Professional Documents
Culture Documents
L ikelih o o d
4 - Major 4 M H H E E Administrative Control
Site Name: 5 - Catastrophic 3 L M H E E PPE
QATAR COOL, WESTBAY
Nominated Work LIKELIHOOD (L) of Occurrence 2 L L M H E
Acoustic Wall Cladding Risk Acceptance
1 - Rare 1 L L M H H Name of Employee Accepting
Date Develop: 11-02-2023. Rev 01 2 - Unlikely Controls should be selected based
Risk Level
Risk Level
Signature
PERSON’S AFFECTED: 1. Employee (E) 2. Subcontractor / Other Worker (S) 3. Public (P) RISK ASSESSMENT
CONTROLLE
RISK
HAZARD IDENTIFICATION D RISK
RATING
RATING
EFFECT
PERSONS OPPORTUNITIES FOR FUTHER
HAZARD OHS LOCATION / ACTIVITY What if the Hazard was L C R CONTROL MEASURES L C R
AFFECTED CONTROL
released?
1. Identify and verify the correct
equipment’s / facilities / services
where maintenance to be carried
out.
1. Risk Assessment
Method Statement
2. PTW
3.Training/competent
personnel
5.Only use the ladder for a short
Fatalities/fractures duration.
Location; QATAR COOL,
Property/material 6.Do not stand or lean on the top Ensure safe operations
ESP OHS WESTBAY 2 5 E 1 5 H
damage three rungs of a ladder. accordingly, H&S Training, Trained
Working on ladders
- Equipment Damage 7.One more Person to and competent employees.
Activity: Acoustic Wall
- Injuries to the stand at the foot of the
Cladding
public/personal injury ladder.
8. Maintain three points of
contact when climbing the ladder
9. Make sure the ladder is on a
stable surface.
10. PPE's-safety helmet, safety
harness, safety shoes
1. PTW
2. Segregate the generated waste
(Hazardous or Non Hazardous Metal
Waste disposal
& Nonmetal) and keep in the HSE Site specific Induction
Build up on rubbish
ESP OHS Location; QATAR COOL, 3 4 E appropriate location with label in safe 1 3 M
on the working Rubbish on track
WESTBAY manner
environment and Buildup of rubbish Emergency awareness training
3.Keep suitable capacity and enough
surrounding area Emergency evacuation
Activity: Acoustic Wall number of skips in appropriate
Cladding location to collect the waste
4.Ensure there is no chance of
spillage of waste.