DATE OF OBSERVATION:

RISK LEVEL LOW MEDIUM HIGH 1/8/2022 Access and Egress

MEDIUM Confined Space


Electrical Safety
Emergency Preparedness

TYPE OF OBSERVATION: UNSAFE CONDITION


CONCERN DISCIPLINE GENERAL NEGATIVE Fire Prevention
Hand Tools

OBSERVED COMPANY CONTRACTOR /


Dr. Concrete
SUBCONTRACTOR

OBSERVATION It was observes that the Dr. Concrete office and storage
area is not barricaded and also their waste area left Housekeeping
open and the rubbish scattered everywhere

OCCUPATIONAL HEALTH & SAFETY


Hygiene / Welfare

Lifting Operations
IMMEDIATE ACTIONS TAKEN BY The PM was informed Issue was communicated with
OBSERVER HSE Bahaa. Manual Handling

Material / Equipment Trans

Office Safety

Permit to Work
RECOMMENDATIONS / SUGGESTIONS TO The office and storage areas must be barricaded and
IMPROVE HSE the waste area should be barricaded by orange plastic Personel Protective Equipm
mesh to keep the rubbish insides wast area.
Pressure Testing / Blowing

Procedures / Instructions /

Radiography

REPORTED BY / COMPANY / POSITION: Mohammed Khalid Road Safety / Traffic Mana

HAZARD CLASSIFICATION: Housekeeping Scaffolding / Work Platform

AREA: CAPCON BEFORE AFTER Signs and Barriers

LOCATION: OTHERS Slips, Trips, Falls

PH / PRA: STATUS: CLOSE DATE OF CLOSURE: 1/19/2022


Working at Heights
Work Place Conditions (Du

Biodiversity (Flora/Fauna)

ENVIRONMENT
Emissions (Air, Dust, Noise
Land Disturbance
Investigation Level for
Consequence
Potential Consequence

Harm to Environment Damage to Impact on


Incident Severity
People Effect Assets Reputation
Very unlikely Unlikely Possible

Slight injury or
Slight impact
Health effects
Slight damage.
Negligible Some public
Negligible (First Aid) No disruption to
Effect awareness
operation

Minor injury or
Local environmental Minor damage
Health effects Limited Impact
damage. Within the Brief disruption
Low (Medical Treatment Some public
fence and within (cost10K€-100K€,
of Work Restricted concern
systems 1day downtime)
Case)

Major injury or Contamination Local damage


Health effects Considerable Impact
Damage sufficient to Partial shutdown
Medium Regional public
attack the (cost 100k€-500k€),
concern
environment. 1-7 days shutdown
(Lost Time Injury)

Major damage
Limited loss of
Single fatality or Partial operation
discharges of known
High Permanent Total loss( cost 500k€- National impact
toxicity. Affecting
Disability 3M€) 2weeks
neighbourhood.
shutdown

Extensive damage
Major environmental
Substantial or total
damage. Extended
operation loss (cost
Major Multiple fatalities measures to restore International impact
3M€-10M€), more
the contaminated
than 2weeks
environment.
shutdown

LOW MEDIUM HIGH


Investigation Level for

Potential Consequence

Likely Very Likely

You might also like