HSE Risk Assessment for Reinstatement work PROJECT:

Contract: RM 12B
Risk Rating Risk Risk Rating Risk Responsible
Without With Controls
No Hazard Consequence Level Prevention Level Person
Controls Measures
Measures

L S RR L S RR

Use of hand Injury to HR


1 tools persons 5 2 10  All competitors will be training Site Engineer
generally MR ,Supervisor ,
 Competitors informed of
requirement to provide all hand 5 1 5 Foreman
tools in a safe condition ,Operator
(information contained in joining safety
instructions) Officer
 Competitor hand tools inspected
by SKILLBUILD trade expert
 Damaged/defective tools to be
taken out of use immediately
 Competitors to be instructed by
joining instructions to provide all
necessary PPE (gloves, safety
shoes, safety helmets, safety
glasses/goggles)
 Experts to carry out periodic
visual inspections throughout
competition, defective tools to be
removed immediately

 Practical demonstration by
2  Use of Material SKILLBUILD expert to small groups Site
Power Damage ,Hand 5 3 15 ER of competitors 3 1 3 LR engineer,
Tools finger ,  Pre use visual inspection for supervisor,
Body injury damage/defects to tools, cables, foreman
plugs - defective tools to be taken
out of use immediately
 Competitors to be informed by
joining instructions to provide all
necessary PPE (gloves, hearing
protection, defenders/plugs, dust
masks)
 Cables to be routed away from
aisles and walkways where they
could create trip hazards to other
persons and/or expose cables to
potential damage.
 Competitors to be assessed
individually before approval given
to operate power tools
 All power tools brought to
competition by competitors to
have up-to-date PAT test
.
3 Vehicular Vehicular 2 2 4 MR Exercise caution, use flashing lights 1 2 2 LR site Engineer
Access Accident and dipped head lights, be aware of ,Supervisor ,
surroundings. Adhere to site speed Foreman
limits. Plant will not divert from safety
identified access routes. Officer

DOC.NO.RM12B/MRC/RA/003
4  Housekee  Dust/plaste 5 2 10 HR  Competitors given verbal 3 1 3 LR site Engineer
ping r debris instructions to maintain and/or ,Supervisor ,
clean/tidy up individual workplaces Foreman
during and after competition work safety
times Officer
 Experts/support staff to
dismantle competitors work after
completion appropriate PPE to be
worn during such work ie dust
masks, goggles, safety shoes
 Wet/damp sweeping techniques
to be used for general cleaning of
competition area to control dust
levels
 Tools/equipment to be stored in
lockable tool box

5  Materials Skin Allergy 2 2 4 MR  All materials to be stored in 1 3 3 LR site Engineer


like SKILLBUILD store or location ,Supervisor ,
Adhesives approved by SKILLBUILD expert Foreman
Joint fillers within competition area. safety
Polyester  Competitors instructed by Officer
resins SKILLBUILD expert in safe use and
/Cement handling of materials
 Provision and use of PPE (gloves,
goggles, dust masks)
 Competitors informed of
personal hygiene requirements,
wash hands after use/contact and
before eating, drinking and smoking

DOC.NO.RM12B/MRC/RA/003