RISK ASSESSMENT FORM

Project: Park Point 5AB Date: 20.09.2022 Reference Number: A69


Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Umair ali Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR INSTALLATION AND DISMANTLING OF LOADING PLATFORM
RISK RATING RISK LIKELIHOOD Risk Rating
RATING 6 & 9 = High Risk

SEVERITY
Severity-S Likelihood-L 3 & 4 = Medium Risk
3 2 1
1 & 2 = Low Risk
H Major Injury/ Pollution/ Damage H Likely 3 9 6 3 Risk Rating = S X L = R
M Minor/Pollution / Damage/ Loss M Possible 2 6 4 2
L Injury/Low Damage / Loss L Never/Very Unlikely 1 3 2 1
Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating
A69 Lifting Operations  Collision/Collapse - Death, ☒Employees  Approved method Statement / Risk assessment for Lifting ☒ Project Manager
using Tower crane Serious Injury, property damage activities & Plan must be in place prior to start the work activity ☒ Construction
for Shifting Platform  Ensure Job safety analysis (JSA) /Prestart briefing/TBT is given.
☒Contractors Manager
and Accessories to  Falls of material - Death, Serious  All lifting operations must be under control of an ‘appointed
/ Sub person’ who will be competent to take overall responsibility ☒ Project Engineer
work area Injury, property damage
 A Lifting Operation Permit must be in place that considers ☒ Foremen
weight of load, operating radius/area of lift, , ground conditions, ☒ HSE for monitoring
 Failure of lifting equipment & positioning of crane, and lifting equipment required.
accessories  An assessment of the ground conditions must be carried out by
a competent person.
1  Struck by load leading to loss of 2 4 8  Crane must be sited with min 600 mm clearances around.
body parts, injury  Crane must have firm level base with load bearing checks made
on ground to support weight of crane and load, shock loading,
wind stress and slewing torques. 1 2 2
 Exclusion zones must be set up prior, during lifting operations.
Erection of crane must be carried out by competent crane
erectors.
 2 Tag lines should be used on platform to help balancing during
lifting operation.
 Workers should be trained on safe working around mobile crane
during lifting operations.
 Weather condition should be monitored and no lifting during high
wind condition.
 Slinging of loads must be carried out by competent rigger
 Lifting zone should be identified and cordonedoff to prevent
unauthorized entry into the lifting area with signage in place
 For cranes over 1 ton, an ASLI’s, radius load indicators and
motion limit switches other similar mechanism to achieve the
same effect must be fitted and operational by audio-visual
methods. The SWL must be indicated on crane and never
exceeded.
Approved by Name Nasser Ashour Designation Project Manager Signature Date 11-05-2019
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible

1
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 20.09.2022 Reference Number: A69
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Umair ali Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR INSTALLATION AND DISMANTLING OF LOADING PLATFORM
RISK RATING RISK LIKELIHOOD Risk Rating
RATING 6 & 9 = High Risk

SEVERITY
Severity-S Likelihood-L 3 & 4 = Medium Risk
3 2 1
1 & 2 = Low Risk
H Major Injury/ Pollution/ Damage H Likely 3 9 6 3 Risk Rating = S X L = R
M Minor/Pollution / Damage/ Loss M Possible 2 6 4 2
L Injury/Low Damage / Loss L Never/Very Unlikely 1 3 2 1
Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating
 Test load prior to lift by raising 150mm only.
 Load must be correctly slung and secured.
 All lifting equipment must be maintained to manufactures
instructions, generally weekly inspections by operative required.
accessories (chains, slings) must have a thorough
examinationafter 6 months and weekly inspection.
 Maintain a register of lifting tackles and appliances.
 Only experienced certified / competent operators / Riggers
should be allow to carry out lifting activities.
 Close monitoring and supervision of task should be ensured by
lifting supervisor and foreman / Engineer
 The risks involved in lifting activities should be well
communicated to all workers with adequate signage in place to
restrict unauthorized workers I the lifting zone.
 Proper housekeeping should be ensured around work area to
prevent trip, slip and fall during lifting activities

