0% found this document useful (0 votes)
106 views30 pages

MP & Map

Mining Plan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
106 views30 pages

MP & Map

Mining Plan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
ALONG WITH (Under Rule 28 (4) of the Odisha Minor Mineral Concession 2 (Amendment) Rules, 2016) i] | PROGRESSIVE MINE CLOSURE PLAN | i ECT OF | CHHENAGAON SAND BED | OVER AN AREA OF 12.35 ACRES OR 4.997 HECTARES IN VILLAGE CHHENAGAON UNDER KESINGA TAHASIL OF KALAHANDI DISTRICT (ODISHA). (Cn j2) PLAN PERIOD- FIVE YEARS PRODUCTION OF SAND 6000.00 CUM/ANNUM OF TAHASILDAR, KESINGA DIST.- KALAHANDI, ODISHA. {ON BEHALF OF SUCCESSFUL BIDDER) PREPARED BY APPROVE SAIDATTA DAS wees RQP/OD/074/2017 somoirectér dik ZONAL SUPVEY, BALANGIR NENO TECHNICAL SERVICES i ANANTA NIWAS, PLOT NO- 576/ 4! mse) Clam) cme Ome Came) cme come cme come crane: Came. SS NN ANN OR AR OE oR RoE om wD se ‘4502, JAGANNATH VIHAR, SUNDARERDA, BHUBANESWAR, ODISILA-, 751002 ' oe “ie EM ALE cme esmailicom, 9 PH. 007.4% 2355490 8 See Ce mee came cee Scanned with CamScanner CHHENAGAON SAND BED CONTENTS SLNO. PARTICULARS PAGE NO. 1 | CONSENT LETTER FROMLESSEE | = A 2 | CERTIFICATE FROM LESSEE B 3 | CERTIFICATE FROM ROP ic \FoRM@o~=~*~*~—C—~—OO::::::SC“CS«S* Cz 5 ANNEXURES | FV 6 PLATES LVI — ‘A DAS RQP/ODI074/2017 —_—_ ‘Scanned with CamScannet ANNEXUI ~ Copy of the Ta - 1 Copy of the RE demarcation letter iy | 7 i a Vv Copy of the ROP certifi LIST OF PLA’ 2000 22000 1:2000 ~1:2000 000 SAIDATTA DAS. RQP/ODIN74/2017 Scanned with CamScanner CHHENAGAONSANDBED = ESSE: TAHASILDAR.KESINGA CONSENT LETTER FROM LESSEE Consent for prepara of the Mi The Mining plan in respect of Chhenagaon Sand Bed lease of Tahasildar, Kesinga over an area of 12.35 acres or 4,997 Hectares in village Chhenagaon, under Kesinga ‘Tuhasi of Kalahandi District, Odisha has been prepared by Sri Saidatta Das, Recognised (Qualified Person (RQP) Regn. No. - Regd. No. RQP/0D/074/2017, Valid up to; 08/02/2027. | request the Concerned Authority of Authorised Officer to make further correspondence regarding Tectification of the mining plan with the ROP in the following address. Name : Sri Saidatta Das Regd. No. RQP/OD/074/2017, Validity- 08/02/2027 NENO TECH ERVICES ANANTA NIWAS Plot No- 576/4502, Jagannath Vihar Sundarpada, Bhubaneswar-751002 Eanail: nenoindiaS@gmail.com Ph.= 06742355490 Thereby undertake that all modifications so made in the mining plan with Progressive Mine ‘Closure Plan by the RQP be deemed to have been made with my knowledge and consent and shall be acceptable to me and binding on me in all respects, Lex Place: (Signature an the concessionaire) Date: Address: Tahasildar, K Dist Kalahandi, Odisha. RQHODIO742017 Scanned with CamScanner ree ee EB CCHHENAGAON SAND BED LESSEE- TAHASILDAR, KESINGA CERTIFICATE AND UNDERTAKING FRO! THE LESSEE This isto Certify that all the statutory rules, regulations, orders etc. made by Central/ State Goverment, statutory organisations, Courts efe and permission of Mines Acts Rules and Regulations made there under have been observed in the Mining Plan of Chhenagaon Sand Bed over an area of 12.35 acres or 4.997 Ha, in village Chhenagaon under Kesinga Tahasil of Kalahandi District, Odisha prepared under Rule 28 (4) of OMMC (Amendment) Rules, 2016 by Sri Saidatta Das ROP and wherever specific permissions are required, the applicant will approach the DGMS and the standards prescribed by DGMS in respect of miner’s health will be strictly implemented. ea Place: (Signature of the concessionaire) Date: Address: a SAIDATTA DAS RQP/OD/074/2017 ‘Scanned with CamScanner CHHENAGAON SAND BED LESSEE- TAHASILDAR, KESINGA CERTIFICATE FROM ROP Certified that the provision of Odisha Minor Mineral