#Case Studies of Rooppur Nuclear Power Plant :

Location: The Rooppur Nuclear Power Plant is located near the


town of Rooppur in the pabna district of bangladesh.
Ownership and Operation: This Power Plant is owned by the
Bangladesh Atomic Energy Commision.
Type of Reactor: The power plant features Russian-designed
VVER-1200 pressurized water reactors.
Design: The main feature of Rooppur NPP is its simple design.
Each reactor unit comprises a reactor and four circulation loops,
each of which includes circulation pipelines, reactor coolant pump
and horizontal steam generator.
Purpose: The goal of the Rooppur Neclear Power Plant is to
meet the growing demand for electricity in Bangladesh and
diversify the country’s energy sources.
Construction and Timeline: The project is being implented in
multiple phases since its beginning in 2017.
International Colaboration: This project is a collaboration
between Russia and Bangladesh. The Russain state nuclear
agency known as Rosatom is directly engaged with this project
and it is a key partner in the construction and operation of the
plant.
Budget: With a Russian loan amounting to US $11.38 billion the
project is being built on a budget of US $12.65, with repayments
commencing 10 years after operation. And the rest is financed by
Bangladeshi Government.
Advantages: Out of many advantages one of the signicant one
about Rooppur Neuclear Power Plant is the increased service life
of main equipment to 60 years without replacing it. The turbine
plant major equipment also have a service life of 50 years.

#Comparative Analysis with Global Mega Project:


One notable global mega project is Hinkley Point C Nuclear
Power Station in The United Kingdom.

Rooppur Nuclear Power Hinkley Point C Nuclear


Topics Plant Power Station
(Bangladesh) (The United Kingdom)

Budget US$12.65 Billion US$38.5 billion

Collaboratio France, Chaina and The


Russia and Bangladesh
n UK

Capacity 2,160 MWe (planned) 3,260 MWe (planned)

Began: November 2017 Began: March 2017


Constrution
Comission Date: 2024 Commision Date: 2028
Timeline
(expected) (expected)

Water
Padma River Severn Estuary
Source