CONSTRUCTION OF BLOCK WALL Risk Assessment

Project: Document Ref


No:
Assessor:
Date: Review Date:

Persons at Risk Risk Rating Existing Control Measures Residual


Activity Potential Hazards E S/C V P L S R Level of Specified Level of
Risk Risk

Banksman Stuck by site X X X 2 3 6 M All banksman are to be trained and competent M


Vehicles / collision with the site surrounding, all vehicle deliveries to
With site be called in via Radio and controlled by the
Equipment. Banksman. For congested area Diplomat
Engineering to provide additional operatives to
support control of deliveries and safe passage
from site.

3rd Party Slips, Trips and injury X X X 2 2 4 L During the Construction of Block wall the area to L
protection due to the movement be barricaded with caution tapes and not to allow
of construction area. non –DE people at all times till the completion of
work.

Persons at Risk: Risk Rating: Likelihood Rating: Severity Rating: Level of Risk:

E= Diplomat Engg L = Likelihood 4 Likely 4 Fatal 10-16 High


S/C = Sub-Contractor S = Severity 3 Probable 3 Major injury 6-9 Medium
V= Visitor R = Risk 2 Possible 2 Minor injury 1-5 Low
P= Member of the public ( Severity x likelihood) 1 Improbable 1 No injury
CONSTRUCTION OF BLOCK WALL Risk Assessment
Project: Document Ref
No:
Assessor:
Date: Review Date:

Persons at Risk Risk Rating Existing Control Measures Residual


Activity Potential Hazards E S/C V P L S R Level of Specified Level of
Risk Risk

Hand Tool Slips, Trips and X X X 2 3 6 M All hand tools to be regularly inspected by M
Operational injury. technicians to identify any product defects. Any
defects to be recorded and equipment disposed
off or replaced.

M
House Slips & Trips X X X 2 3 6 M Diplomat Engineering Site manager to ensure that
keeping all operatives regularly tidy their work areas to
ensure a clear and safe workspace is maintained.
Diplomat Engineering Manager must ensure that
all emergency planning access / equipment is free
from obstructions at all times and that the site is
left in clear and tidy condition at the end of each
shift.

Barricades Slips, Trips and X X X 2 3 6 M


Operational injury Block work construction area to be barricaded
with caution tapes or cones so that the area will M
be clearly visible to all site operatives to avoid any
slips and trips.

Persons at Risk: Risk Rating: Likelihood Rating: Severity Rating: Level of Risk:

E= Diplomat Engg L = Likelihood 4 Likely 4 Fatal 10-16 High


S/C = Sub-Contractor S = Severity 3 Probable 3 Major injury 6-9 Medium
V= Visitor R = Risk 2 Possible 2 Minor injury 1-5 Low
P= Member of the public ( Severity x likelihood) 1 Improbable 1 No injury
CONSTRUCTION OF BLOCK WALL Risk Assessment
Project: Document Ref
No:
Assessor:
Date: Review Date:

Persons at Risk Risk Rating Existing Control Measures Residual


Activity Potential Hazards E S/C V P L S R Level of Specified Level of
Risk Risk

Scaffolding As enumerated in the X X X 2 3 6 M As specified in the risk assessment for scaffolding M


where risk assessment for
necessary scaffolding

Mixing & Irritant, contact X X X 3 3 9 M All operatives in contact with this material must M
applying dermatitis increase PPE to cover gloves dust mask and
cement sand goggles at all times.
mortar

Lifting of
blocks and Injury resulting from X X X 2 3 6 M All operatives to carry the materials of such a M
other heavy lifting the material. weight which they can endure so as to avoid any
building injury.
materials.

Persons at Risk: Risk Rating: Likelihood Rating: Severity Rating: Level of Risk:

E= Diplomat Engg L = Likelihood 4 Likely 4 Fatal 10-16 High


S/C = Sub-Contractor S = Severity 3 Probable 3 Major injury 6-9 Medium
V= Visitor R = Risk 2 Possible 2 Minor injury 1-5 Low
P= Member of the public ( Severity x likelihood) 1 Improbable 1 No injury