A69 Installation &  Falls from Height of workers – ☒Employees  Only competent qualified persons shall be employed for the ☒ Project Manager
Dismantling Loading Injury, fracture, death assembly, use and removal of Loading Platforms. ☒ Construction
Platform ☒Contractors  Adequate measures must be ensured to make sure that existing Manager
 Falling of Materials – head Injury to structure upon which the Loading Platform to be mounted on is
workers, loss of body parts / Sub ☒ Project Engineer
capable of carrying the imposed loads within the acceptable
criteria set by the Engineer. ☒ Foremen
2 1 2 2
 Possible load swing which can 2 3 6  Load testing of loading Platforms must be carried out in ☒ HSE for monitoring
lead to collision with other objects accordance with Dubai Municipality Code of construction
practice
 Ergonomics (Back/Waiste Pain) as  Engineer to ensure that all materials required for fixing and
a result of frequent stooping and installation of loading platform are available at site to prevent
bending of body abandoning the installation half way

Approved by Name Nasser Ashour Designation Project Manager Signature Date 11-05-2019
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible

2
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 20.09.2022 Reference Number: A69
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Umair ali Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR INSTALLATION AND DISMANTLING OF LOADING PLATFORM
RISK RATING RISK LIKELIHOOD Risk Rating
RATING 6 & 9 = High Risk

SEVERITY
Severity-S Likelihood-L 3 & 4 = Medium Risk
3 2 1
1 & 2 = Low Risk
H Major Injury/ Pollution/ Damage H Likely 3 9 6 3 Risk Rating = S X L = R
M Minor/Pollution / Damage/ Loss M Possible 2 6 4 2
L Injury/Low Damage / Loss L Never/Very Unlikely 1 3 2 1
Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating
 During the positioning of platform from slab edge, anchorage
point should be ensured by using a jack horizontally where
workers can anchore their harness when working close to the
slab edge to prevent fall
 Permit to work should be ensured prior installation/dismantling
of platform
 Ensure that the civil structure is complete and area of installation
is cleared for receiving of all materials
 Make sure all erection team are available at site and ready for
installation. HSE induction and pre start briefing should be given
to the erection team.
 Chain adjustment to tilt platform 30 degress forward when
raising into position due to possible swing when lifting
 Platform should be held stationary with tower crane during the
fixing process and adjusted to its designated location, according
to the approved drawing
 Ensure 5 meters part of the platform will rest on the floor slab,
5meters part will be projected and 12 to 15 props to be fixed on
both sides of the platform up to the slab soffit
 Ensure U-head to be used to hold the soldier beam at top of the
jack which will support the slab
 Approved drawing showing all the fixing and installation details
should be followed
 Cross bracings should be provided to support the jacks at the
top
 Tower crane to release the platform once all props are provided
and ensured that it will be tightened
 Hand rail/Mid rail to be providedb for the projected portion of the
platform with means to protect materils from falling (Toe Board)
 All the installation procedure to be carried out under qualified
supervisor and strict safety regulations
Approved by Name Nasser Ashour Designation Project Manager Signature Date 11-05-2019
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible

3
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 20.09.2022 Reference Number: A69
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Umair ali Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR INSTALLATION AND DISMANTLING OF LOADING PLATFORM
RISK RATING RISK LIKELIHOOD Risk Rating
RATING 6 & 9 = High Risk

