Contract: RM 12B
Risk Rating Risk Risk Rating Risk Responsible
Without With Controls
No Hazard Consequence Level Prevention Level Person
Controls Measures
Measures
L S RR L S RR
Practical demonstration by
2 Use of Material SKILLBUILD expert to small groups Site
Power Damage ,Hand 5 3 15 ER of competitors 3 1 3 LR engineer,
Tools finger , Pre use visual inspection for supervisor,
Body injury damage/defects to tools, cables, foreman
plugs - defective tools to be taken
out of use immediately
Competitors to be informed by
joining instructions to provide all
necessary PPE (gloves, hearing
protection, defenders/plugs, dust
masks)
Cables to be routed away from
aisles and walkways where they
could create trip hazards to other
persons and/or expose cables to
potential damage.
Competitors to be assessed
individually before approval given
to operate power tools
All power tools brought to
competition by competitors to
have up-to-date PAT test
.
3 Vehicular Vehicular 2 2 4 MR Exercise caution, use flashing lights 1 2 2 LR site Engineer
Access Accident and dipped head lights, be aware of ,Supervisor ,
surroundings. Adhere to site speed Foreman
limits. Plant will not divert from safety
identified access routes. Officer
DOC.NO.RM12B/MRC/RA/003
4 Housekee Dust/plaste 5 2 10 HR Competitors given verbal 3 1 3 LR site Engineer
ping r debris instructions to maintain and/or ,Supervisor ,
clean/tidy up individual workplaces Foreman
during and after competition work safety
times Officer
Experts/support staff to
dismantle competitors work after
completion appropriate PPE to be
worn during such work ie dust
masks, goggles, safety shoes
Wet/damp sweeping techniques
to be used for general cleaning of
competition area to control dust
levels
Tools/equipment to be stored in
lockable tool box
DOC.NO.RM12B/MRC/RA/003