Demolition of block wall & Lifting of material to first floor Risk Assessment

Project: Document Ref


No:
Assessor:
Date:27/07/09 Review Date: Site Start

Persons at Risk Risk Rating Existing Control Measures Residual


Activity Potential Hazards E S/C V P L S R Level of Specified Level of
Risk Risk

Banksman Stuck by site X X X 2 3 6 M All banksman are to be trained and competent M


Vehicles / collision with the site surrounding, all vehicle deliveries to
With site be called in via Radio and controlled by the
Equipment. Banksman. For congested area Diplomat
Engineering to provide additional operatives to
support control of deliveries and safe passage
from site.

3rd Party Slips, Trips and injury X X X 2 2 4 L During the demolition stage of the works, DE L
protection from falling debris. Labour to barricade the area around which debris
(during is likely to fall to ensure that all non – DE people
demolition) not to enter the area of demolition. DE will provide
protection and clamping as required in the area to
be demolished and the route that leads to it. All
routes to be pre-agreed with MAF and ALEC to
ensure no emergency planning is compromised.

Persons at Risk: Risk Rating: Likelihood Rating: Severity Rating: Level of Risk:

E= Diplomat Engg L = Likelihood 4 Likely 4 Fatal 10-16 High


S/C = Sub-Contractor S = Severity 3 Probable 3 Major injury 6-9 Medium
V= Visitor R = Risk 2 Possible 2 Minor injury 1-5 Low
P= Member of the public ( Severity x likelihood) 1 Improbable 1 No injury
Demolition of block wall Risk Assessment/Method of statement
Project: Grand SPA, Aswaaq Mall Document Ref
No:
Assessor:
Date: 01/08/2010 Review Date:

Persons at Risk Risk Rating Existing Control Measures Residual


Activity Potential Hazards A S/C V P L S R Level of Specified Level of
Risk Risk

Demolition Mechanical Parts X X X 2 3 6 M Arco trained work force to handle the tools and M
with Tools Injury/ equipment control the activities.
malfunction

Presence of Injury due to the X X X 2 3 6 M Arco Technician to properly check the block wall M
Cables and presence of cables to be demolished for any live cables and to
other foreign etc. disconnect the same by the trained operatives
objects. before undertaking demolition.

Falling Irritant, Allergic Arco Labour to wear proper PPE, including Nose
debris reactions X X X 2 3 6 M Mask, goggles and the area to be properly M
cleaned.

Collection & Slips & Trips and


Movement of injury from mainly Debris should be collected by Arco labor and
Debris vehicles. X X X 2 3 6 M M
disposed off in a route predetermined and the
Supervisor in charge of the operation to
Lifting of Injury due to slippage coordinate with building management on pre-
materials of pieces while lifting agreed routes.
with boom and placing.
loader. X X X 2 3 6 M M
Arco trained workforce to handle the lifting and
loading work. Trained technicians will check
Falling of Injury due to the falling periodically the machinery .
materials down of aterials. X X
X 2 3 6 M
placed near Debris removed from the site shall be immediately M
the opening cleared off
Persons at Risk: Risk Rating: Likelihood Rating: Severity Rating: Level of Risk:

A = Arco L = Likelihood 4 Likely 4 Fatal 10-16 High


S/C = Sub-Contractor S = Severity 3 Probable 3 Major injury 6-9 Medium
V = Visitor R = Risk 2 Possible 2 Minor injury 1-5 Low
P= Member of the public ( Severity x likelihood) 1 Improbable 1 No injury

Demolition of block wall Risk Assessment


Project: Document Ref
No:
Assessor:
Date: Review Date:

Persons at Risk Risk Rating Existing Control Measures Residual


Activity Potential Hazards E S/C V P L S R Level of Specified Level of
Risk Risk

Hand Tool Slips, Trips and X X X 2 3 6 M All Hand tools to be regularly inspected by M
Operational injury. technicians to identify any product defects. Any
defects to be recorded and equipment disposed
off or replaced.

House Slips & Trips and X X X 2 3 6 M DE Site manager to ensure that all operatives M
keeping Operational injury. regularly tidy their work areas to ensure a clear
and safe workspace is maintained. Diplomat
Engineering Manager must ensure that all
emergency planning) access / equipment is free
from obstructions at all times and that the site is
left in clear and tidy condition at the end of each
shift.

Demolition Slip & Trips and X X X 2 3 6 M The area of demolition to be clearly identified with
area operational injury. caution tapes, cones for other people not to enter
M
the area of demolition.

Persons at Risk: Risk Rating: Likelihood Rating: Severity Rating: Level of Risk:

E= Diplomat Engg L = Likelihood 4 Likely 4 Fatal 10-16 High


S/C = Sub-Contractor S = Severity 3 Probable 3 Major injury 6-9 Medium
V= Visitor R = Risk 2 Possible 2 Minor injury 1-5 Low
P= Member of the public ( Severity x likelihood) 1 Improbable 1 No injury