Overview:
Subcontracting is used to process the external repair of a serialized component. You receive a serialized
component into stock in an unserviceable condition. You send the material for repair or overhaul to a
subcontractor. Once the subcontractor has completed the work, you receive the material into stock in a
serviceable condition.
Subcontracting supports plant stock and various special stocks such as sales order stock, customer stock,
project stock, and so on.
Material which needs to be sent to the vendor will be assigned to this operation.
If more parts are required by the subcontractor, they can also be entered on the Component tab page.
They will be treated differently by the system for instance as spare parts(consumption) depending upon
the parameters/criteria selected.
If the receiving component is physically different from the original part, an unplanned serial number
change is possible when posting goods receipt
Depending on the data maintained in the material master record, an inspection lot is automatically
created in the background.
Monitor subcontracting process > ADSUBCON
Purchase requisitions, purchase orders, deliveries, and material documents are displayed in a tree
structure per plant, vendor, and material.
Stock overview for the selected materials is displayed.
Key data is displayed for each document. If you need further information, you can access the
standard transactions for maintaining or viewing the document.