DATE OF OBSERVATION:

RISK LEVEL LOW MEDIUM HIGH 12-May-22 Access and Egress


Report No 740 Chemical Substances (Use/H

MEDIUM Confined Space


Electrical Safety
Emergency Preparedness

Excavation
TYPE OF OBSERVATION: UNSAFE CONDITION
CONCERN DISCIPLINE SCAFFOLDING Fire Prevention

Hand Tools

OBSERVED COMPANY CONTRACTOR /


DR.CONCRETE Heavy Machinery / Equipmen
SUBCONTRACTOR
Hot Works
OBSERVATION It was observed the ladder of the scaffolding inside
GTG-5 is not suitable which does not extend above the Housekeeping
landing surface according the standards.

OCCUPATIONAL HEALTH & SAFETY


Hygiene / Welfare

Lifting Operations
IMMEDIATE ACTIONS TAKEN BY The Issue was communicated with supervisor Jabbar
OBSERVER abed. Manual Handling

Material / Equipment Transpo

Office Safety

Permit to Work
RECOMMENDATIONS / SUGGESTIONS TO The proper access should be provided. The ladder
IMPROVE HSE should be extended more the 80 cm from the contact Personel Protective Equipmen
point with platform.
Pressure Testing / Blowing (P

Procedures / Instructions / MS

Radiography

REPORTED BY / COMPANY / POSITION: Mohammed Khalid/ CALIK ENERGY/ HSE Supervisor Road Safety / Traffic Manage

HAZARD CLASSIFICATION: Access and Egress Scaffolding / Work Platforms

AREA: CAPCON BEFORE AFTER Signs and Barriers

LOCATION: GTG 5 Slips, Trips, Falls

PH / PRA: Jabbar Abed/ Fatih Aribas STATUS: CLOSE DATE OF CLOSURE: 15-May-22
Working at Heights
Work Place Conditions (Dust,

Biodiversity (Flora/Fauna)

ENVIRONMENT
Emissions (Air, Dust, Noise)
Land Disturbance
Investigation Level for
Consequence
Potential Consequence

Harm to Environment Damage to Impact on


Incident Severity
People Effect Assets Reputation
Very unlikely Unlikely Possible

Slight injury or
Slight impact
Health effects
Slight damage.
Negligible Some public
Negligible (First Aid) No disruption to
Effect awareness
operation

Minor injury or
Local environmental Minor damage
Health effects Limited Impact
damage. Within the Brief disruption
Low (Medical Treatment Some public
fence and within (cost10K€-100K€,
of Work Restricted concern
systems 1day downtime)
Case)

Major injury or Contamination Local damage


Health effects Considerable Impact
Damage sufficient to Partial shutdown
Medium Regional public
attack the (cost 100k€-500k€),
concern
environment. 1-7 days shutdown
(Lost Time Injury)

Major damage
Limited loss of
Single fatality or Partial operation
discharges of known
High Permanent Total loss( cost 500k€- National impact
toxicity. Affecting
Disability 3M€) 2weeks
neighbourhood.
shutdown

Extensive damage
Major environmental
Substantial or total
damage. Extended
operation loss (cost
Major Multiple fatalities measures to restore International impact
3M€-10M€), more
the contaminated
than 2weeks
environment.
shutdown

LOW MEDIUM HIGH


Investigation Level for

Potential Consequence

Likely Very Likely