You are on page 1of 3

Task Specific Risk Assessment Date: October 2022

TASK SPECIFIC RISK TSRA 9


ASSESSMENT REF NO:
ACTIVITY: Replacement distribution board (s) / switch gear, MPCT Bldg 9, Wrexham Barracks

Keys:

Calculation: Risk (R) = (L) x (S) SEVERITY OF INJURY (S) PRE/POST PERSONS AT RISK
CONTROLRISK RATING
LIKELIHOOD OF HARM (L) Minor (1) Serious (2) Major (3)
Unlikely (1) 1 2 3 L = LOW E-Employees V-Visitors
Possible (2) 2 4 6 M = MEDIUM C-Contractors P-Public
Likely (3) 3 6 9 H = HIGH

ACTIVITY / HAZARD /RISK PERSONS PRE- CONTROL MEASURES POST-


AREA OF AT RISK CONTROL CONTROL
CONCERN RISK RISK
RATING RATING

1. Working Electric Shock E,C H Only competent, trained persons to work with electricity. M
with Electricity
Electrocution Access and egress arrangements to be determined prior to commencement of work.
Burns Access to the work area must be restricted to authorised persons only.
Fire Disconnection and Isolation procedures to be followed at all times. (See H&S Policy)
Lock devices to be used to prevent energisation of the installation.
Notices posted warning that installation work in progress and prohibiting energisation.
Electricity supply must be isolated and proved to be dead. NO LIVE WORKING.
All drawings and specifications required are at hand and understood.
All persons involved in the job are fully aware of the hazards and the safety precautions that
must be taken.
Other hazards must be considered and appropriate control measures put in place.
Reference should be made to the risk assessment for the access method used.
Only use 110v or battery operated power tools to be used on site.

© SM&MS Limited
Task Specific Risk Assessment Date: October 2022

ACTIVITY / HAZARD /RISK PERSONS PRE- CONTROL MEASURES POST-


AREA OF AT RISK CONTROL CONTROL
CONCERN RISK RISK
RATING RATING

Be aware of the emergency arrangements in case of electrocution.


Be aware of the fire precaution procedures on site.
Work is to be carried out within a closed, weather proof environment on a standard electrical
installation only.
During testing and commissioning access to the work area will be restricted to authorized
persons only. Warning signage will be displayed.
Only competent, appropriately trained, experienced, knowledgeable persons to undertake the
work, who understand the safe working practices and the equipment on which they are
working. (NICEIC approved)
All testing equipment is suitable for the job and properly maintained.
All tools and testing instruments are insulated.
All tools and testing instruments must be calibrated annually.
Such work must be closely supervised to ensure that the appropriate safe system of work are
operated at all times in order to prevent danger.
Appropriate precautions will be taken to prevent testers coming into accidental contact with
exposed live parts.
Ensure all electrical equipment and installations are left safe on completion of work.
Follow all safe working procedures as detailed within the H&S Policy.
If working at height please see ‘Working at height risk assessment’ in conjunction with this
document.

© SM&MS Limited
Task Specific Risk Assessment Date: October 2022

Additional Controls Required On Site

Hazard Control Measures Implemented on site

Public access POST SIGNS TO ACCESS DOORS AND LOCK AT ALL TIMES

Electrocution PROVE ‘DEAD’ AND LOCK OFF ALL POTENTIAL POWER SUPPLIES.

I confirm that residual risks are acceptable and controls listed above have implemented in full (To be signed by CRB Services)

Name: Graeme Winterburn Signature: Job Title: Director Date: 10 October 2022

This risk assessment should be reviewed on an annual basis to take account of changes in working practices, equipment, staff etc. The assessment should also be reviewed if
there are any significant changes or any reason to believe that it may be invalid.

© SM&MS Limited