Stock Transfers 100% physical movement of

material
 S.loc to S.loc (within Plant)
Transfer of material between 2 s.locs
belonging to same plant
1000
0001 0002
MM-1

- A/c doc not generated


- A/c doc generated if material is split
valuated and the valuation changes
during transfer
- Transfer possible in one step (311) and
two step procedure (313/315)

 Plant to Plant (within CC)


Transfer of material between 2 plants
belonging to same CC
1000 (CC)
1000 1100 (Plant)
M-1
- A/c Doc generated
- A/c doc not generated if val. Area is CC
- A/c doc generated if val. Area is plant
Val. Area Plant
1000 1100
M-1
2000 pcs 100 pcs
V= 10 S=3
20000 300
= 20300

1500 pcs 600 pcs


15000 1800
= 16800

Val. Area CC
1000 1100
M-1 S= 8
2000 pcs 100 pcs
16000 800
= 16800

1500 pcs 600 pcs


12000 4800
= 16800

- Transfer possible in one step (301) and


two step procedure (303/305)

Plant
1000 (Sector 1) 1100 (Sector 2)
M-1
200 PCs  301
9::50 am

Plant
1000 (HYD) 1100 (MUM)
M-1
200 PCs  303 (stock in transit) @ receiving
plant
(200 Pcs)
8:50 am (09.02.2023) 11:30pm (10.02.2023)
305 put away
into storage
Plant to plant transfer with PO (STO)
Receiving plant SM01 sends PO to issuing
plant 1IPA Issuing plant makes goods issue
on MIGO (movement type 351)  when
physically material arrives @ receiving plant
GR posted with ref to STO

 CC to CC (within Client)
A/c Doc generated

CC 1000 to CC 2000
Plant 1000 to Plant 2000