SEVERITY
Severity-S Likelihood-L 3 & 4 = Medium Risk
3 2 1
1 & 2 = Low Risk
H Major Injury/ Pollution/ Damage H Likely 3 9 6 3 Risk Rating = S X L = R
M Minor/Pollution / Damage/ Loss M Possible 2 6 4 2
L Injury/Low Damage / Loss L Never/Very Unlikely 1 3 2 1
Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating
 Third party inspection to be conducted to get the clearance
certificate before using platform
 During dismantling of platform, The procedure should be done in
reverse way of the installation steps.
 Exclusion zone should be ensured with signage to restrict
workers from the area.
 Lifting Permit should be ensured with adequate supervision and
mobitoring of task.
 Ensure that all personnel involved in the use and installation of
the Platform read and understand the Method Statement and
Risk assessment.
A69 Use of Hand Tools ☒Employees  Ensure Job safety analysis (JSA) /Prestart briefing/TBT is given. ☒ Project Manager
 Falls of materials - Bruising, cuts &  Provision of Tool bags or belts while working. ☒ Construction Manager
sprains, puncturing, damage to ☒Contractors  Inspecting tools for loose and deficient parts. Report and replace ☒ Project Engineer
property immediately. ☒ Foremen
/ Sub
 Toe-boards and brick guards/netting in place to prevent ☒ HSE for monitoring
Noise/Vibration - Hand Arm 2 2 4 accidental dropping of tools or materials.
3 Vibration, Vibration White Finger  Wear appropriate PPE (Gloves/Goggles/Hearing 1 2 2
(VWF), WRULD’s Noise Induced protection/Head Protection and safety Footwear)
Hearing Loss, Tinnitus  Homemade tools are not to be used
 Tools should be suitably secured using tethers or tool arrestor to
prevent the fall of tools
 Proper storage facility should be provided for safe storage of
tools
A69 Use of PPE  Poor seal - Death, or serious injury ☒Employees  Employers must provide PPE, RPE, safety equipment at all ☒ Project Manager
(Personal times when necessary. ☒ Construction
 Failure of Equipment - Death or  Ensure that all PPE, RPE is assessed for suitability for job,
Protective serious injury
☒Contractors
limitations, capability, and compatibility with other PPE and does 1 2 2 Manager
Equipment) / Sub not present additional hazards. ☒ Project Engineer
2 3 6
–RPE ☒ Foremen

Approved by Name Nasser Ashour Designation Project Manager Signature Date 11-05-2019
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible

4
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 20.09.2022 Reference Number: A69
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Umair ali Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR INSTALLATION AND DISMANTLING OF LOADING PLATFORM
RISK RATING RISK LIKELIHOOD Risk Rating
RATING 6 & 9 = High Risk

SEVERITY
Severity-S Likelihood-L 3 & 4 = Medium Risk
3 2 1
1 & 2 = Low Risk
H Major Injury/ Pollution/ Damage H Likely 3 9 6 3 Risk Rating = S X L = R
M Minor/Pollution / Damage/ Loss M Possible 2 6 4 2
L Injury/Low Damage / Loss L Never/Very Unlikely 1 3 2 1
Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating
(Respiratory  Read manufacturer’s instructions for weaknesses and correct ☒ HSE for monitoring
Protective installation or wear.
 Training or information/instruction should be given on use,
Equipment), storage and maintenance theoretically and practically.
-Hard-Hats,  Ensure that PPE is adequate for job activity, and all operatives
4 -Harness exposed are warned by signage and toolbox talk / Prestart
–Respiratory briefing.
 Ensure that suitable storage is available for safety equipment on
-Masks site.
–Breathing  Safety harness should be inspected regularly prior use with the use
Apparatus of color coding as evidence of inspection.
–Ear Protection

A69 Housekeeping  Slip trip and fall ☒Employees  Waste management training for housekeeping team. ☒ Project Manager
activities  Use of Appropriate PPE for the special task such as safety ☒ Construction
 Sharp , protruding objects ejection goggles, rubberized hand gloves, gum boots with steel toe, etc...
into the body (foot)
☒Contractors Manager
2 2 4 / Sub  Damaged scaffolding m,aterials to be removed carefully. ☒ Project Engineer
 Barricading the area with appropriate safety signage ☒ Foremen
 Ergonomics / Manual Handling 1 2 2
leading to back/chest pain  Adequate competent supervision and monitoring of task. ☒ HSE for monitoring
 Daily Toolbox talks (Daily hazard identification & briefing) prior
5
start of work
 Equipment movement area shall be considered as exclusion
zone and adequate barricading and signage’s provided
 Manual handling training needs to be communicated to
housekeeping team to prevent ergonomics issues.
 Proper stacking of Scaffold materials should be ensured to
prevent trip and fall hazard.

