You are on page 1of 6

Writing coursework, especially in a specialized field like Landscape Architecture, can be a

challenging and time-consuming task. It requires a deep understanding of the subject matter,
extensive research, and the ability to synthesize information into a coherent and well-structured
document. Here are some reasons why writing Landscape Architecture coursework can be difficult:

1. Technical Nature: Landscape Architecture involves a combination of artistic design and


technical knowledge. Balancing these aspects in coursework can be challenging, as you need
to convey both the creative and technical elements effectively.
2. Research Intensity: Comprehensive research is crucial for coursework in Landscape
Architecture. You'll need to gather information on various design principles, environmental
considerations, plant species, and more. This demands a significant investment of time and
effort.
3. Design Challenges: If your coursework involves design projects, translating conceptual ideas
into tangible designs on paper can be daunting. Precision and creativity must be balanced to
meet the requirements of the assignment.
4. Environmental Considerations: Landscape Architecture often involves addressing
environmental concerns. Understanding how your designs impact the environment and
incorporating sustainable practices adds an extra layer of complexity.

Considering the difficulties involved, seeking assistance can be a sensible choice. ⇒


HelpWriting.net ⇔ is a platform where individuals can find professional help with their
coursework. While it's important for students to engage in the learning process, getting expert
guidance can provide valuable insights and ensure a high-quality submission.

If you decide to seek help, make sure to communicate your specific requirements and expectations
clearly. Professional assistance can aid in structuring your coursework, refining your ideas, and
ensuring that your work meets the academic standards of Landscape Architecture.

