You are on page 1of 2

Komparasi Tender Lift

JP Apartement
No. Tower OE PT. Indoraya Nusantara Djaya (Siglen) PT. Superhelindo Jaya (Hyundai) PT. Daiichi Elevator Indonesia PT. Mitra Global Kencana PT. Pillar Multi Sarana Utama PT. Vertikal Apti Yasa (Fuji)
1 Green 1,995,400,000 1,894,812,500 2,930,770,000 1,589,500,000 1,584,200,000 1,166,200,000 2,326,000,000
2 Blue 2,374,900,000 1,749,000,000 1,656,900,000 2,835,000,000
3 Red 3,096,500,000 1,749,000,000 1,656,900,000 3,715,000,000
Lain-lain 2,379,300,000 147,000,000
Total 7,466,800,000 1,894,812,500 2,930,770,000 7,466,800,000 1,584,200,000 4,627,000,000 8,876,000,000
PPN (10%) 746,680,000 189,481,250 293,077,000 746,680,000 158,420,000 462,700,000 887,600,000
Total + PPN 8,213,480,000 2,084,293,750 3,223,847,000 8,213,480,000 1,742,620,000 5,089,700,000 9,763,600,000
Komparasi Tender Lift
JP Apartment
Tower Green Tiga Tower
No. Item PT. Indoraya Nusantara Djaya (Siglen) PT. Superhelindo Jaya (Hyundai) PT. Mitra Global Kencana PT. Daiichi Elevator Indonesia PT. Pillar Multi Sarana Utama PT. Vertikal Apti Yasa (Fuji)
P 15 (1000) - CO 90 - 16/16 Max E-1050-CO1.5-16/16/16
1 Lift LE P-1000-CO90-16/16 1,095,000,000 (VF1C) 1,075,460,000 VSM-P-1000-CO105-22/22 580,000,000 Lift Penumpang 3,322,000,000 781,200,000 Tower Green 2,326,000,000
Max E-1050-2S1.5-16/16/16
LE S-1000-SO90-16/16 553,312,500 S 1000 - SO 90 - 16/16 (VF1C) 554,770,000 VSM-S-1600-SO105-22/22 647,000,000 Lift Service 1,765,500,000 385,000,000 Tower Blue 2,835,000,000
Max E-1150-CO2.5-22/22/23
ES 1200 - R 3500 (S-BT) < 30 872,040,000 (double door) 1,240,400,000 Tower Red 3,715,000,000
Intermedate Beam H 200 x Max E-1150-CO2.5-22/22/22
200 660,000,000 1,180,200,000
Max E-1050-2S1.5-22/22/22
893,200,000
Separator Beam 297,000,000
Grounding + Pantek 150,000,000 Grounding Lift 302,500,000

Testing & Commisioning 181,500,000

Izin-izin 121,000,000
Earthquake Sensor 7,500,000 Earthquake Sensor 63,000,000
Pemasangan (ARD + Access
Control + CCTV + Passanger 1,257,300,000
Pemasangan Escalator)
2 Instalasi Pemasangan 204,000,000 Pemasangan 376,000,000 343,200,000

Supervisory Panel + LCD 17"


Supervisory Panel 42,500,000 Supervisory Panel 45,000,000 Supervisory Panel 220,000,000 84,000,000
Trucking 14,000,000
3 Total 1,894,812,500 3,740,770,000 1,584,200,000 7,466,800,000 4,627,000,000 8,876,000,000
PPN (10%) 189,481,250 374,077,000 158,420,000 746,680,000 462,700,000 887,600,000
Total + PPN 2,084,293,750 4,114,847,000 1,742,620,000 8,213,480,000 5,089,700,000 9,763,600,000
*catatan jika kurs 1$ = Rp 14.000
Daftar Referensi Lift:
5 besar Otis 10 besar Hyundai
Kone Daiichi
Schindler General
Mitsubishi jaya Louser
Fujitech Sigma
Cibes
Genie
S-JEC
Mitsubishi Shanghai