Approved by Name Nasser Ashour Designation Project Manager Signature Date 11-05-2019
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible

5
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 20.09.2022 Reference Number: A69
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Umair ali Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR INSTALLATION AND DISMANTLING OF LOADING PLATFORM
RISK RATING RISK LIKELIHOOD Risk Rating
RATING 6 & 9 = High Risk

SEVERITY
Severity-S Likelihood-L 3 & 4 = Medium Risk
3 2 1
1 & 2 = Low Risk
H Major Injury/ Pollution/ Damage H Likely 3 9 6 3 Risk Rating = S X L = R
M Minor/Pollution / Damage/ Loss M Possible 2 6 4 2
L Injury/Low Damage / Loss L Never/Very Unlikely 1 3 2 1
Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating
A69 Manual handling – ☒Employees  Ensure Job safety analysis (JSA) /Prestart briefing/TBT is given ☒ Project Manager
 Slip ,trip & Fall due to poor
Carrying / shifting of  Adequate communication of Method statement & Risk ☒ Construction
housekeeping resulting to
Scaffold Jack assessment to work force prior start of tasks
fracture, loss of body parts ☒Contractors Manager
materials to work 2 2 4 / Sub  Trained workers only should assigned for the activity.
☒ Project Engineer
area.  First aider to be available with arranged first aid items at site
 Poor posture leading to Back pain, ☒ Foremen
Work related upper and lower limb first aid room and ERP arrangement should be put in place.
6  All access and egress to be clear from any obstructions ☒ HSE for monitoring
disorders, hand injuries/ bruises,
back, chest pain  Use of Appropriate PPE for the special task such as safety 1 2 2
goggles, hand gloves, etc...
 Appropriate Lightening, Maintain good Housekeeping to
prevent access obstruction, avoid loose trailing cables on
ground
 Use mechanical aids wherever practicable.
 Deploy adequate man power to reduce the manual handling
load (25kg per person).
A69 Working under ☒Employees  Provide adequate provision of first aid at site first aid center,
Adverse weather Physical condition of employee emergency arrangements &welfare facilities to protect from bad ☒ Project Manager
condition and  Hot Temperature / Humidity due weather, heat related illness.
to hot weather
☒Contractors ☒ Construction
fatigue. / Sub  Refreshments/job breaks for rest to be put in place Manager
 Long duration of work leading to  Ensure the availability of PIC ERT to tackle the emergencies like ☒ Project Engineer
7 2 2 4 Heat stress, etc. 1 2 2
fatigue, dehydration ☒ Foremen
 Awareness training shall be conducted for the work crew. ☒ HSE for monitoring
Physical condition of employee  Continuous supervision
due to previous ill health issues  Make sure adequate rest timing and job rotation are put in place
 Pre-employment screening should be carried out and workers
with existing health issues due to heat should be assigned jobs

Approved by Name Nasser Ashour Designation Project Manager Signature Date 11-05-2019
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible

6
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 20.09.2022 Reference Number: A69
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Umair ali Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR INSTALLATION AND DISMANTLING OF LOADING PLATFORM
RISK RATING RISK LIKELIHOOD Risk Rating
RATING 6 & 9 = High Risk

