 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 750,000.00 187,500.00
4 AAN 125,000.00 1.000 0.375 1.000 0.250 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 875,000.00 312,500.00
5 TEGUH 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 500,000.00 125,000.00
6 GANTA 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 375,000.00 93,750.00
7 LUKMAN 125,000.00 1.000 0.250 125,000.00 31,250.00
Sub - Total 4,250,000.00 1,156,250.00
Grand Total 5,406,250.00 Belum dikurangi PPH

Note :
Unit Price
Tukang cor = 110,000.00 Kenek Cor = 100,000.00
Tukang kayu = 125,000.00 Kenek Kayu = 100,000.00
Tukang besi = 125,000.00 Kenek Besi = 100,000.00
Tukang gali = 125,000.00 Kenek Gali = 100,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepared by, Checked By, Approved by,

Sugito Didi Hartanto Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### s/d ###


Sub- Pekerjaan :

TIME
UNIT PRICE TOTAL PRICE REMAKS
### ### ### ### Friday, June 12, 2020 ### ###
NO NAME
NORMAL TIME OVER TIME
NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME
(NT) (OT)
1 DIKI 125,000.00 1.000 0.250 1.000 0.250 250,000.00 62,500.00
2 JOKO 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 375,000.00 93,750.00
3 ARI 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 750,000.00 187,500.00
4 AAN 125,000.00 1.000 0.375 1.000 0.250 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 875,000.00 312,500.00
5 TEGUH 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 500,000.00 125,000.00
6 GANTA 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 375,000.00 93,750.00
7 LUKMAN 125,000.00 1.000 0.250 125,000.00 31,250.00
Sub - Total 3,250,000.00 906,250.00
Grand Total 4,156,250.00 Belum dikurangi PPH
TIME
UNIT PRICE TOTAL PRICE
### ### ### ### Friday, June 12, 2020 ### ###
NO NAME
NORMAL TIME OVER TIME
NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME
(NT) (OT)
1 DIKI 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 500,000.00 125,000.00
2 JOKO 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 500,000.00 125,000.00
3 ARI 125,000.00 - -
4 AAN 125,000.00 - -
5 TEGUH 125,000.00 - -
6 GANTA 125,000.00 - -
7 LUKMAN 125,000.00 - -
Sub - Total 1,000,000.00 250,000.00
Grand Total 1,250,000.00
FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### - ###


SUB-PEKERJAAN : Struktur

DATE OF
NO NAME POSITION ### ### ### ### Friday, June 19, 2020 ### ### REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 TEGUH TUKANG 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375
2 JOKO TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
3 AAN TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
4 LUKMAN TUKANG 1.000 0.250
5 KUAT TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
6 ARI TUKANG 1.000 0.375 1.000 0.375

Total 4.000 1.125 4.000 1.125 4.000 1.125 4.000 1.125 4.000 1.125 4.000 1.125 4.000 1.125

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

ITEM OF WORK SUMMARY :


1. Penyedotan air area Basement
2. Asisten survey
3. Langsir material batako dan pasir
4. Pembersihan lumpur pile cap
5. Pemasangan installasi air toilet baru

Prepared by, Checked By, Approved by,

Sugito Didi Hartanto Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### s/d ###


Sub- Pekerjaan : Struktur

TIME
UNIT PRICE TOTAL PRICE
### ### ### ### Friday, June 19, 2020 ### ###
NO NAME REMAKS
OVER TIME
NORMAL TIME (NT) (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME

1 TEGUH 125,000.00 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 625,000.00 234,375.00
2 JOKO 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 875,000.00 218,750.00
3 AAN 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 875,000.00 218,750.00
4 LUKMAN 125,000.00 1.000 0.250 125,000.00 31,250.00
5 KUAT 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 750,000.00 187,500.00
6 ARI 125,000.00 1.000 0.375 1.000 0.375 250,000.00 93,750.00
- -
Sub - Total 3,500,000.00 984,375.00
Grand Total 4,484,375.00 Belum dikurangi PPH

Note :
Unit Price
Tukang cor = 110,000.00 Kenek Cor = 100,000.00
Tukang kayu = 125,000.00 Kenek Kayu = 100,000.00
Tukang besi = 125,000.00 Kenek Besi = 100,000.00
Tukang gali = 125,000.00 Kenek Gali = 100,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepared by, Checked By, Approved by,

Sugito Didi Hartanto Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### - ###

DATE OF
NO NAME POSITION ### ### ### ### ### ### ### REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 ARI TUKANG 1.000 0.250 1.000 1.250 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375
2 JOKO TUKANG 1.000 0.250 1.000 1.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
3 AGUS TUKANG 1.000 0.250 1.000 0.250 1.000 0.250
4 BAGAS TUKANG 1.000 0.250 1.000 1.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
5 MISBAH TUKANG 1.000 0.250 1.000 1.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
6 SUTRIONO TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
7 AAN TUKANG 1.000 0.250 1.000 1.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
8 LUKMAN TUKANG 1.000 0.250 1.000 1.250 1.000 0.250
9 PUTU TUKANG 1.000 0.250 1.000 0.250
10 EDI TUKANG 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250
11 EKO TUKANG 1.000 0.250 1.000 0.250 1.000 0.250
12 INDRA TUKANG 1.000 0.250
13 YOGA TUKANG 1.000 0.250
14 ADI TUKANG 1.000 0.250
Total 10.000 2.500 6.000 7.500 6.000 1.625 10.000 2.625 7.000 1.875 11.000 2.875 7.000 1.875

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

ITEM OF WORK SUMMARY :