Remember, using external help should be in accordance with your institution's guidelines on
academic integrity. Always prioritize your own learning and use external assistance as a
supplementary resource to enhance your understanding of the subject matter.
Implementation has involvedlandscape architects in extensive public consultation and identification
ofland use options. These are classi-fied as designated members and are not employed by the LLP,
which is aseparate legal entity. The legal consequences of this designation are minor, amounting to
anobligation on planning authorities to maintain a list of such designationsin their area and to pay
special attention to the character of the area in theexercise of their functions. Ideas and principles
have been published recently in PPG17 and its com-panion guide, PAN65 in Scotland and Planning
Policy Statement 8 inNorthern Ireland. Implementation is achievedthrough the enforcement of
consent conditions and legal agreements. Members are not obliged to have a formal written
agreement but as withpartnerships it is advantageous to do so to regulate the affairs of the busi-ness
and avoid disputes. There are separate RDPs for England, Walesand Scotland. Object of the
Contract The object of the contract must be possible. It is anoffence to kill, take or disturb bats in the
non-living area of a dwelling houseor any other place without first notifying the conservancies. If
these agencies propose PDOs, they must consult English Nature whomust respond within 28 days
with advice about impact and mitigatingactions. JCT Intermediate Landscape Supplement A
supplement to the JCT Intermediate Form with provision for increasedcosts, vandalism, dead plants
and partial possession by the employer. There are particular types of contract to suit the client’s
requirements: If the client is looking for speedy completion of the project, which has theadded
advantage of possible savings, then a management contract is thebest option. Each category of work
has differ-ent restricted acts. The normal method of hearing an appeal is by public local inquiry but
ifparties agree it can be by either: The only further challenge is by appeal to the High Court on a
point oflaw, although judicial review and appeals to the House of Lords are per-missible. In the UK
the RDR is being channelled into agri-environmentschemes such as Environmental Stewardship and
the Forestry Commis-sion’s revised Woodland Grant Schemes. This isa non-statutory consultee,
referred to for significant developments inEngland (by size or precedent). This allows for enacting
legislation to be inter-preted in accordance with the convention rights where possible. The contractor
must keep records of amount of labour, time workedand the plant used. This has the following
principal effects: To become a Chartered Landscape Architect the Landscape Institute hasintroduced
the “Pathway to Chartership” which replaces the ProfessionalPractice Examination in Autumn 2006.
However, they are expected to ensure that a client does notsuffer due to an absence of legal
knowledge and to know enough aboutthe law to be aware when specialist legal advice would be
required. Mining will be permitted if restoration conditionsrequire the site to be brought back to
agricultural, forestry or amenityuse. Obligations may: restrict devel-opment or use of the land;
require operations or activities to be carriedout in, on, over or under land; require land to be used in a
specific way;and require sums to be paid to the local authority as a single sum or peri-odically. The
contract administrator has a duty to certify when thecontractor has made them good with a
Certificate of Making Good Defects.If the contractor is responsible for the maintenance of the soft
works (postpractical completion) he or she will be required to make good any defectswithin a
specified time after practical completion. This Act introduced the basic system of developmentplans,
development control and enforcement. Natural growth of trees over adjoining land may constitutea
trespass (in England and Wales) or a nuisance. Resumption of work is notifiable to the local
planningauthority. Inspectors make 80 per cent of decisions, but where the minister is tomake the
decision the inspector reports findings of fact and their conclu-sions; then the minister makes a
decision and notifies the parties. If the figure requires to be more or less than 5% retention then
thelandscape architect shall insert the appropriate amount before tender. In countryside provision,
total access to all may be very expensive toprovide. Internationalassistance may be available to
promote their recognition and protection.
Single-Stage Selective TenderingA shortlist of tenderers is drawn up and they are issued with a full
set oftender documents for pricing. Sinceabout 2005, some planning authorities in London have
introduced feesfor pre-application advice. Designations about active management for conservation
These have been established to achieve a range, usually a combination, ofaims. The emphasis is on
nature conservation, but as most sites are ownedprivately or by land-owning organisations such as
the Ministry of Defence,the National Trusts and the Forestry Commission, military, social and eco-
nomic aims may also have to be incorporated into specific site managementagreements. The
percentage retention is to be clarifiedalong with clarification of percentage value of goods and
materials to betaken into account. A PDO can be carried out only withwritten consent of a
conservancy or in accordance with a managementagreement. Monitoring is the responsibility of the
developer and determining author-ity. There is a statutory requirement for consultation with listed
consulteesincluding the Secretary of State, adjacent local authorities, EnvironmentAgency, the
countryside agencies and also the public. Common examples of duty of care include that of an
employer toemployees or one road user to another. Specifically, duties in contract are of two kinds:
duties of care and strictduties (duties of result). Permanent pasture, permanent crops(e.g. top fruit)
woodland and non-agricultural uses were not eligible forset-aside. Reform of the Welsh
Development Plan System Part 6 of the Act reforms the Welsh development plan system,
whichcame into force in autumn 2005. Original Resolution: 1600x900 Why Do Some Graduate
Landscape Architects Have A Poor Understanding Of Planting Land8 The profession has a special
commitment to the stewardship of. 1200x900 - What is an associate degree in landscape
architecture. Specialist works require a review of outstanding requirements forinformation to or from
the contractor in connection with specialist works,and clarification that the contractor is responsible
for co-ordinating spe-cialist works and for their workmanship and materials. When agreement on all
theitems is reached a contract will be entered into based on the revised, nego-tiated tender sum.
Annual audit required.of accounts. 14. A partnership does not 14. Schedules of Rates Schedules of
Rates are used where the actual quantities of work requiredare not known at the outset and are re-
