You are on page 1of 1
Q) OPPE Loos Replacement of oil storage tanks No. 1&17 at ES-Sider tank farm | 3 Daly TOTAL REPORTS HANDOVER DATE: 09/10/2023 item TITRE / DESIGNATION OBSERVATIONS I ‘REPORT TKOL : ‘TKI 1 | VACCUM TEST N° REPORT 10 14 \VACCUM TEST N’ REPORT 1 TO 18 (25missing) cE 02 | Roundess test N” REPORT 6 Roundness test N REPORT 11 et 12 03 Checklist dimensions N° REPORT 1 to 5 Checklist dimensions N” REPORT 1 to 14 (a3missng) ‘Banding test N° REPORT 1 to 2 Banding N° REPORT 1 to. Peaking test N° REPORT 1 t0 3 Peaking N° REPORT 1 to'5 Fit up test N° REPORT 30 to 35 Fit up N° REPORT 1 to 68 (1 to 38missing) Visual test N° REPORT 01 to 35 (20missing) ‘Visual N° REPORT 01 to 88 (5.64missing) Penetration liquide oil test N" REPORT 01 to 02 Penetration liquide oil test N° REPORT 01 to 02 Radiographic test N° REPORT 01 to 04 ann plate IN* REPORT 53 to 67 (62 to 63missing) Radiographic test N" REPORT 01 to 04 ann plate IN" REPORT 01 to 52 (WAT Date (25/07/2022)(17/02/2022 26){17/02/2022 36) Daily total radiography test N° REPORT 01 to 16 / time sheet N° REPORT ts -001-23 20 | Handover document sujet transmition of radiographic film to woe Ui | Vaccum test N° REPORTO1 to 14 Vaccum test N° REPORT 01 to 18 12 | Painting test N* REPORT 01 to 14 Painting test N” REPORT 01 to 14 [13 [ato recon Catodic protection Rapport haridover of instaltion and testing Daw 28 OT Ooms Mechanical work inspection N'REPORTO1t0O3 ag | Testfunctionalty of reference electrode “Test functionalty of reference electrode N'REPORT 17 N'REPORT 14 zi ng. Handover ofthe lst eveling mark gauntty 'REFORT | Handover ofthe st eveling mark gauntty 16 N'REPORT 15 17 | Cathodie protection N°REPORT 01 t0003 ¢procedure | Cathodic protection NREPORT 04 +procedure 18 ‘Sketch N°REPORT 01 to 03 ‘Sketch N°REPORT 01 / Non conformance report | 19 Foundation checklist N"REPORT NO1 TO NOS Foundation checklist NO1 TO NO2 | 20. | CONSTRUCTION INSPECTION SHEET N°REPORT NO1 CONSTRUCTION INSPECTION SHEET N'REPORT 1NO3/ NO2 (N* Report no aprovad) Water chemical Analysis, ‘Water chemical Analysis Ring wall concrete Ring wall concrete Replacement of crede oil strage tank N°REPORT 19820 Replacement of crede oil strage tank N"REPORT 16

You might also like