Professional Documents
Culture Documents
09 02 2023
09 02 2023
material
S.loc to S.loc (within Plant)
Transfer of material between 2 s.locs
belonging to same plant
1000
0001 0002
MM-1
Val. Area CC
1000 1100
M-1 S= 8
2000 pcs 100 pcs
16000 800
= 16800
Plant
1000 (Sector 1) 1100 (Sector 2)
M-1
200 PCs 301
9::50 am
Plant
1000 (HYD) 1100 (MUM)
M-1
200 PCs 303 (stock in transit) @ receiving
plant
(200 Pcs)
8:50 am (09.02.2023) 11:30pm (10.02.2023)
305 put away
into storage
Plant to plant transfer with PO (STO)
Receiving plant SM01 sends PO to issuing
plant 1IPA Issuing plant makes goods issue
on MIGO (movement type 351) when
physically material arrives @ receiving plant
GR posted with ref to STO
CC to CC (within Client)
A/c Doc generated
CC 1000 to CC 2000
Plant 1000 to Plant 2000