Concession (Amendment) Rule 2016 have been observed in the Mining Plan along with Progressive Mine Closure Plan under rule 28 (4) of OMMC (Amendment) Rules, 2016 in respect of Chhenagaon Sand Bed over an area of 12.35 acres or 4.997 Ha. in village Chhenagaon under Kesinga Tahasil of Kalahandi District, Odisha prepared under Rule 28 (4) of OMMC (Amendment) Rules, 2016 belonging to Tahasildar, Kesinga and wherever specific permission are required, the lessee will approach the concerned authority. Certified that the information’s furnishes Closure Plan is correct to the best my Knowledge. this Mining Plan with Progressive Mine oun DAS RQP/OD/O74/2017 ‘Scanned with CamScanner CHHENAGAON SAND BED LESsE IASILDAR, KESINGA FORM-O (See Rule 28 (4) of the Odisha Minor Mineral Concession (Amendment) Rules, 2016) MINING PLAN FOR WINNING OF SAND OVER AN AREA OF 12.35 ACRES OR 4.997 HECTARES FROM CHHENAGAON SAND BED IN VILLAGE CHHENAGAON UNDER KESINGA TAHASIL OF KALAHANDI DISTRICT, ODISHA. (Category: B2) 1, |Name & Address of the Lessee :| On Behalf of Tahasildar, Kesinga, Dist — Kalahandi, Odisha. 2. | Particular of the Area | : (Acreage, Boundary Description & Land Schedule): (Attach Latitude: 20° 08° 36.693°N to 20° 08" 46.734°N Longitude: 83° 07° 05.132°E to 83° 07" 16.614°E, ~ location map and|_ | Survey of India Topo Sheet No. F44X4(64P/4) surface plans showing | | A Key plan and surface plan is attached as Plate No- 1 & IIT the existing features of : eat teaitoure | | Afea: 12:35 Acres /4.997 Ha, at 2m interval) Village _| Chhenagaon Taluk/Tahsil _| Kesinga District and State ~) Kalahandi, Odisha Khata No, /Plot No. Khata No- 101, Plot No- 1, Risam= Nadi Tease Area (Hectares) | ,| 12.35 Acres (5.00 Ha.) (Refer lease Sketch Plate No- Il) rm Whether the area iq ,| The entire quarry lease area is Non forest land (River). (Please specify whether Protected, Reserve etc.) recorded to be in Forest © ‘Ownership/Occupancy :| Govt. of Odisha. (Forest, Agriculture, Grazing, Barren etc.) Tand use pattern | | river sand, The Tease area is in a Chhenagaon Sand Bed and covered with ordinary APPROVED \ le wa : oak hon DAS Joint Director, Geology RQP/OD/074/2017 Zonal Survey, Balangir ‘Scanned with CamScanner CHHENAGAON SAND BED. LESSEE- TAHASILDAR, KESINGA 3, | Status of the Lessee: | :| The Lessee is a private individual, (Private Individual/Private Company/ Public Sector Undertaking/ Joint Sector Undertaking/ Others) 4, |Period of the | :| S years concession 5. | Mineral intended to be | ;| Ordinary river sand. won ‘Name : Sri Saidatta Das . eens © 1+) egal. No. RQP/ODI074/2017, Validity- 08/02/2027 ROP preparing the| | NENO TECHNICAL SERVICES mining plan with ANANTA NIWAS validity of | | Plot No- 576/4502, Jagannath Vihar Recognition: ‘Sundarpada, Bhubaneswar-751002 E-mail: nenoindiaS@gmail.com, Ph.- 0674-2355490 7, | Order No. & date of | :| A letter has been issued from the office of the Tahasildar, Kesinga, Competent Authority Kalahandi District for submission of mining plan being the highest granting the bidder in respect of Chhenagaon Sand Bed vide letter no-2722 date on- concession: (copy of | | 22.09.2022 (Refer Annexture-I) the order to be attached) 8. forest clearance obtained: (Attached copy of forest clearance) If, forest area, whether | : “The entire sand quarry lease area over 12.35 Acres or 4.997 Ha. is non forest land under the revenue class of “Nadi” in Tel Ri APPROVED! fA o- Joint Diraetor, Gaotoay Zonal Survey, Balangir ; & SAIDATTA DAS RQP/OD/074/2017 ‘Scanned with CamScanner CHHENAGAON SAND BED KESINGA Reserves (Estimation to be based ‘on the exploration, if any, carried out in the area or on the local parameters) The lease area is more or less a flat to gentle sloping