Trial mix result of Long-Distance Pumping

1. FC35 + MBS Admixture


- HRWR (Glenium) : 4.2 L/m3
- Stabilizier (Delvocrete HCA10) : 2.4 L/m3

Time Slump (cm) Temp (0C)


Fresh Concrete 20 31.5
60 minutes 19.5 30.9
120 minutes 19.5 30
180 minutes 16.5 29.9
Remark Continue to Concrete Pump trial

2. FC35 + Nexco Admixture


- HRWR (Polynex NP) : 7.2 L/m3
- Stabilizier (Nextard Stabilizier 3) : 2.4 L/m3

Time Slump (cm) Temp (0C)


Fresh Concrete 21 31.2
60 minutes 13.5 31.1
Remark Failed

3. FC35 + Normal Nexco Admix


- HRWR (Polynex NP) : 5.2 L/m3
- Retarder (Nextard) : 1.8 L/m3

Time Slump (cm) Temp (0C)


Fresh Concrete 19 33.7
60 minutes 18 31.7
120 minutes 17 29.7
180 minutes 9 29.3
0
Remark Temp. is 40 C after 1 hour in CP