SPR CONSTRUCTIONS

SRT project - Stone & Tiling work - Rate comparison 08.04.2023


SPR
S.No Description Unit Quantity
Rate Amount

A Marble
Labour charges for Marble flooring rates inclusive of Cutting,
laying, Polishing of 8 coats, Adhesive all Chemicals, Man
1 power, lead lift, Machineries, Tools and Tackles and all SqFt 4549.17 130 5,91,392
consumable material to complete the entire scope of work as
per drawing BOQ and instruction of EIC.

Labour charges for Marble skirting rates including Cutting,


laying and Polishing including Adhesive all Chemicals. The Rate
2 is inclusive of all Man power, lead lift, Machineries, Tools and Rft 1345.64 100 1,34,564
Tackles and all consumable material to complete the entire
scope of work as per drawing BOQ and instruction of EIC.

Labour charges for Marble wall cladding rates inclusive of


Cutting, laying, Polishing of 8 coats, Adhesive all Chemicals,
3 Man power, lead lift, Machineries, Tools and Tackles and all SqFt 253.17 180 45,570
consumable material to complete the entire scope of work as
per drawing BOQ and instruction of EIC.

Labour charges for Lift entrance Marble flooring rates


inclusive of Cutting, laying, Polishing of 8 coats, Adhesive all
4 Chemicals, Man power, lead lift, Machineries, Tools and SqFt 167.27 130 21,745
Tackles and all consumable material to complete the entire
scope of work as per drawing BOQ and instruction of EIC.

Tiles
Labour charges for Floor tile (upto to 1200mm) laying work
rates inclusive of cutting, laying, man power, lead, lift,
5 machineries, tools, tackles, grouting with chemicals all SqFt 1032.57 30 30,977
consumable material as per drawing BOQ and instruction of
EIC.
Labour charges for Floor tile skirting laying work rates
inclusive of cutting, laying, man power, lead, lift, machineries,
6 Rft 276.61 20 5,532
tools, tackles, grouting with chemicals all consumable material
as per drawing BOQ and instruction of EIC.

Labour charges for Wall tile (above 1200mm) laying work


rates inclusive of cutting, laying, man power, lead, lift,
7 machineries, tools, tackles, grouting with chemicals all SqFt 2092.52 40 83,701
consumable material as per drawing specification and
instruction of EIC.
Labour charges for Wall tile (upto 1200mm) laying work rates
inclusive of cutting, laying, man power, lead, lift, machineries,
8 SqFt 634.60 35 22,211
tools, tackles, grouting with chemicals all consumable material
as per drawing specification and instruction of EIC.

B Granite
Labour charges for Kitchen granite top including cutting, laying
adhesive all chemicals, man power, lift, lead, machineries,
9 tools and tackles, cutting, chamfering, facia, top skirting and all SqFt 251.88 250 62,969
consumable material to complete the entire scope of work as
per the drawing specification and instruction of EIC.
0
Labour charges for Toilet ledge top laying work, rate including
cutting, laying, chamfering, polishing, adhesive material, man
10 Rft 27.56 75 2,067
power, lead lift, machineries, tools, tackles, all consumable
materials as per drawing specification and instruction of EIC.

Labour charges for Balcony/ Uitlity ledge top laying work, rate
including cutting, laying, chamfering, polishing, adhesive
11 material, man power, lead lift, machineries, tools, tackles, all Rft 121.46 75 9,110
consumable materials as per drawing specification and
instruction of EIC.
SPR
S.No Description Unit Quantity
Rate Amount
C Staircase - Granite
Labour charges for Granite Laying in Staircase tread rates
including Cutting, laying, adhesive Chemicals, man power, lead
12 SqFt 250.33 45 11,265
lift, Machineries, Tools and Tackles and all consumable
material as per drawing specification and instruction of EIC.

Labour charges for Granite Laying in Staircase riser rates


including Cutting, laying, adhesive Chemicals, man power, lead
13 Rft 254.34 35 8,902
lift, Machineries, Tools and Tackles and all consumable
material as per drawing specification and instruction of EIC.

Labour charges for Granite Laying in Staircase midlanding


rates including Cutting, laying, adhesive Chemicals, man
14 power, lead lift, Machineries, Tools and Tackles and all SqFt 70.14 45 3,156
consumable material as per drawing specification and
instruction of EIC.
Labour charges for Granite 8mm chamfering work, rate
including polishing, manpower, lead, lift, machineries, tools,
15 Rft 339.65 30 10,189
tackles and all consumable materials as per drawing
specification and instruction of EIC.
Labour charges for Granite edge polishing work, rate including
manpower, lead, lift, machineries, tools, tackles and all
16 Rft 668.80 40 26,752
consumable materials as per drawing specification and
instruction of EIC.
Labour charges for Granite Laying in Staircase skirting rates
including Cutting, laying, adhesive Chemicals, man power, lead
17 Rft 107.35 35 3,757
lift, Machineries, Tools and Tackles and all consumable
material as per drawing specification and instruction of EIC.

Labour charges for Granite steps 4mm double groove work,


rate including manpower, lead, lift, machineries, tools, tackles
18 Rft 498.71 30 14,961
and all consumable materials as per drawing specification and
instruction of EIC.

TOTAL AMOUNT 10,88,822