measured and valued only whenthe work has been completed. Remember, we are an assignment
writing service that has helped scores of students claim good grades. Inorder to achieve uniformity in
decision-making, planning control is heav-ily influenced by policy guidance. In Scotland, new gov-
ernment guidance on green belts was published in 2005 in the draft SPP21. Undefined workWork
where no information is available. There are two alternative means of control: Scotland Building
control in Scotland is based on a series of building Acts (Building(Scotland) Acts 1959, 1970 and
most recently 2003) and bylaws. The 12 law lords or lords of appealinclude Scottish and Northern
Ireland judges. Latent damage refers to cases where the damage could not reasonablyhave been
discovered at the time when it actually occurred. However, operations to do with the business of
agriculture and forestryare still considered to be permitted development and thus are free from plan-
ning control. PPG1 was replaced by the Planning Policy Statement 1 (PPS1) in 2005.The PPS is less
specific than PPG1, but it sets out key principles of sus-tainable development, spatial planning and
community involvement. Compensation may be available where prohibition or suspension
ordershave been served and, since 1987, for expenditure voluntarily incurred inalleviating damage to
amenity, or for restoration. They will include a bank manager, solicitor andaccountant. AA Stage 4:
Assessment where there are no alternative solutions exist and where adverse impacts remain. Forest
Design Plans (FDP)A mechanism used by Forest Enterprise, a Forest Design Plan (FDP) is along-
term outline design plan covering at least 20 years. The Scottish national parks (Loch Lomond and
the Trossachs designatedin 2002, and the Cairngorms designated in 2003) are also governed
bynational parks authorities.
Rather than compromise on the depth and integrity of assignment submitted it would be prudent to
seek Landscape Architecture assignment help. The conservancy must consider any views expressed
by the consulteesincluding the Secretary of State for the Environment, Transport and theRegions (in
England). World Heritage sites are the natural and man-made treasures of theworld. The schedule
will be used to value any additional works overthat for which the lump sum has been quoted. The
UK Forestry StandardPublished in 1998, this sets out the Government’s framework for thepractice
of sustainable forestry management. The Landscape Institute offers guidance on programmed
instalmentsin Engaging a Landscape Consultant: Guidance for Clients on Fees. Directors and
employees arepaid salaries out of the profits of the company, which are tax deducted.Accounts must
be audited and filed at Companies House. The Protection of Animals (Scotland) Act 1912This deals
with cruelty to domestic and wild animals. NB The graphs are indicative only and are intended to act
as a guide. An Order may be made to turn a publicfootpath into a cycle track. Legality of Object The
object of the contract must not be for any purpose that contravenesthe law such as agreements to
commit crimes or torts. Particular combinations ofgeology, landform, soils, vegetation, land use, field
patterns and humansettlement create character’. SAPs and HAPs include a summary of objectives,
targets and actions required to maintain orenhance populations and habitats. A letter or memorandum
of agreement should be sent by registered postor recorded delivery as, should litigation arise, it may
be necessary toproduce evidence of the client’s receipt. For example, the burden on services is
substantial or thechange of use has a major affect on the neighbourhood. Country parks have few
resources for maintenance or develop-ment, but in England and Wales the CPN provides guidance on
goodpractice. Take up by farmers has been low, but all together, by 1995,230 ha. Scottish Section 75
Agreements Scottish planning authorities are bound by section 75 of the 1997 Town andCountry
Planning (Scotland) Act. In the case of local authorities, identifying a risk and having the powerto
do something about it does not necessarily create a duty, but each casewould be assessed
individually. Minimumenvironmental standards are now an integral and compulsory part ofagri-
support programmes and member states may attach specific envir-onmental conditions to grants. It
can also be usedwith the JCLI Agreement for Landscape Works for the maintenance oflandscape
works. Only in excep-tional circumstances should the landscape architect recommend otherthan the
lowest tender because all are supposed to be suitable. Introduction2. Project3. Contract4. Statutory
obligations5. However it is now recognized that the varied agricultural landscapes of Europe, and
theassociated biodiversity stemming from centuries of agriculture, may bejeopardized if cultivation
ceases. Many universities in Australia are offering courses in the domain of Landscape Architecture.
However, thenumber of public parks increased rapidly after the Public Health Act 1875,which was
the first major Act that enabled local authorities to acquire andmaintain land for recreation and raise
government loans to do so. The UKBAP includes Species Action Plans (SAPs) for 391 species
andHabitat Action Plans (HAPs) for 45 habitats. Statutory obligations Compliance with statutory
requirements regarding noise, safety, buildingregulations, local by-laws and restrictions, Health and
Safety Executive,etc. Duration of Copyright The Duration of Copyright and Rights in Performance
Regulations 1995defines the duration of copyright in each category. The contract administrator must
make in writing an extension of thetime for completion that is reasonable. (An event that causes
delay doesnot automatically result in an extension; it must cause delay to the criticalpath of the
contract).
The Weed Act 1959 contains powers to prevent the spread ofspear or field thistles, curled or broad-
leaved docks and Ragwort. Disability Discrimination Act 1995 (DDA 95) Under DDA 95, by the
end of 1999 service providers should haveamended policies, procedures and practices that prevent
service uptake,and also provide additional help (e.g. audiotape for interpretation) fordisabled people.
Thisrule affected third parties who stood to gain by the contract but untilrecently had no redress.
Joint Local Development Documentscan be prepared by two or more LPAs. AONB refers to any area
in England and Wales which is not a national park,but which appears to the Countryside Agency to
be of such outstandingnatural beauty that it is desirable that the provisions of the Act should
alsoapply. If agreed fees may be recalculated on a monthly,quarterly or yearly basis. This allows for
enacting legislation to be inter-preted in accordance with the convention rights where possible. It is
an offence to knowingly cause or permit these offences. Compensation may be available where
prohibition or suspension ordershave been served and, since 1987, for expenditure voluntarily
incurred inalleviating damage to amenity, or for restoration. A suitable basis for this process is set