sand bed having slope towards north and consists of river sand, sandy soil, and alluvium which are located in right bank of the river. The Highest altitudes are at 178m & respectively above mean sea level. The lease area forms a part of Tel River where the thickness of sand varies from 1.5 m to 2.5 m. So the average thickness of sand in the lease area is 2.0m. *A surface plan of the area has been prepared on 1:2000 scale at 2m counter interval. *Grid line along north-south and east-west direction is drawn at 100m. terval. *Geological plan has been prepared by placing the litho units in the surface plan Method of reserve estimation: ‘The reserve has been estimated by surface area method. Surface area has been calculated from the surface then multiplied with the depth of the deposit to get the volumetric reserve in cubic meter. This Volumetric reserve has been multiplied with the recovery factor of materials, to get the recoverable reserves. The recovery factor has been considered as 100% of the total excavation to get the reserves which can be extracted from the quarry and used in construction of building or road construction. G=ST, Where G= geological reserve of sand in m’, S= surface area of entire sand bed in m? and T=Thickness of sand bed in m. The details of Geological reserve estimation are as follows: GEOLOGICAL RESERVE ————— APPROVED Surface area | Thickness Resery (my of sand bed Malar Ff | category () (Cum) - x B CAXB earl 49978 2.0 99956 | Proved Grr ; oh, SAIDATTA DAS RQP/OD/074/2017 ‘Scanned with CamScanner CHHENAGAON SAND BED. LESSEE- TAHASILDAR, KESINGA ‘The mineable reserve has been calculated by leaving 7.5m from the lease boundary. While assessing the mineral proved category of mineral reserves have been considered and accordingly the mineral reserves are calculated assuming loss due to its proximity with the lease boundary. The details of mineable reserve estimated as follows: reserves of the deposit MINEABLE RESERVE Surface area | Thickness Reserve Qt) | ofsand bea | VME) Category a san (Cum) A B C=AXB D aan 20 87060 | Proved follows: ‘The computed geological and mineable reserve may be summarized as Category Proved Geological reserve 99956m" Mineable reserve 87060m™ REPLENISHMENT INTO CONSIDERATION YEAR- WISE RESERVE OF SAND CALCULATED TAKING 100% Te | ee] pearasn SORTER rstavtw) | EXCAVATION ePtensisteN a wr B oa Replenishment of let year TEAR | #760 a wo YEAR | 47060 00 | —B1060 5 G™ YEAR) 87060 6000 81060 6000 YEAR | 8060 ao 08% aa "YEAR | #7060 ‘aaa | 060 aa Toul SSO] Joint Director, Zonal Survey, Balangir : ee ‘A DAS RQP/OD/O74/2017 Scanned with CamScanner CHHENAGAON SAND BED LESSEE- TAHASILDAR, KESINGA Mining 10 |(@) Whether manual | :| jt is envisaged that mining operation will be carried out by open cast . or a . A i. S My mechanized or | | Manual method in single shift basis for the original plan period without mechanized any ing & blasting. However for the purpose of loading & transporting of the minor mineral (sand) loader, truck/ tipper/ tractor, etc. will be deployed as per requirement. Existing Mining Method: ‘The mining operation at Chhenagaon sand Bed has been started earlier and as a result of which pits have been developed. The mode of the deposits, geomorphology of the area and its hydrological condition are some of the factors that favours the open cast method of mining. Int deposit, the mining is done by open cast manual dry pit mining method. The sand are extracted loaded and transferred from pits to the user through loader, truck/ tipper/ tractor, ete. The mining is done on single shift basis. The local man power has been engaged in the mine. Machinery Detail It is relevant to mer ion here that for the purpose of loading & transporting of the minor mineral (sand) loader, truck/ tipper! tractor, tc. will be deployed by the quarry owner as per requirement. (6) If semi-mechanized or mechanized, Number, type and cap: of machines to be used. The ning will be done by opencast manual method. ©) Whether _driling and blasting will be Made use of, yes, state monthly’ Quantity of | explosives to be consumed: Due to looseness, sand will be mined out directly by manual means without drilling and blasting, APPROVED @ Benching pattern (Height x Width) | Thickness of sand bed varies from 1.5 m to 2.5 mAvéf of sand bed in 2.0m. Therefore benching patty 0. #*(.:'rarn os) is not necessarily required. dint Dacor Geology ; fe SAIDATTA DAS RQP/OD/074/2017 ‘Scanned with CamScanner CHHENAGAON SAND BED LESSEE KESINGA (© Face lay out (attached development Plan) Development and production planning has been made for average production of ordinary sand 6000.00 m? / annum (average) for a period of five years. Year wise development plan have been prepared on a scale of 1:2000 and colored distinctly to represent excavation limit. Development plan for Syears attached (Plate No-V) E PRODUCT! EDULE Surface Area of | Average | Volume of Sand (m?) | Thickness of | Sand(Cum) Sand (m) a B CAXB (YEAR) 3000.00 20 6000.00 @™ YEAR) | 3000.00 20 6000.00 G™ YEAR) | _ 3000.00 20 6000.00 (YEAR) 3000.00 20 6000.00 G™ YEAR) | __ 3000.00 2.0 6000.00 Total 3000.00 During plan period the following geoscientific consideration have been suggested to be taken into account for sand/ gravel mining: 1+ Inactive flood plains has been selected for mining. 1g will be stopped when the ground water table is encountered. 3+ Segments of braided river system has been used preferably falling within the lateral migration area of the river regime that enhances the feasibility of sediments replenishments. 4+ Mining at the concave side of the river channel has been selected to prevent bank erosion. ‘The development for the ensuing Five years period has been proposed in this quarry. The composite year wise development plan for five years have been provided on a scale 1:2000 APPROVED) © Quay Floor level (RL) at the end of the year or period of the concession respectively. elt, Tye bom RL athe end ofthe Plan Period. (Refer Plate No: WE | A? Joint Director, Geology Zonal Survey, Balangir ‘ eka DAS RQP/OD/074/2017 ‘Scanned with CamScanner CHHENAGAON SAND BED LESSEE-TAHASILDAR, KESINGA @) Quantity of mineral to be won (Annual Level of Keeping in view of the market demand, proposed quarry is schedule to produce ordinary sand up to 6000.00m"/annum (Average). Year wise production of sand are indicated below: overburden to be removed (Show location of such disposal in Development) Production) Year Production of sand (Cum) (YEAR) 6000.00 (@” YEAR) 6000.00 YEAR) 6000.00 YEAR) 6000.00 G™ YEAR) 2000.00 Total 3000.00 (bh) Quantity of |: no over burden over the sand bed. @® Whether heavy blasting 10 be adopted If yes, location of nearest habitation (to be shown in the surface plan) =] No blasting will be required. @ Safery precautions t0 be adopted During Mining operation following safety measures will be taken care, Tarpaulin will be covered during transporting of sand. Goggles, Earplugs, Nose masks will be provided to the workers. > Drinking water shall be provided at the mine location. (k) Brief description fon method of Procurement and storage of explosive Explosives are not used. APPROVED \ i ‘Waste Disposal {(@) Location (show it in the development plan) :| The over burden generation is nil. Joint Director, Geology al Survey, Balangir| (b) Area covered :| Not applicable. 