SEVERITY
Severity-S Likelihood-L 3 & 4 = Medium Risk
3 2 1
1 & 2 = Low Risk
H Major Injury/ Pollution/ Damage H Likely 3 9 6 3 Risk Rating = S X L = R
M Minor/Pollution / Damage/ Loss M Possible 2 6 4 2
L Injury/Low Damage / Loss L Never/Very Unlikely 1 3 2 1
Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating
that does not exposed them to hot humid weather and health
surveillance to be conducted at intervals
 The risks involved in such activity should be well communicated
to workers during TBT /’ Pre start briefing

A69 Use & Maintenance  Slip trip and fall due to poor ☒Employees  Ensure Job safety analysis (JSA) /Prestart briefing/TBT is given ☒ Project Manager
of Loading Platform housekeeping  Well trained maintenance staff to be ensured, ☒ Construction Manager
☒Contractors  Regular inspection should be carried out and damaged parts ☒ Project Engineer
 Sharp , protruding objects ejection should be replaced ☒ Foremen
into the body (foot) / Sub
 Loading platform should be approved by third party and load test ☒ HSE for monitoring
should be conducted
 Exclusion zone (Gate should be ensured to restrict unauthorized
 Improper and unsafe use of entry and usage
Platform.  Workers should not sit or rest on the platform
8 2 3 6  Adequate signage should be in place-emergency contact
 Ergonomics / Manual Handling details, 3rd party certificate copy, safe working load of the
leading to back/chest pain platform 1 2 2
 Exclusion zone should be made below the platform on the
 Collapse of Structures due to ground level and no worker should be allowed to work beneath
overload and damage leading to or enter the barricaded area.
death, injury  Close monitoring and supervision of task should be ensured and
the risks involved in such activity should be properly
 Falls from Height of workers - communicated.
Back Injury, Fractures, Cuts,  Sufficient dimensions to allow safe passage and safe use of
Bruises, Death equipment and materials
 Loading platform should be properly boarded to prevent fall of
work & materials with hand rail, mid rail & toe boards in place.
No gaps should be ensured.
Approved by Name Nasser Ashour Designation Project Manager Signature Date 11-05-2019
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible

7
RISK ASSESSMENT FORM
Project: Park Point 5AB Date: 20.09.2022 Reference Number: A69
Revision Number: 00
Risk Assessment completed by: Legislation: This risk assessment is in compliance with:
Name: Umair ali Federal Law No8, Year 1980, Ministerial Order No 32 and (Tick box):
☐OSHAD ☒Dubai municipality ☐EHS Trakhees
Designation: HSE Manager Signature: ☐Other (List)……………………………………
Description of the Task: RISK ASSESSMENT FOR INSTALLATION AND DISMANTLING OF LOADING PLATFORM
RISK RATING RISK LIKELIHOOD Risk Rating
RATING 6 & 9 = High Risk

SEVERITY
Severity-S Likelihood-L 3 & 4 = Medium Risk
3 2 1
1 & 2 = Low Risk
H Major Injury/ Pollution/ Damage H Likely 3 9 6 3 Risk Rating = S X L = R
M Minor/Pollution / Damage/ Loss M Possible 2 6 4 2
L Injury/Low Damage / Loss L Never/Very Unlikely 1 3 2 1
Legal Description of Task Hazard / Risk / Consequences Evaluation Person’s Actions required Evaluation Action by (Name & Date)
& RR before at risk. To reduce or control risks After
ref LXS= (Place X in LXS=
Risk box) Risk
Rating Rating
 Fall of material from height leading  Planned and scheduled maintenance scheme should be
to personal body injury ensured to help detect any sign of deterioration on time for quick
rectification
 Good housekeeping should be ensued always around working
platform
 Should not over loaded so as to give rise to a risk of collapse or
to any deformation that could affect its safe use.
 When dropping loads on platform by tower crane operator
 Materials should not be stored on loading platform
 Proper communication should be ensured between operator of
tower crane and rigger in placing the loads
Access to the loading platform should not be obstructed by
materials

Approved by Name Nasser Ashour Designation Project Manager Signature Date 11-05-2019
Note: Risk assessment should be completed by a site team member and a member of the safety department if possible