1. Bersih-bersih kantor
2. Bersih-bersih bekas bongkaran bedeng
3. Bersih-bersih akses jalan
4. Pembersihan dan buang longsoran tanah
5. Asisten survey dan asisten logistik
6. Penyedotan air
7. Langsir fabrikasi besi dari tanah pak Kipli ke area fabrikasi baru
8. Langsir material batako dan pasir

Prepared by, Checked By, Approved by,


Sugito Zama Hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : ### s/d ###

TIME
UNIT PRICE TOTAL PRICE
### ### ### ### ### ### ###
NO NAME REMAKS
NORMAL TIME OVER TIME
NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME
(NT) (OT)
1 ARI 125,000.00 1.000 0.250 1.000 1.250 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 1.000 0.375 875,000.00 421,875.00
2 JOKO 125,000.00 1.000 0.250 1.000 1.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 875,000.00 343,750.00
3 AGUS 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 375,000.00 93,750.00
4 BAGAS 125,000.00 1.000 0.250 1.000 1.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 875,000.00 343,750.00
5 MISBAH 125,000.00 1.000 0.250 1.000 1.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 875,000.00 343,750.00
6 SUTRIONO 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 500,000.00 125,000.00
7 AAN 125,000.00 1.000 0.250 1.000 1.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 875,000.00 343,750.00
8 LUKMAN 125,000.00 1.000 0.250 1.000 1.250 1.000 0.250 375,000.00 218,750.00
9 PUTU 125,000.00 1.000 0.250 1.000 0.250 250,000.00 62,500.00
10 EDI 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 1.000 0.250 500,000.00 125,000.00
11 EKO 125,000.00 1.000 0.250 1.000 0.250 1.000 0.250 375,000.00 93,750.00
12 INDRA 125,000.00 1.000 0.250 125,000.00 31,250.00
13 YOGA 125,000.00 1.000 0.250 125,000.00 31,250.00
14 ADI 125,000.00 1.000 0.250 125,000.00 31,250.00
Sub - Total 7,125,000.00 2,609,375.00
Grand Total 9,734,375.00 Belum dikurangi PPH

Note :
Unit Price
Tukang cor = 110,000.00 Kenek Cor = 100,000.00
Tukang kayu = 125,000.00 Kenek Kayu = 100,000.00
Tukang besi = 125,000.00 Kenek Besi = 100,000.00
Tukang gali = 125,000.00 Kenek Gali = 100,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepared by, Checked By, Approved by,

Sugito Zama Hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
MONITORING PEKERJAAN OPNAME HARIAN
PERIODE : ### s/d ###
PROYEK : Palembang, Sumatera Selatan

NO SUB-PEKERJAAN JUMLAH OPNAME

1 PEK. PERSIAPAN (TAMBAH)


PEMBERSIHAN DI AREA LAHAN PAK KIPLI Rp 4,250,000.00

2 PEK. TANAH
GALIAN TANAH (PILE CAP & TIE BEAM) Rp 937,500.00
PEMBERSIHAN DAN BUANG LONGSORAN TANAH Rp 1,203,125.00

3 PEK. PONDASI DAN PILE CAP


LANTAI KERJA PILE CAP Rp 1,437,500.00

4 PEK. STRUKTUR
LANTAI KERJA PELAT LANTAI BASEMENT Rp 1,906,250.00

TOTAL Rp 9,734,375.00
FORM REKAP ABSENSI PEKERJA HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : Monday, July 26, 2021 - Sunday, August 1, 2021

DATE OF
NO NAME POSITION Monday, July 26, 2021 Tuesday, July 27, 2021 Wednesday, July 28, 2021 Thursday, July 29, 2021 Friday, July 30, 2021 Saturday, July 31, 2021 Sunday, August 1, 2021 REMAKS
NT OT NT OT NT OT NT OT NT OT NT OT NT OT
1 Vicry Arinanda TUKANG 1.000 1.000 1.000 1.000 1.000 1.000
2 Saiful wani TUKANG 1.000 1.000 1.000 1.000 1.000 1.000
3 Beni TUKANG 1.000 1.000 1.000 1.000
4
5
6
7
8

Total 3.000 0.000 3.000 0.000 3.000 0.000 2.000 0.000 3.000 0.000 2.000 0.000 0.000 0.000

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

ITEM OF WORK SUMMARY :


1. Pembersihan jalan akses untuk pengecoran
2. Perapihan material
3. Asisten survey dan logistik
4. Penyedotan air

Prepared by, Checked By, Approved by,

Vicry Arinanda Zama Hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara
OPNAME UPAH TUKANG HARIAN
PROYEK PEMBANGUNAN GEDUNG PT. NPL
CABANG PALEMBANG KOTA - SUMATERA SELATAN

PERIODE : Monday, August 2, 2021 s/d Sunday, August 8, 2021

TIME
UNIT PRICE TOTAL PRICE
Monday, August 2, 2021 Tuesday, August 3, 2021 Wednesday, August 4, 2021 Thursday, August 5, 2021 Friday, August 6, 2021 Saturday, August 7, 2021 Sunday, August 8, 2021
NO NAME
NORMAL TIME (NT) OVER TIME (OT) NT OT NT OT NT OT NT OT NT OT NT OT NT OT NORMAL TIME OVER TIME

1 Vicry Arinanda 110,000.00 110,000.00 1.000 1.000 1.000 1.000 1.000 1.000 660,000.00 -
2 Saiful wani 110,000.00 1.000 1.000 1.000 1.000 1.000 1.000 660,000.00 -
3 Beni 110,000.00 -

Sub - Total 1,320,000.00 -


Grand Total 1,320,000.00

NT = Normal time, 08:00 s/d 16:00 or 1 day


OT = Over time, after 4:00 PM

Prepared by, Checked By, Approved by,

Vicry Arinanda Zama Hudaya Radhitya Putra Anggada Nano Suratno Arief Tirtanegara

You might also like