1 st SAISAFTA DAS RQP/OD/074/2017 ‘Scanned with CamScanner CHHENAGAON SAND BED PAHASILDAR, KESINGA (©)Environmental safeguards for such disposal Not applicable. Mine drainage :] During dry season the lease area will be devoid of surface water and Give details of total | | during monsoon season the total lease area will be covered by wate. make of water during | | So work will continue only during dry season & mining will be dry and rainy season restricted to water level only, Hence there would not be any and its method of | | requirement of water handling. handling). ;| The river sand will be sold to the consumer directly so mineral processing is not required for sand mining, processing including sizing, sorting, generation of rejecis/fines etc). (a) No. of trees to be | :) 150 uprooted due to ‘mining operation (b) Program of About 150 nos of trees will be planted. Plantation Extent | No.of A = a (In sq.m) | Saplings ] TEAR) aio | 30 (2 YEAR) 276.00 30 or ve 77600 | 30] Mango, Chakunda, le) Cashew, Krusnachuda YEAR 7600 30 Banya, es. "YEAR "276.00 0 Total w3er.00_| 150 Manpower ‘Sand quarry will be headed by a manager as per eee Act, 1952. (a) Supervisory :) f CBA ‘ aoe “FO (inclusive of Detail a statutory ie c fo Director, Gactogy Personnel’s) fines Manager T Zonet Survey, Balonitr Foremen T Mate T Total 3 s ee SAIBATTA DAS RQP/OD/074/2017 ‘Scanned with CamScanner SHHENAGAQN SAND BED u DAR, KESINGA (b)Non- 3] There will be requirement of twelve workers for day to day mine Supervisory operation, (skilled, semi- skilled & Designation ‘No unskilled) [Skilled | T Se led T Unskilied 5 Total 7 Sand will be excavated and loaded manually in to the loader, truck/ tipper! tractor, ete. Keeping in view the above, manual mining and loading, OMS has been assumed to be 1.904 m? only, A total of 15 workers are {0 be employed in mine for production of 6000.00 m? Jannum (average) or 28.571 m’sand per day which is calculated to be as follows. e Yearly production £6000,00 m? (average) Number of working days 210 (7 Months) Daily production 6000/210 28.571 m? coms 1,904 m? ‘Numbers of unskilled laborers 28.571/1.904 required in work 16 | Use of Mineral :| Ordinary sand mined out from the river sand bed will be used as ‘construction material for construction of road, railway, building etc., + | (Specification and monthly quantity to be | | concrete and plastering. Quantity to be dispatched per month is 857.00 dispatched be | | m’ on an av Depending upon the requirement / market demand, furnished) this dispatch will vary. For (a)domestic use: Ordinary sand will be marketed locally to the civil contractors or builders for construction of road, railway, building etc. (b) For export + Nil Closure Plan | : 17 | Min (a) Deseribe the process/act ion it af the following: PROVED: i. Mined out land. :| As river sand formation is & continuous natural eos Ay ‘mining whatever quantity is excavated, will be “urs. ‘prada ‘monsoon season, when flood water flows over itzSinak Sura of sand is a natural phenomenon there will be no exhaust of ivities to be undertaken for reclamation and rehabilit the lease area during the plan period. , &, SAISATTA DAS RQP/OD/074/2017 ‘Scanned with CamScanner CHHENAGAON SAND BED. Ss AH KESINGA ii Waste/reject dump | -] The Generation oF overburden is proposed to be nil. So, there 1s no proposal of waste dump during the plan period. Top-soil stack | :| Not applicable. and its utilization (b) Financial assurance | :] An undertaking has been enclosed with this report regarding (To be furnished as a submission of financial assurance towards bank guarantee, as and bank suarane in respect | | when it would be decided by the competent authority in respect ofthe at the rate of Rs13000, {| #Fea to be used for mining and allied activities. per hectare) SAIDATTA DAS RQP/OD/074/2017 