out in the Landscape Institute’s Guide to Procedure forCompetitive Tendering, which is divided into
five sections with appendices.The Institute emphasises that unless the process of tendering selects
thebest consultant for the project with least effort from all parties, it will notgive the best value for
money. If development is temporarily suspended the planning authority mayrequire that steps shall
be taken for the protection of the environment.There must have been no working for at least 12
months and resumptionof work is likely. Definition Building operations refer to rebuilding, structural
alterations or additionsof buildings and other operations normally undertaken by a person carry-ing
on business as a builder. They are also a mechanism for keeping allparties informed of the situation
with the contract and any issues arisingfrom the contract. Obvious examples would be
tenants,purchasers or funders of buildings. Acceptance of Tender The tender report is sent to the
client with a request for approval of the rec-ommendation. It involves a weigh-ing up of the
relationship of the parties and the nature of the risk to thepublic. Original Resolution: 424x565 Sri
Kumaran's Children Home and Education Council. Inspectors are usually respectedmembers of the
planning profession. These areclassified as designated members and are not employed by the LLP,
whichis a separate legal entity. The circular referred to Article 8 of the Habitats Directivewhich
requires member states to encourage management of linear land-scape features with a continuous
structure, or function, of major import-ance for wild flora or fauna as stepping stones essential for
migration,dispersal or genetic exchange, e.g. rivers and their banks, traditional fieldboundary
systems, ponds and small woods. The Countryside Council for Wales CCW is responsible for
landscape and nature conservation and country-side recreation in Wales. Definition Full planning
permission refers to an application for full permission withcomplete details. Shortlist A shortlist of
tenderers is drawn up but no guidance is given on numbersin the practice note. This is what set's our
Landscape Architecture Assignment Help apart from the run of the mill ones that we find aplenty
these days. So far schemes have had mosttake up on marginal agricultural land, rather than prime
agro-industryareas. Payment of Nominated SubcontractorsIt is usually stipulated that subcontractors
must be paid within 14 days ofcertified completion of their works. Original Resolution: 375x750
Checking in on The Dennis Technical Education Center. For example, incompetent design could be
in breach of con-tract and constitute negligence (subsequent defects) and, say, implicate thepractice
as a whole (partnerships and companies). For an LLP to be incorporated, twoor more persons
associated for carrying on a lawful business with a viewto profit must be named in the incorporation
document. The minister sets up a commission, which worksin two stages: A report is prepared to the
minister who makes the decision.
Also, the conservancies must be consulted before road building orimprovement in or near a reserve is
initiated. Natural England has responsibility for biodiversity, landscape and wildlife in rural, urban,
coastal and marineareas. All work is re-measured as it proceeds and therefore thefinal price is
uncertain. They provide the framework to inform the prepar-ation of local development documents,
local transport plans and regionaland sub-regional strategies that have a bearing on land use
activities.They will incorporate: RSSs carry statutory status. They should take stepsto prevent any
pollution or risk to human health, recovering the costfrom the occupier of the land unless the
authority has accepted the sur-render of the relevant licence. Theyare responsible for producing
development plans and for determiningapplications for land use development (planning
applications). Our experts provide consultation services and samples and do not encourage students
to use them for submission. AGLV status may afford slightly more protection to countryside
areasthan green belt designation, but local planning officers have a good dealof discretion about how
that protection may be defined in the local plan. Only when students are content with the
assignment, we consider it done. In general asmaller practice will incorporate a private company and
the individualswho would otherwise be partners will be the directors and also theshareholders.
Spatial planning bringstogether and integrates policies for the development and use of land withother
policies and programmes outwith the traditional land use planningsystem. If no expressdisclaimer of
responsibility is made a person will be liable for the conse-quences of a statement which they make
in circumstances where they aredeemed to have assumed responsibility for the outcome.
Introduction2. Project3. Contract4. Statutory obligations5. Dayworks must always be authorized
beforehand and it is important tocheck that the rates, prices, quantity of labour and materials are
correct. He or she also has additional responsibilitiesunder CDM regulations. NB The graphs are
indicative only and are intended to act as a guide. As a result of this the LandscapeInstitute
produced The Guide to Procedure for Competitive Tendering. The case indicates that a successful
balance has beenfound between nature conservation and landowners’ interests. Under the CROW
2000 Act and NC(S) Act 2004, newoffences have been created which may lead to enforcement
action if car-ried out without reasonable excuse. LiabilitiesIn addition to all their normal individual
liabilities, each partner hasadded responsibilities as a member of a partnership. The JCLI Form of
Contract is a very simple contract originally basedmainly on the JCT Minor Works contract.
Indicative thresholdEIA less likely to be required but test remainslikelihood of significant
environmental effects. Itinvolves collaboration between the design team and the selected con-tractor
in finalizing the design and development of production drawings,the health and safety plan and the
Bills of Quantities for the works, andwill result in a final agreed sum for the works. The Public
Contracts Regulations 2006 and the Utilities ContractsRegulations (England, Wales and Northern
Ireland). (Scotland will be imple-menting the Directive under separate regulations) covers the
requirementsof tendering public works or supply contracts Europe-wide to achieve faircompetition. It
provides Community-wide protection for all wild birds and theirhabitats. Hence, often students need
help with their Landscape Architecture Assignments. Detailed explanation and interpretation of
development isgiven in the General Permitted Development Order (GDPO) 1995, revisedin 2003.
With ICE contracts Bills of Quantities are shorter than standard build-ing contracts and the method
of measurement used is more concise.Complex and difficult operations may be described and
measured as oneitem. Other developments’ fees relate to the floor space. The design is not detailed
when thecontractor is engaged, therefore the design evolves as work proceeds.

You might also like