You are on page 1of 5

Construction contract matters are distinctly unique from other types of disputes.

They nearly
usually require an urgent solution, have a highly technical and sophisticated nature, and
involve numerous parties. Like in no other conflict form, joinder and consolidation issues
take center stage in these disputes. Construction contracts come with a number of risks,
which makes it more important to allocate those risks among the various parties in an
efficient manner. The type of the act or omission that led to the obligation being violated, as
well as the amount of damages, must all be carefully considered when determining the
liability of a party in a chain of parties. Experts are becoming more and more involved in
these debates. Consequently, it takes a unique skill set to assess expert testimony and
examine expert witnesses.

It is crucial to use efficient case management approaches in construction dispute resolution


due to the fact-sensitive nature of these disputes and the requirement for rapid resolution. An
important financial component is often included in many disagreements. Financing for
construction projects is frequently provided by lenders and credit providers. Another
significant industry is insurance. A variety of claims against financial institutions are made
possible by security in the form of guarantees or bonds. Construction conflicts only occur as a
result of construction contracts, but there is a chance to limit their frequency and lessen their
effects by carefully studying and designing construction contracts.

The law of contracts helps evaluate if a legal construction contract has been made at the
outset and also establishes the applicable standards for determining culpability when a
dispute develops. This issue is decided through pre-contract agreements like tenders, letters
of intent, etc. It is crucial to keep in mind that construction disputes may not result from
circumstances that are constant over time, but rather from modifications to the original
designs, price changes, weather variations, raw material availability, labor conditions like
strikes and lockouts, changes to laws and regulations, and other unanticipated or foreseeable
but unpredicted events.

The aforementioned particular confluence of elements necessitates a highly specialized


understanding of the problems facing the construction industry as well as the rights and
remedies available to parties engaged in construction disputes. In this essay, key elements of
construction contracts are succinctly explained with a focus on those that are crucial in
disputes.
CONSTRUCTION CONTRACTS IN INDIA

The term "construction" can refer to any type of building or assembly, but it is typically only
used to describe the production of, or the completion of work on, immovable property.
Depending on the technical details of the contract, this can comprise both construction and
engineering work. Engineering works refer to any type of construction that isn't static, while
a building denotes a structure meant for habitation. Construction in connection to other types
of property, such as the construction of ships and aircraft, is governed by the same principle,
with certain adaptations.

A construction contract is any contract entered into specifically for the construction of an
asset or a group of assets that are closely interconnected or interdependent in terms of their
design, technology, and function, as well as their ultimate use or purpose, according to the
Accounting Standard (AS) 7.

Numerous parties are involved in a construction contract, including the employer, contractor,
subcontractor, project management consultant, and supplier. The owner or principal is often
the employer, and the contractor is responsible for designing and/or constructing. Under a
subcontract, the subcontractor is employed by either the employer or the contractor.
Construction work is managed by a project management consultant. Materials or equipment
are provided by a supplier. Additionally, the design team may work independently. 'Design'
has ill-defined boundaries. Generally speaking, it refers to certain physical attributes of the
work that meet the criteria's standards. In addition to having a primary focus on construction,
including design, quality, and timelines, a construction contract should establish a strict
framework outlining participants' obligations, allocating risks, recognizing parties' rights in
law and equity as appropriate, and offering mechanisms for timely and efficient dispute
resolution.

A. FORMATION OF CONSTRUCTION CONTRACTS

Beyond those that ordinarily govern contract construction, there are no additional rules or
principles that apply when parties enter into a specific building contract that govern how their
agreement should be interpreted. Construction contract law is the application of conventional
contract law principles to a specific situation. Therefore, it is crucial to comprehend the
context in which a specific construction contract term is being attempted to be construed.
Therefore, it's crucial to determine whether a legal contract has been formed as a first step.
Construction contract formation is the subject of the majority of disagreements. This is due to
the numerous negotiations, proposals, counteroffers, tenders, advance bank guarantees, and
related paperwork that frequently accompany a building contract. Parties may have a
tendency to start working before a contract is actually executed. If one party fails to
acknowledge work done by the other in advance, the performing party will be forced to incur
costs and lose the value of the work done. On the other hand, a party might anticipate that
work will start before it really does, but the performing party might not think that a contract is
actually in place. In such a situation, the employer may anticipate the completion of certain
work and may have a claim for delays, if any, or non-completion of work, even though the
performing party may not even be aware that a valid, binding contract exists. Conflicts result
from this. Employing the traditional rules of contract on offer and acceptance is the basic test
for establishing whether a contract is legitimate or if a valid contract has come into existence
to be binding on the parties. For instance, it will be crucial to ascertain if a clear, unequivocal
intention to be legally bound by the contract can be extrapolated from the contract if work has
already started in advance of the signing of a formal contract. Any reliance on ambiguous
language in the tender documents or on a party's understanding without adequate supporting
evidence would not be sufficient to prove the formation of a legally binding contract. Testing
whether key clauses are present in the construction contract is another method. Legal experts
carefully examine which clauses are ambiguous, show a clear aim, or are a necessary term.

B. TYPICAL DOCUMENTATION IN CONSTRUCTION CONTRACTS

Construction contracts are full of different sets of documents with different functions, and
they are quite illustrative. The core paperwork are typically standardized, even though the set
of documents varies depending on the type of construction activity and contract type used.
Contractual documents typically include:
i. Drawings - These provide a thorough description of the construction work that will be
done.
ii. Specifications: A thorough explanation of the proposed works' specifications, added to the
designs to show the extent and caliber of the work.
iii. Bills of amounts: This document includes an indicative list of the amounts of materials
needed for construction, which also enables contract pricing.
iv. Conditions of Contract: These conditions include important clauses addressing
performance and the interaction of the parties. It also covers risk allocation and lays down the
responsibilities of the parties.
v. Employer's Requirements: It outlines the volume and caliber of work that must be
completed. The paper embodies what the employer anticipates from the contractor.
vi. Performance Requirements: This document outlines the output and performance that the
contractor is required to provide in relation to the construction project. The final generation
capacity of the power plant, for instance, might be specified here in the context of a power
plant construction project.
vii. Accountability: This makes it easier to assign responsibilities to either side for delivering
information and crucial facts that are relevant to construction. For instance, the employer may
be required to give soil testing information as part of a construction contract for an oil
refinery, upon which the contractor bases the start of construction activities.
viii. The Dispute Adjudication Agreement specifies how disputes will be resolved in
accordance with the contract.

You might also like