APPROVED eg eho- Joint Director, Geology Zonal Survey, Balangir » g SAIDATTA DAS RQP/OD/074/2017 Scanned with CamScanner CHHENAGAONSANDDED = ss LESSEE TAHASILDAR, KESINGA, 18. Certificate : 1 Tahasildar, Kesinga the holder of Chhenagaon Sand Bed for river sand over am area of 12.35 actes or 4.997 Ha, in village Chhenagnon under Kesinga Tahasil of Kalahandi District, Oxlisha hereby solemnly affirm that the plans and programs in this mining plan will be scrupulously implemented by me/us and Téwe will be strictly held responsible for any deviation thereot, U/We also hereby certty that the provision of Mines and Minerals {Development & Regulation) Act, 1957, and the Mines Act. 1952 and Rules and Regulation made under these Acts, along with the provisions of Odisha Minor Mineral Concession (Amendment) Rules, 2016 will be strictly adhered to while implementing this mining plan and wherever specific permissions will be required, We will approach the concemed authonties of Directorate General of Mines Satety and the State Government as the case may be. lene “a8 Place: (Signature of the concessionaire) Date: Address: Tahasildar, Kesinga, Dist— Kalahandi, Od APPROVED . = wenn Das RQPIONINTANO17 ‘Scanned with CamScanner 1 do here by undertake that the successfil bidder will submit financial assurance as decided by the competent authority in form of bank guarantee from any nationalized bank after receiving environmental clearance and final work order. Yon-v- Place: (Signature of the concessionaire) Date: Address: Tah: r, Kesinga, Dist— di, Odist ® 2 Sal ADAS RQP/ODI074/2017 Scanned with CamScanner OFFICE OF THE TAHASILDAR, KESINGA telterNo. 2F22 _sTouri. Date_za)o4 12022. To The NENO TECHNICAL SERVICES Gee Das (RAP/OD/074/2017) lot No. -M/154, Baramunda Housing B Bhubaneswar, — Sub: ic ir Preparation of Mining Plan of the sources i.e. Kantesir Sand Bed and Chhenagaon Sand Bed of Kesinga Tahasil Sir e With reference to the subject cited above, | am to enclose herewith the name of Amath Sand Bed and Goudtola Sand Bed along with sketch map for Preparation of the Mining Plan in respect of Kesinga Tahasil and furnish to this office for taking further necessary action at this end. Encl: Name ofSairat Sources along with sketch map. Yours Faithfully le vw ae Tahasildar, Kesinga © semo No. A%tQ3___JEstt. Date__Az }o9 /2022. Copy submitted to the Additional District Magistrate Kalahandi / Sub-Collector, Bhawanipatna for kind information and necessary action. [ona Oe Tahasildar, Kesinga ‘Scanned with CamScanner Information on sairat sources of Kesinga Tahasil Name ofthe | Name of RIC] Name ofthe | Khata | Plot | Kissam | Total Proposed | MGQ mouza: No No. area area in in AC Ac. = [si |'No | sources | 2a Saeed 4 5 [sl 7 @ | 9 | 10 i Kantesir | Kashrupada | Kantesir_| 398 | 97 | Nadi_| 12.60 73.94 _| Sep) BOO Thhenagaon | Goksleswar | Chhenagaon| 101 | 1 _| Nadi 72.351 12.35 | 6200 8 Tatkerton Tahasildar, Kesinga Scanned with CamScannet - Seger Sein : . By cen a a é @ ise He eco wHa!G TORIOY Yalan ‘Scanned with CamScanner ERTIFICA Certified that the feave area fs demarcated and shown to lessee in the field by me in respect of Chhenaynon Sand Hed over an area of 12.95 acres of 4.997 heciare, Khata no-1Ol, Plea nib in Villaye- Chhenayaon, Tahasile Kesinga of Kalahandi District Odisha of Tahasildar, Kesings for quarrying and mining the area Certified that the information furnished by me is correct 10 the best of my knowledge. NUE INSPECTOR RI CIRCLE, ‘Scanned with CamScanner GOVERNMENT OF ODISHA DEPARTMENT OF STEEL AND MINES DIRECTORATE OF MINES CERTIFICATE OF RECOGNITION AS QUALIFIED PERSON [Winder rule 20(2) of Odisha Minor Mineral Concession Rules, 2016) Sti Saidatta Das S/o Sri Pravat