Professional Documents
Culture Documents
Physical Sample Management - SAP S4 HANA QM
Physical Sample Management - SAP S4 HANA QM
1. In Sampling procedure make sure that you maintain sample management radio
button and valuation mode as "Manual valuation",
then in the next step you will see as shown below in sapling procedure
2. Once the purchase order is created & GR is done against the PO due to
inspection type 01 activated in material master QM view, new inspection lot will be
generated automatically and all details as shown below
Samples are calculated without any error
3. Also make sure that in the configuration of inspection type 01 which was assigned
to material master QM view to execute this scenario, a proper sample type is
assigned.