Kumar Das, House No-t05, Nogeswore Recidency, Kalarahanga, Pata, Bhubaneswar, dish, 751024, whose photograph and signature are affived herein, having given satisfactory evidence of his qualification and exper of ence, is hereby recognised under rule 20(2 Odisha Minor Mineral Concession Rutes, 2016 as a qualified person to prepare Mining Plans for Minor Minerals the State of Odisha, India, Jhs/ Her Registration No.is: | RQP/OD/074/2017 1 certificate will be liable to be withdrawn/ cancelled in the event of furnishing wrong, Recognition is valid for a period of 10 years ending on 08-02-2027. This information documents in the Mining Phins to be submitted by bin Qe’ PD, : Place: Bhubaneswar DIRECTOR OF MINES, ODISILY tate: 09-02-2017 BHUBANESWAR Scanned with CamScanner 0 skov UGm gkn 2 INDEX LEASE AREA [O_] sees S BUFFER ZONE, APPROVED ont OFctor, Geo Zora! Survey, Balangie Scmecume HEERAGAON ‘OVER ARIA OF 12.35 ACRES OR 4 TH VILAGE CIMENAGAON UNDER Ke Tanusi. Of KALAHANDI O1 Lisi FAMASILDARC ‘Scanned with CamScanner [PomnTip| LONGITUDE LATITUDE 1__| 83°0711.25408" | 20°08'46.73472" 2 | 83°0716.61448" | 20°08'41.02728" a__| 83°0715.72672" | 20°08'40.63380" 4__ | 83°07'13.42488" | 20°08'39.27408" 5 __| 830711.61516" | 20°08'37.81752" | 6 __|-83°0730.54452" | 20°08'35.69324" 7____[83°0705.13264" | 20°08'41.79228" ML BOUNDARY ‘CONTOUR SAFETY ZONE GRID APPROACH ROAD ves HhlEA OF 12.35 ncxeS CrManan ‘Caan tpan Ses sowie tn the Lene map prvi 1297 HAIN VILLAGE HENAGAOH UNDER KECING TAMASIL siete] iby the Lecce INDEX ML-BOUNDARY ‘CONTOUR SAFETY ZONE or APPROACH ROAD. WATER FLOW DIRECTION ~ | ULTIMATE PIT LuMir SAND BED APPROVED SCAL.1300 PLATENO.-1V ‘CHKENAGAON SAND BED ‘oven AREA OF 12.35 ACRES OR 4.997 HAIN VUscECHENAGAON UNDER KESINGA TARASIL i MLAHANDI DISTRICT, ODISHA eae Cen ay Saas ae sno aqnonen2017 ‘Scanned with CamScanner SCALE em 20m yo or wisi nario yesH wae morose mage: EHF) rsrveae [htt] sccosovean [ee 4] to vean [Pa] rovamavean [et 4] FIFTH YEAR, ‘YEAR WISE DEVELOPMENT OF QUARRY a (EG) stcovvom GE two (Hi) rourmuvenn Eg) rem MAL BOUNDARY CONTOUR SAFETY ZONE oR APPROACH ROAD. WATER FLOW DIRECTION ULTIMATE PIT LIT SAND BED APPROVED eae “ot Director, Gaclogy Zonal Survey, Balarain PLATE NO. ‘CHENAGAON SAND BED ‘oven INAEA OF 12.35 ACRES OR 4.997 KA, IN VILA OFEKAGAON UNDER KESINGA TARASIL ‘ALAMANDI DISTRICT, OOISHA TESSEE- TANASILDAR, KESINGA DEVELOPMENT PLAN Rowe bsdon he Lease map rode by he Lace rove nawonny2017 TariTaaASisplon& Secon we covet tot aay | le SCA Om gtr bre Paw Ow 2 QUARRY ATTHEEND OF PLAN PERIOD PLANTATION DURING. PLAN PERIOD. AIR MONITORING STATION [NOISE MONITORING STATION WATER MONITORING STATION soot ML BOUNDARY CONTOUR SAFETY ZONE ow APPROACH ROAD WATER FLOW DIRECTION ULTIMATE err LIT ‘OVERAN REA OF 12.35 ACRES OR 4.997 HA IN {VILAGE CHHENAGAON UNDER KESINGA TANASIL, (OF LANANDI DISTRICT, ODISHA Ry KESINGA | anWitONMENT MANAGENIENT PLAN er plan Sexton are cet he BT nowteae bod onthe Leake map provide ty the ese SAATTA Das nowODOTA2017 ‘Scanned with CamScanner SCALE tem = 20, iris wings QUARRY AT THE END OF PLAN PERIOD AREA 1.5 HA. PLANTATION DURING PLAN PERIOD AREA 0.1381 HA. "AIR MONITORING STATION [NOISE MONITORING STATION WATER MONITORING STATION INDEX SS 7] conroun ——— =| sarery zone GRID APPROACH ROAD WATER FLOW DIRECTION ULTIMATE PIT LiMIT ‘SAND BED APPROVED ort tic onc! Savoy, Bale” SCALE 200 PLATENO. CHHENAGAON SAND BED OVER ANAREA OF 12.35 ACRES OR 4.997 HAIN VILLAGE CHIENAGAON UNDER KESINGA TANASIL, (OFFALAMANOI DISTRICT, OOISHA TLESSEE- TAHASILDAR, KESINGA PROGRESSIVE MINE CLOSURE PLAN. ‘Cee Bis plan& Section are comet othe Tay Anowledped bd onthe Lease map povided bythe Lance eas qnoD072017 ‘Scanned with CamScanner

You might also like